Guadalupe building permits

Verified

Guadalupe, Arizona — as published 2026-07-07.

Verified 2026-07-06 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/town authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Guadalupe is a small incorporated town (population approx. 5,000-5,500) that independently adopts and administers its own construction codes through its Building Safety Department / Building Inspector; it does not defer permitting to Maricopa County. Source: Town of Guadalupe Code of Ordinances, Chapter 150 (Building Codes), via American Legal Publishing code library (codelibrary.amlegal.com/codes/guadalupe), current through Ordinance O2024.02 (passed 11-14-2024) — Chapter 150 itself was last substantively amended by Ord. O2020.08 and O2020.19 (both passed 4-23-2020).Uniform Building Code, 2012 Edition (UBC 2012), as published by the International Conference of Building Officials, adopted by reference as the Town's Uniform Building Code (Town Code § 150.01(A)). This is notably an older code family (Uniform Codes, not the newer International Codes / ICC family used by most other Maricopa County cities) — confirmed current as of the live Town Code, not merely a stale directory listing. Source: Town of Guadalupe Code of Ordinances § 150.01, ADOPTION OF BUILDING CODE (1989 Code, § 7-1-1; Ord. 2001-01, passed 1-25-2001; Ord. 2006-01, passed 3-9-2006; Ord. 2012-02, passed 7-27-2012; Ord. O2020.08, passed 4-23-2020; Ord. O2020.19, passed 4-23-2020).National Electrical Code, 2011 Edition (NEC 2011), as published by the National Fire Protection Association, adopted by reference as the Town's Electrical Code (Town Code § 150.15). Source: Town of Guadalupe Code of Ordinances § 150.15 (1989 Code, § 7-2; Ord. 2001-01, passed 1-25-2001; Ord. O2020.08, passed 4-23-2020).Uniform Mechanical Code, 2012 Edition (UMC 2012), as published by the International Conference of Building Officials, adopted by reference as the Town's Mechanical Code (Town Code § 150.16). Source: Town of Guadalupe Code of Ordinances § 150.16 (1989 Code, § 7-3; Ord. 2001-01, passed 1-25-2001; Ord. O2020.08, passed 4-23-2020).Uniform Plumbing Code, 2012 Edition (UPC 2012), as published by the International Conference of Building Officials, adopted by reference as the Town's Plumbing Code (Town Code § 150.17). Source: Town of Guadalupe Code of Ordinances § 150.17 (1989 Code, § 7-4; Ord. 2001-01, passed 1-25-2001; Ord. O2020.08, passed 4-23-2020).Uniform Code for the Abatement of Dangerous Buildings, most current edition, adopted by reference (Town Code § 150.18); three copies on file with the Town Manager/Clerk, made a public record by Resolution 95-17. Source: Town of Guadalupe Code of Ordinances § 150.18 (1989 Code, § 7-7; Ord. 95-02, passed 8-24-1995; Res. 95-17, passed 8-24-1995; Ord. O2020.08, passed 4-23-2020).The building official / administrative authority for all building, plumbing, electrical, or other inspections under Chapter 150 is vested in the office of the Town Manager, who may authorize deputies (in practice, the Building Inspector) to perform inspection work. Source: Town of Guadalupe Code of Ordinances § 150.19, BUILDING OFFICIAL (1989 Code, § 7-5).Manufactured homes, mobile homes, modular buildings, and recreational vehicles are separately regulated under Town Code § 150.21 (Dwelling Unit Standards), which incorporates federal manufactured-housing construction standards (National Manufactured Home Construction and Safety Standards Act of 1974) and imposes Town-specific siting, foundation, and occupancy rules; manufactured home placement additionally requires a Conditional Use Permit from the Town Council (approx. 60-day process, $50 application fee, $25 continuance fee) before a building permit can issue. Source: Town of Guadalupe Code of Ordinances § 150.21; Town of Guadalupe Manufactured Home Requirements (rev. 02/07/2020).

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required prior to constructing any new single-family residential structure, or an improvement involving more than 25% of an existing structure, in the Town of Guadalupe. Reviewed against the 2012 Uniform Building Code (UBC) as adopted and amended by the Town. Applications are submitted with three (3) sets of plans in person at Town Hall or by email to the Building Inspector.

