Guadalupe building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Guadalupe, Arizona.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 9241 S. Avenida del Yaqui, Guadalupe, AZ 85283
- Phone
- 480-505-5370
- Office hours
- Town Hall: Monday - Friday, 8 a.m. - 5 p.m. Completed Building Permit Applications and three (3) sets of plans may be submitted in person at the Town Hall front office or emailed to the Building Inspector at binspector@guadalupeaz.org. Note: the current Building Inspector of record on the Town's live website (guadalupeaz.org) is Bill Hedrix — this supersedes the 2025 Arizona Building Officials (AZBO) Directory listing of a prior inspector, which appears out of date.
- Website
- Official site
Published scheduling rules
- Inspections must be requested 24 hours in advance by emailing binspector@guadalupeaz.org or calling 480-505-5360. (Residential Solar Photovoltaic (PV) Permit)
- Inspections must be requested 24 hours in advance by emailing binspector@guadalupeaz.org or calling 480-505-5360 (EV Charger / Electric Vehicle Charging Station Permit)
Inspection sequence
Applies to: Commercial Building Permit
- 1
Foundation
Required before concrete pour
- 2
Framing
Structural framing per 2012 UBC as adopted by the Town
- 3
Final
All work complete per approved plans; scheduled with the Building Inspector (binspector@guadalupeaz.org, 480-505-5360/5370), minimum 2-3 business days' advance notice required
Applies to: Manufactured Home Installation Permit
- 1
Foundation
Ground-set permanent foundation verified per Town detail or engineer-stamped plan
- 2
Electrical Panel
Inspected jointly by the Town of Guadalupe and Salt River Project (SRP)
- 3
Final / Certificate of Occupancy
Town of Guadalupe must issue a Certificate of Occupancy before the manufactured home may be occupied
Applies to: Residential Building Permit (New Construction)
- 1
Foundation
Required before concrete pour; permanent concrete or masonry foundation required per Town Code § 150.21(I)
- 2
Framing
Structural framing per 2012 UBC as adopted by the Town
- 3
Final
All work complete per approved plans; scheduled with the Building Inspector (binspector@guadalupeaz.org, 480-505-5360/5370), minimum 2-3 business days' advance notice required
Applies to: Electrical Permit
- 1
Rough-In
Wiring, box placement, and panel connections before walls are closed
- 2
Final
Devices installed and connections verified per 2011 NEC as adopted by the Town; scheduled with the Building Inspector with 2-3 business days' notice
Applies to: Fire Sprinkler and Fire Alarm System Permit
- 1
Rough-In / Underground
Sprinkler piping, alarm wiring, and device placement verified before concealment, per AFMA's Community Risk Management Division
- 2
Final Acceptance Test
Hydrostatic/flow acceptance test (fire sprinkler systems) or full functional test (fire alarm systems) witnessed by AFMA before the system is placed in service
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and equipment placement before walls closed
- 2
Final
Equipment operational, clearances verified; scheduled with the Building Inspector with 2-3 business days' notice
Applies to: Plumbing Permit
- 1
Underground/Rough-In
Before concrete pour or wall closure — verify pipe slope, materials, cleanouts, and connections
- 2
Final
Fixtures connected, water heater and gas connections verified, no leaks; scheduled with the Building Inspector with 2-3 business days' notice
Applies to: Residential Addition / Remodel Permit
- 1
Foundation/Framing
Required for additions before concrete pour and after framing, respectively, where applicable to the scope of work
- 2
Final
Completed work verified against approved plans; scheduled with the Building Inspector with 2-3 business days' notice
Applies to: Residential Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement verified before energizing
- 2
Final Inspection
Racking/roof-penetration attachment, electrical connections, and interconnection point verified; inspections must be requested 24 hours in advance by emailing binspector@guadalupeaz.org or calling 480-505-5360
Applies to: Sign Permit
- 1
Rough Electrical (illuminated signs only)
Wiring and connections verified before the sign face/cabinet is closed
- 2
Final
Sign construction, placement, and (if applicable) electrical connections verified; scheduled with the Building Inspector, minimum 2-3 business days' advance notice
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Guadalupe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Guadalupe building permits