Guadalupe building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Guadalupe, Arizona.
Last verified 2026-07-06 · Source · Embed this page’s badge · Version history
Building department
- Address
- 9241 S. Avenida del Yaqui, Guadalupe, AZ 85283
- Phone
- 480-505-5370
- Office hours
- Town Hall: Monday - Friday, 8 a.m. - 5 p.m. Completed Building Permit Applications and three (3) sets of plans may be submitted in person at the Town Hall front office or emailed to the Building Inspector at binspector@guadalupeaz.org. Note: the current Building Inspector of record on the Town's live website (guadalupeaz.org) is Bill Hedrix — this supersedes the 2025 Arizona Building Officials (AZBO) Directory listing of a prior inspector, which appears out of date.
- Website
- Official site
Inspection guide
See how inspections work in Guadalupe — sequence, scheduling & re-inspection fees.
Codes adopted
Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.
- Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/town authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Guadalupe is a small incorporated town (population approx. 5,000-5,500) that independently adopts and administers its own construction codes through its Building Safety Department / Building Inspector; it does not defer permitting to Maricopa County. Source: Town of Guadalupe Code of Ordinances, Chapter 150 (Building Codes), via American Legal Publishing code library (codelibrary.amlegal.com/codes/guadalupe), current through Ordinance O2024.02 (passed 11-14-2024) — Chapter 150 itself was last substantively amended by Ord. O2020.08 and O2020.19 (both passed 4-23-2020).
- Uniform Building Code, 2012 Edition (UBC 2012), as published by the International Conference of Building Officials, adopted by reference as the Town's Uniform Building Code (Town Code § 150.01(A)). This is notably an older code family (Uniform Codes, not the newer International Codes / ICC family used by most other Maricopa County cities) — confirmed current as of the live Town Code, not merely a stale directory listing. Source: Town of Guadalupe Code of Ordinances § 150.01, ADOPTION OF BUILDING CODE (1989 Code, § 7-1-1; Ord. 2001-01, passed 1-25-2001; Ord. 2006-01, passed 3-9-2006; Ord. 2012-02, passed 7-27-2012; Ord. O2020.08, passed 4-23-2020; Ord. O2020.19, passed 4-23-2020).
- National Electrical Code, 2011 Edition (NEC 2011), as published by the National Fire Protection Association, adopted by reference as the Town's Electrical Code (Town Code § 150.15). Source: Town of Guadalupe Code of Ordinances § 150.15 (1989 Code, § 7-2; Ord. 2001-01, passed 1-25-2001; Ord. O2020.08, passed 4-23-2020).
- Uniform Mechanical Code, 2012 Edition (UMC 2012), as published by the International Conference of Building Officials, adopted by reference as the Town's Mechanical Code (Town Code § 150.16). Source: Town of Guadalupe Code of Ordinances § 150.16 (1989 Code, § 7-3; Ord. 2001-01, passed 1-25-2001; Ord. O2020.08, passed 4-23-2020).
- Uniform Plumbing Code, 2012 Edition (UPC 2012), as published by the International Conference of Building Officials, adopted by reference as the Town's Plumbing Code (Town Code § 150.17). Source: Town of Guadalupe Code of Ordinances § 150.17 (1989 Code, § 7-4; Ord. 2001-01, passed 1-25-2001; Ord. O2020.08, passed 4-23-2020).
- Uniform Code for the Abatement of Dangerous Buildings, most current edition, adopted by reference (Town Code § 150.18); three copies on file with the Town Manager/Clerk, made a public record by Resolution 95-17. Source: Town of Guadalupe Code of Ordinances § 150.18 (1989 Code, § 7-7; Ord. 95-02, passed 8-24-1995; Res. 95-17, passed 8-24-1995; Ord. O2020.08, passed 4-23-2020).
- The building official / administrative authority for all building, plumbing, electrical, or other inspections under Chapter 150 is vested in the office of the Town Manager, who may authorize deputies (in practice, the Building Inspector) to perform inspection work. Source: Town of Guadalupe Code of Ordinances § 150.19, BUILDING OFFICIAL (1989 Code, § 7-5).