Verified 2026-07-06 · Source

Requirements

  • Building permit required prior to any new construction or any improvement involving more than 25% of an existing structure (Town Code § 150.20)
  • Plans reviewed against the 2012 Uniform Building Code (UBC 2012) as adopted by the Town, with Town-specific Dwelling Unit Standards (§ 150.21): minimum 24-ft livable width, minimum 3:12 roof pitch or equivalent parapet/mansard treatment, permitted exterior facade materials, permanent concrete/masonry foundation
  • Completed Permit Application plus three (3) sets of construction plans must be submitted (site plan with setbacks and existing/proposed structures, demolition plans if applicable, landscape details, foundation plan, floor plans, structural details)
  • Project is first reviewed for zoning compliance before proceeding to plan review (plan check)
  • Must also conform to the Town's zoning ordinance in addition to Chapter 150 (Town Code § 150.02)

Required documents

  • RequiredPermit Application (Town of Guadalupe Building Safety Department)Fillable Town of Guadalupe Building Permit Application; return completed application with three (3) sets of plans to the Building Safety Department at Town Hall or email to binspector@guadalupeaz.org
  • RequiredSite PlanShowing setbacks and all existing and proposed structures, including items to remain or be removed
  • RequiredFoundation Plan, Floor Plans, and Structural DetailsComplete construction drawing set; an electronic copy is preferred

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation$50 (valuation $1-$500); $50 + $5 per additional $100 to $2,000; $150 + $21 per additional $1,000 to $25,000; $850 + $19 per additional $1,000 to $50,000; $1,450 + $10 per additional $1,000 to $100,000; $2,150 + $8 per additional $1,000 to $500,000; $6,000 + $6 per additional $1,000 to $1,000,000; $9,700 + $4 per additional $1,000 above $1,000,000Town of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020.' A parallel republication of this same fee table in the Town Code of Ordinances § 150.01(B), hosted by American Legal Publishing, shows slightly different marginal per-$1,000 rates in several brackets (see localAmendments note on this discrepancy) — this dataset uses the Town's own attached Fee Schedule PDF as authoritative.
Inspections outside normal business hours (minimum 2 hours)$50 per hourOr the total hourly cost to the Town, whichever is greater, per Town of Guadalupe Fee Schedule (ADOPTED April 23, 2020)
Reinspection fee$50 per hourTown of Guadalupe Fee Schedule (ADOPTED April 23, 2020)
Inspection with no fee specifically indicated (minimum 1 hour)$120 per hourTown of Guadalupe Fee Schedule (ADOPTED April 23, 2020)
Additional plan review required by changes, additions, or revisions to plans$120 per hourTown of Guadalupe Fee Schedule (ADOPTED April 23, 2020)

Residential Addition / Remodel Permit

Verified

Required for room additions, remodels, garage conversions, patio covers/porches, balconies/decks, and other alterations to existing dwellings in the Town of Guadalupe when the work is new construction or affects more than 25% of the existing structure. Reviewed against the 2012 UBC as adopted by the Town; the Town's own Building Permit Application form has dedicated line items for Room Addition, Tenant Improvement, Patio Cover/Porch, Balcony/Deck, and Garage Conversion.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for room additions, remodels, tenant improvements, patio covers/porches, balconies/decks, and garage conversions that constitute new construction or affect more than 25% of the existing structure (Town Code § 150.20)
  • Town of Guadalupe Building Permit Application has dedicated fields for Room Addition (sq ft), Tenant Improvement (sq ft), Patio Cover/Porch (sq ft), Balcony/Deck (sq ft), and Garage Conversion (sq ft)
  • Site plan required showing setbacks and all existing and proposed structures, including items to remain or be removed
  • Must also conform to the Town's zoning ordinance, including setback requirements (Town Code § 150.02)

Required documents

  • RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted with three (3) sets of plans in person at Town Hall or by email to binspector@guadalupeaz.org
  • RequiredSite PlanShowing existing structure, addition/remodel footprint, and setbacks

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (same table as new construction)$50 (valuation $1-$500) up to $9,700 + $4 per additional $1,000 above $1,000,000 (full bracket table under residential-building-permit)Town of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' — the Town does not publish a separate valuation table for additions/remodels distinct from new construction; both are billed from the same Building Permit Fee table
Additional plan review required by changes, additions, or revisions to plans$120 per hourTown of Guadalupe Fee Schedule (ADOPTED April 23, 2020)

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in the Town of Guadalupe, governed by the 2011 National Electrical Code (NEC) as adopted by the Town. The Town's Building Permit Application has dedicated fields for new electrical service, sub-panels, outlets/switches, and motors/transformers/generators.

