Skip to main content
PermitBase

Residential Building Permit (New Construction) in Guadalupe, Arizona

Required prior to constructing any new single-family residential structure, or an improvement involving more than 25% of an existing structure, in the Town of Guadalupe. Reviewed against the 2012 Uniform Building Code (UBC) as adopted and amended by the Town. Applications are submitted with three (3) sets of plans in person at Town Hall or by email to the Building Inspector.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required prior to any new construction or any improvement involving more than 25% of an existing structure (Town Code § 150.20)
  • Plans reviewed against the 2012 Uniform Building Code (UBC 2012) as adopted by the Town, with Town-specific Dwelling Unit Standards (§ 150.21): minimum 24-ft livable width, minimum 3:12 roof pitch or equivalent parapet/mansard treatment, permitted exterior facade materials, permanent concrete/masonry foundation
  • Completed Permit Application plus three (3) sets of construction plans must be submitted (site plan with setbacks and existing/proposed structures, demolition plans if applicable, landscape details, foundation plan, floor plans, structural details)
  • Project is first reviewed for zoning compliance before proceeding to plan review (plan check)
  • Must also conform to the Town's zoning ordinance in addition to Chapter 150 (Town Code § 150.02)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Based on ValuationTown of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020.' A parallel republication of this same fee table in the Town Code of Ordinances § 150.01(B), hosted by American Legal Publishing, shows slightly different marginal per-$1,000 rates in several brackets (see localAmendments note on this discrepancy) — this dataset uses the Town's own attached Fee Schedule PDF as authoritative.
$50 (valuation $1-$500); $50 + $5 per additional $100 to $2,000; $150 + $21 per additional $1,000 to $25,000; $850 + $19 per additional $1,000 to $50,000; $1,450 + $10 per additional $1,000 to $100,000; $2,150 + $8 per additional $1,000 to $500,000; $6,000 + $6 per additional $1,000 to $1,000,000; $9,700 + $4 per additional $1,000 above $1,000,000
Inspections outside normal business hours (minimum 2 hours)Or the total hourly cost to the Town, whichever is greater, per Town of Guadalupe Fee Schedule (ADOPTED April 23, 2020)
$50 per hour
Reinspection feeTown of Guadalupe Fee Schedule (ADOPTED April 23, 2020)
$50 per hour
Inspection with no fee specifically indicated (minimum 1 hour)Town of Guadalupe Fee Schedule (ADOPTED April 23, 2020)
$120 per hour
Additional plan review required by changes, additions, or revisions to plansTown of Guadalupe Fee Schedule (ADOPTED April 23, 2020)
$120 per hour

Review timeline

Plan reviewGuadalupe’s published plan-review target
7–42 business days

How long did your Residential Building Permit (New Construction) permit actually take in Guadalupe?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Required before concrete pour; permanent concrete or masonry foundation required per Town Code § 150.21(I)

  2. 2

    Framing

    Structural framing per 2012 UBC as adopted by the Town

  3. 3

    Final

    All work complete per approved plans; scheduled with the Building Inspector (binspector@guadalupeaz.org, 480-505-5360/5370), minimum 2-3 business days' advance notice required

See the full Guadalupe inspection guide — scheduling & re-inspection fees →

Tips

  • Per the Town's Plan Review / Inspections page: initial review takes approximately 1-2 weeks, and full plan review for complex projects takes approximately 4-6 weeks; simple residential additions, remodels, and small commercial projects may be reviewed more quickly. This dataset's reviewTimelineDays (7-42 calendar days) spans that full published range.
  • The Town uses the older Uniform Building Code (2012 edition) family rather than the newer International Building Code/International Residential Code used by most other Maricopa County cities — this is a genuine, currently-in-force code choice confirmed on the Town's live Code of Ordinances, not a stale directory listing.
  • Three (3) physical sets of plans are requested on the permit application, though an electronic copy is preferred per the Town's Plan Review / Inspections page.
  • This permit becomes null and void if construction is not begun within 180 days of issuance, or if work is suspended/abandoned for 180 days, per the Town's Building Permit Application provisions.

Frequently asked questions

Yes — a building permit is required prior to constructing any new structure, or any improvement involving more than 25% of an existing structure, per Town Code § 150.20. The Town's FAQ page confirms most construction projects, including new buildings, additions, remodels, and some repairs, require a permit.

In Guadalupe, the published Building Permit Fee — Based on Valuation is: $50 (valuation $1-$500); $50 + $5 per additional $100 to $2,000; $150 + $21 per additional $1,000 to $25,000; $850 + $19 per additional $1,000 to $50,000; $1,450 + $10 per additional $1,000 to $100,000; $2,150 + $8 per additional $1,000 to $500,000; $6,000 + $6 per additional $1,000 to $1,000,000; $9,700 + $4 per additional $1,000 above $1,000,000. Additional published fees: Inspections outside normal business hours (minimum 2 hours) — $50 per hour; Reinspection fee — $50 per hour; Inspection with no fee specifically indicated (minimum 1 hour) — $120 per hour; Additional plan review required by changes, additions, or revisions to plans — $120 per hour. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the Town's Plan Review / Inspections page, initial review takes approximately 1-2 weeks, and full plan review for complex projects takes approximately 4-6 weeks. Simple residential additions, remodels, and small commercial projects may be reviewed more quickly.

You'll need: Permit Application (Town of Guadalupe Building Safety Department); Site Plan; Foundation Plan, Floor Plans, and Structural Details. See the required-documents checklist on this page for details on each.

Guadalupe requires 3 inspection(s) for a residential building permit (new construction), in order: Foundation, Framing, Final. Schedule each through Town of Guadalupe Building Safety Department / Building Inspector (480-505-5370).

Apply through Town of Guadalupe Building Safety Department / Building Inspector at 9241 S. Avenida del Yaqui, Guadalupe, AZ 85283. Phone: 480-505-5370, email: binspector@guadalupeaz.org. Office hours: Town Hall: Monday - Friday, 8 a.m. - 5 p.m. Completed Building Permit Applications and three (3) sets of plans may be submitted in person at the Town Hall front office or emailed to the Building Inspector at binspector@guadalupeaz.org. Note: the current Building Inspector of record on the Town's live website (guadalupeaz.org) is Bill Hedrix — this supersedes the 2025 Arizona Building Officials (AZBO) Directory listing of a prior inspector, which appears out of date.. Official information: https://www.guadalupeaz.org/1214/Building-Construction-Planning-Zoning.

The 2012 Uniform Building Code (UBC), as adopted and amended by the Town of Guadalupe (Town Code § 150.01), plus Town-specific Dwelling Unit Standards under § 150.21 covering minimum livable space, roof pitch, and exterior materials.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Guadalupe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.