- Manufactured homes, mobile homes, modular buildings, and recreational vehicles are separately regulated under Town Code § 150.21 (Dwelling Unit Standards), which incorporates federal manufactured-housing construction standards (National Manufactured Home Construction and Safety Standards Act of 1974) and imposes Town-specific siting, foundation, and occupancy rules; manufactured home placement additionally requires a Conditional Use Permit from the Town Council (approx. 60-day process, $50 application fee, $25 continuance fee) before a building permit can issue. Source: Town of Guadalupe Code of Ordinances § 150.21; Town of Guadalupe Manufactured Home Requirements (rev. 02/07/2020).
Permit types & fees
Residential Building Permit (New Construction)
Required prior to constructing any new single-family residential structure, or an improvement involving more than 25% of an existing structure, in the Town of Guadalupe. Reviewed against the 2012 Uniform Building Code (UBC) as adopted and amended by the Town. Applications are submitted with three (3) sets of plans in person at Town Hall or by email to the Building Inspector.
Residential Addition / Remodel Permit
Required for room additions, remodels, garage conversions, patio covers/porches, balconies/decks, and other alterations to existing dwellings in the Town of Guadalupe when the work is new construction or affects more than 25% of the existing structure. Reviewed against the 2012 UBC as adopted by the Town; the Town's own Building Permit Application form has dedicated line items for Room Addition, Tenant Improvement, Patio Cover/Porch, Balcony/Deck, and Garage Conversion.
Electrical Permit
Required for electrical installation, alteration, or repair work in the Town of Guadalupe, governed by the 2011 National Electrical Code (NEC) as adopted by the Town. The Town's Building Permit Application has dedicated fields for new electrical service, sub-panels, outlets/switches, and motors/transformers/generators.
Plumbing Permit
Required for plumbing installation, alteration, or repair work in the Town of Guadalupe, governed by the 2012 Uniform Plumbing Code (UPC) as adopted by the Town. The Town's Building Permit Application itemizes water closets, lavatories, bathtubs/showers, kitchen sinks, water heaters, gas outlets, sewer connections, and private sewage systems.
Mechanical / HVAC Permit
Required for heating, ventilation, and air conditioning installations in the Town of Guadalupe, governed by the 2012 Uniform Mechanical Code (UMC) as adopted by the Town. The Town's Building Permit Application itemizes FAU (forced air units), boilers/compressors, air handlers, floor/wall/suspended heaters, spray booths/exhaust hoods, ventilation fans, and ductwork.
Re-Roofing Permit
Required for re-roofing (re-roof and/or tear-off) in the Town of Guadalupe. The Town's Building Permit Application has dedicated fields for Re-Roof (square footage of material) and Tear-Off, reviewed under the 2012 UBC as adopted by the Town.
Demolition Permit
Required for demolition of any structure in the Town of Guadalupe. The Town's Building Permit Application has a dedicated Demolition section (# of Structures, Sewer cap off).
Manufactured Home Installation Permit
Required for placement of a manufactured home in the Town of Guadalupe, a two-step process: first a Conditional Use Permit from the Town Council, then a building permit from the Building Safety Department. Governed by Town Code § 150.21 (Dwelling Unit Standards) and the Town's dedicated Manufactured Home Requirements document (rev. 02/07/2020).
Residential Solar Photovoltaic (PV) Permit
Required for installation of rooftop or ground-mount solar photovoltaic systems within Guadalupe town limits. The Town uses a single combined Building/Electrical/Mechanical/Plumbing Permit Application; a solar installation is submitted on this same form, checking both the Building (structural/racking) and Electrical (New service/Other Electrical) trade sections. No dedicated solar/photovoltaic fee line exists -- the Town does not publish a separate flat-fee electrical schedule, so both the structural and electrical scopes are computed from contract valuation using the same Building Permit Fee table (ADOPTED April 23, 2020) that governs all other permit types. Fees are also capped by Arizona's statewide solar-permit statute, A.R.S. 9-468.
EV Charger / Electric Vehicle Charging Station Permit
Installing an EV charger circuit in Guadalupe requires the Town's combined Building Permit Application (Building/Electrical/Mechanical/Plumbing), governed by the 2011 National Electrical Code (NEC) as locally adopted. The form's Electrical section has itemized fields for 'New service (amps),' 'Sub panels,' '# of Outlets, Switches,' 'Motor, Transformer, Generator,' '# of Electrical SIGNS,' 'Temp. Power Pole,' and a catch-all 'Other Electrical' field -- confirmed by direct inspection of the current fillable PDF -- but no dedicated EV-charger/EVSE field. An EV charger circuit is billed under the same general valuation-based Building Permit Fee table used for all other electrical work, entered via the 'Sub panels' field (if a subpanel is added) or the 'Other Electrical' catch-all field (for a straightforward dedicated circuit).