Verified 2026-07-06 · Source

Requirements

  • Electrical permit required for new service, sub-panels, outlets/switches, and motor/transformer/generator installation, governed by the 2011 NEC as adopted by the Town (Town Code § 150.15)
  • Town of Guadalupe Building Permit Application has dedicated fields for: New service (amps), Sub panels (# and amps), # of Outlets/Switches, and Motor/Transformer/Generator (# and HP)
  • Temporary Power Pole permits (including number of sub-poles) are a distinct line item on the same application

Required documents

  • RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted in person at Town Hall or by email to binspector@guadalupeaz.org; includes Contractor's License # and Class Code fields

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (same table as new construction; electrical work valuation reviewed under the same Building Permit Fee table)$50 minimum (valuation $1-$500), scaling per the Town's valuation-based Building Permit Fee tableTown of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' — the Town does not publish a separate flat-fee electrical fee schedule; electrical permit fees are computed from contract valuation using the same Building Permit Fee table as all other permit types

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in the Town of Guadalupe, governed by the 2012 Uniform Plumbing Code (UPC) as adopted by the Town. The Town's Building Permit Application itemizes water closets, lavatories, bathtubs/showers, kitchen sinks, water heaters, gas outlets, sewer connections, and private sewage systems.

Verified 2026-07-06 · Source

Requirements

  • Plumbing permit required for installation/alteration/repair of fixtures, water heaters, and gas piping, governed by the 2012 UPC as adopted by the Town (Town Code § 150.17)
  • Town of Guadalupe Building Permit Application itemizes: Water Closets, Lavatories, Bathtubs/Showers, Floor Drains, Kitchen Sinks, Laundry Trays, Clothes Washers, Water Heaters, # of Gas Outlets, Sewer Connections, Private Sewage System, and On-Site Sewer/Water
  • Manufactured home installations require a dedicated $750 sewer connection fee in addition to the standard building permit fee

Required documents

  • RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted in person at Town Hall or by email to binspector@guadalupeaz.org

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (same table as new construction)$50 minimum (valuation $1-$500), scaling per the Town's valuation-based Building Permit Fee tableTown of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' — no separate flat per-fixture plumbing fee schedule is published; fees are computed from contract valuation
Sewer Connection Fee (manufactured home installations)$750Town of Guadalupe Manufactured Home Requirements (rev. 02/07/2020) — applies specifically to manufactured home building permits, not general plumbing work

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations in the Town of Guadalupe, governed by the 2012 Uniform Mechanical Code (UMC) as adopted by the Town. The Town's Building Permit Application itemizes FAU (forced air units), boilers/compressors, air handlers, floor/wall/suspended heaters, spray booths/exhaust hoods, ventilation fans, and ductwork.

Verified 2026-07-06 · Source

Requirements

  • Mechanical permit required for installation, replacement, or relocation of HVAC equipment and ventilation systems, governed by the 2012 UMC as adopted by the Town (Town Code § 150.16)
  • Town of Guadalupe Building Permit Application itemizes: FAU up to/over 100,000 BTU, Boilers/Compressors (Max 3 HP/100,000 Btu and Max 15 HP/100,000 Btu tiers), Air Handler (up to/over 10,000 cfm), Floor/Wall/Suspended Heater, Spray Booth/Exhaust Hood, Ventilation (Bath) Fan, and Ductwork

Required documents

  • RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted in person at Town Hall or by email to binspector@guadalupeaz.org

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (same table as new construction)$50 minimum (valuation $1-$500), scaling per the Town's valuation-based Building Permit Fee tableTown of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' — no separate flat mechanical/HVAC fee schedule (e.g., no flat AC-replacement fee) is published; fees are computed from contract valuation

Re-Roofing Permit

Verified

Required for re-roofing (re-roof and/or tear-off) in the Town of Guadalupe. The Town's Building Permit Application has dedicated fields for Re-Roof (square footage of material) and Tear-Off, reviewed under the 2012 UBC as adopted by the Town.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for re-roofing; the Town's Building Permit Application has dedicated 'Re-Roof' (sq. ft. of material) and 'Tear-Off' (yes/no) fields
  • Reviewed against the 2012 UBC as adopted by the Town (Town Code § 150.01)
  • Must conform to the Town's Dwelling Unit Standards roof-pitch/roofline requirements where applicable to the structure (Town Code § 150.21(D))

Required documents

  • RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted in person at Town Hall or by email to binspector@guadalupeaz.org; indicate Re-Roof square footage of material and whether a Tear-Off is included

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (same table as new construction)$50 minimum (valuation $1-$500), scaling per the Town's valuation-based Building Permit Fee tableTown of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' — no separate flat re-roofing fee is published; fees are computed from contract valuation

Demolition Permit

Verified

Required for demolition of any structure in the Town of Guadalupe. The Town's Building Permit Application has a dedicated Demolition section (# of Structures, Sewer cap off).

Verified 2026-07-06 · Source

Requirements

  • Building permit required before demolishing a structure within Town limits; the Town's Building Permit Application has a dedicated Demolition section with '# of Structures' and 'Sewer cap off' fields
  • Demolition plans, where applicable, are part of the plan submittal requirements described on the Town's Plan Review / Inspections page
  • Governed generally by the 2012 UBC and the Uniform Code for the Abatement of Dangerous Buildings, most current edition, as adopted by the Town (Town Code § 150.01, § 150.18)

Required documents

  • RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted in person at Town Hall or by email to binspector@guadalupeaz.org; indicate number of structures and whether sewer cap-off is required
  • OptionalDemolition PlansRequired if applicable, per the Town's Plan Review / Inspections submittal requirements

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (same table as new construction)$50 minimum (valuation $1-$500), scaling per the Town's valuation-based Building Permit Fee tableTown of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020' — no separate flat demolition fee is published; fees are computed from contract valuation

Manufactured Home Installation Permit

Verified

Required for placement of a manufactured home in the Town of Guadalupe, a two-step process: first a Conditional Use Permit from the Town Council, then a building permit from the Building Safety Department. Governed by Town Code § 150.21 (Dwelling Unit Standards) and the Town's dedicated Manufactured Home Requirements document (rev. 02/07/2020).

Verified 2026-07-06 · Source

Requirements

  • Property owner or representative must first obtain a Conditional Use Permit (CUP) to locate a manufactured home on a lot; this includes a public hearing before the Guadalupe Town Council
  • After CUP approval, a building permit must be obtained from the Town of Guadalupe; building permit fees are based on the value of the manufactured home and include a $750 sewer connection fee
  • Manufactured homes may not be placed on any lot with frontage on Avenida del Yaqui or Guadalupe Road, and must be owner-occupied (Resolution 95-19)
  • Must be ground-set on a permanent foundation per the Town's detail packet or an engineer-stamped foundation plan
  • Installation instructions meeting HUD Title 24 Subpart A-3285.2 must be submitted with the building permit
  • Electrical panels must be inspected by both the Town of Guadalupe and Salt River Project (SRP)
  • Must meet all minimum yard setbacks within the zoning district, including patios and carports
  • Must have an affixed decal certifying HUD-compliant inspection and construction
  • A Certificate of Occupancy must be issued by the Town before the manufactured home may be occupied
  • Modifications to manufactured homes are prohibited; repairs/modifications exceeding 50% of the unit's floor/wall/roof area are prohibited and grounds for removal

Required documents

  • RequiredConditional Use Permit ApplicationRequired before a building permit can be sought; includes a public hearing before Town Council (approx. 60-day processing time)
  • RequiredPermit Application (Town of Guadalupe Building Safety Department)Submitted after CUP approval; submitted in person at Town Hall or by email to binspector@guadalupeaz.org
  • RequiredEngineer-Stamped Foundation Plan (or Town-provided foundation detail)Required for ground-set permanent foundation installation
  • RequiredHUD Title 24 Subpart A-3285.2 Installation InstructionsManufacturer's installation instructions from the Office of Manufactured Housing, submitted with the building permit