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- No data reported
- Trailing 12 months
- No data reported
- Year to date (2026 YTD)
- No data reported
- Full year 2025
- 3units
3 buildings · $600,000 valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity
Tips & gotchas
- Arizona has no statewide mandatory building code — the Town of Guadalupe independently adopts and amends its own construction codes through its Building Safety Department; it does not defer to Maricopa County for permitting within town limits.
- Guadalupe is unusual among Maricopa County municipalities in still using the older Uniform Codes family rather than the International Codes: 2012 Uniform Building Code (UBC), 2012 Uniform Mechanical Code (UMC), 2012 Uniform Plumbing Code (UPC), and 2011 National Electrical Code (NEC). This was confirmed as genuinely current — not a stale directory artifact — by reading the Town's own live Code of Ordinances (Chapter 150), which shows these same code editions still in force as of the current supplement (current through Ordinance O2024.02, passed 11-14-2024; Chapter 150 itself last amended by Ord. O2020.08/O2020.19, both passed 4-23-2020).
- The Town does NOT use the Uniform Building Code's own Table 1-A valuation fee schedule — Town Code § 150.01(B) explicitly states that schedule 'is not adopted,' and instead the Town Council adopts its own fee table 'from time to time' (§ 150.20). The table currently in force was adopted April 23, 2020.
- A genuine discrepancy exists between two Town-published copies of the same April 23, 2020 fee table: the American Legal Publishing-hosted Code of Ordinances (§ 150.01(B)) and the Town's own attached Fee Schedule exhibit on its fillable Building Permit Application show different marginal per-$1,000 rates in several valuation brackets. This dataset uses the Town's own attached PDF fee schedule as authoritative (it carries the exact adoption date cited in the ordinance history and is the document applicants actually use), while flagging the amlegal-hosted figures for transparency in each affected permit type's fees/notes.
- There is no separate flat-fee schedule for electrical, plumbing, mechanical, re-roofing, or demolition permits — all permit types are billed from the same single valuation-based Building Permit Fee table (a $50 minimum for $1-$500 valuation, scaling up through $9,700 + $4/additional $1,000 above $1,000,000), unlike some larger Maricopa County cities that itemize flat fees per fixture/unit/permit-subtype.
- The Town's own Plan Review / Inspections page publishes a general plan-review timeline — approximately 1-2 weeks for initial review, 4-6 weeks for full plan review on complex projects, with simple residential additions/remodels/small commercial projects reviewed faster — but this is NOT broken out by individual permit type. Every standard permit type in this dataset (building, addition/remodel, electrical, plumbing, mechanical, re-roofing) uses this same general range (7-42 calendar days) because no permit-type-specific timeline is published.
- Demolition permits are a confirmed real, actively-issued permit category (the Town's own Building Permit Application has a dedicated Demolition section with '# of Structures' and 'Sewer cap off' fields), but no permit-specific review timeline was found for demolition distinct from the Town's general plan-review guidance — reviewTimelineVerified is honestly set to false for this permit type rather than stretching the general range to cover it.
- Manufactured home placement is a two-step, more involved process unique among the baseline permit types: a Conditional Use Permit (with a Town Council public hearing, ~60 days, $50 fee) must be obtained BEFORE a building permit application, which itself carries a $750 sewer connection fee on top of the standard valuation-based building permit fee.
- No dedicated residential solar photovoltaic (PV) permit page, checklist, application track, or fee line item was found anywhere on the Town's official website, Code of Ordinances, or Building Permit Application/Fee Schedule as of this review (July 2026), despite Arizona's A.R.S. § 9-468 statute addressing solar construction permit standards statewide. A solar PV permit type was therefore NOT included in this dataset rather than force-fitting it to the general Building Permit Fee table with no town-specific solar guidance to cite — solar installations in Guadalupe would need to be confirmed directly with the Building Inspector (480-505-5370) as falling under the general Electrical Permit / Building Permit process.
- The current Building Inspector of record per the Town's live website is Bill Hedrix (binspector@guadalupeaz.org, 480-505-5370) — this differs from and supersedes the 2025 Arizona Building Officials (AZBO) Directory listing (which named a different inspector), confirming the AZBO Directory entry for Guadalupe was out of date at the time of this research.