Fee schedule

Fee typeAmountNotes
Conditional Use Permit Application Fee$50Town of Guadalupe Manufactured Home Requirements (rev. 02/07/2020)
Public Hearing Continuance Fee (if requested)$25 per occurrenceTown of Guadalupe Manufactured Home Requirements (rev. 02/07/2020)
Building Permit Fee — Based on Valuation of the manufactured home$50 minimum (valuation $1-$500), scaling per the Town's valuation-based Building Permit Fee tableTown of Guadalupe Building Permit Application, attached Fee Schedule exhibit, 'ADOPTED April 23, 2020'
Sewer Connection Fee$750Town of Guadalupe Manufactured Home Requirements (rev. 02/07/2020)

Residential Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mount solar photovoltaic systems within Guadalupe town limits. The Town uses a single combined Building/Electrical/Mechanical/Plumbing Permit Application; a solar installation is submitted on this same form, checking both the Building (structural/racking) and Electrical (New service/Other Electrical) trade sections. No dedicated solar/photovoltaic fee line exists -- the Town does not publish a separate flat-fee electrical schedule, so both the structural and electrical scopes are computed from contract valuation using the same Building Permit Fee table (ADOPTED April 23, 2020) that governs all other permit types. Fees are also capped by Arizona's statewide solar-permit statute, A.R.S. 9-468.

Verified 2026-07-20 · Source

Requirements

  • Town of Guadalupe Building Permit Application (combined Building/Electrical/Mechanical/Plumbing form) submitted with three (3) sets of plans to the Building Safety Department
  • Construction plans must indicate the location of the photovoltaic system installation, including roof plan and elevation, mounting details, and an electrical diagram, per A.R.S. 9-468 -- unless a qualifying online automated permitting platform is used, in which case a one-line or three-line electrical diagram is not required
  • Per A.R.S. 9-468, any building or permit fee assessed by the Town for solar construction must be attributable to and cover only the actual expense of the service, and must not exceed the actual cost of issuing the permit
  • Per A.R.S. 9-468, the Town may not require a stamp from a professional engineer for a solar photovoltaic system unless an engineering stamp is deemed necessary, with written justification provided
  • Electrical work valuation is reviewed under the same Building Permit Fee table as the structural scope, consistent with this corpus's existing electrical-permit entry for Guadalupe -- the Town does not publish a separate flat-fee electrical schedule

Required documents

  • RequiredTown of Guadalupe Building Permit Application (fillable)Combined Building/Electrical/Mechanical/Plumbing form; check both Building and Electrical trade sections for a solar installation, and submit three sets of plans
  • RequiredConstruction plans with roof plan/elevation, mounting details, and electrical diagramPer A.R.S. 9-468; a one-line/three-line electrical diagram may be waived if a qualifying online automated permitting platform is used

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1.00 to $500.00$50.00Town of Guadalupe Building Permit Application, Fee Schedule exhibit, ADOPTED April 23, 2020 -- no dedicated solar/photovoltaic fee line exists; the structural (Building) scope of a solar installation is billed under this general valuation table
Building Permit Fee — valuation $2,001.00 to $25,000.00 (typical residential solar range)$150.00 for the first $2,000.00 plus $21.00 for each additional $1,000.00 or fraction thereofFee Schedule exhibit, ADOPTED April 23, 2020
Electrical Permit Fee (New service/Other Electrical trade section)Same valuation-based Building Permit Fee table as aboveTown does not publish a separate flat-fee electrical schedule; electrical work for a solar installation is computed from contract valuation using the same table, consistent with this corpus's existing electrical-permit entry for Guadalupe
Reinspection fee$50.00 per hourFee Schedule exhibit, ADOPTED April 23, 2020
Additional plan review required by changes, additions, or revisions to plans$120.00 per hourFee Schedule exhibit, ADOPTED April 23, 2020

EV Charger / Electric Vehicle Charging Station Permit

Verified

Installing an EV charger circuit in Guadalupe requires the Town's combined Building Permit Application (Building/Electrical/Mechanical/Plumbing), governed by the 2011 National Electrical Code (NEC) as locally adopted. The form's Electrical section has itemized fields for 'New service (amps),' 'Sub panels,' '# of Outlets, Switches,' 'Motor, Transformer, Generator,' '# of Electrical SIGNS,' 'Temp. Power Pole,' and a catch-all 'Other Electrical' field -- confirmed by direct inspection of the current fillable PDF -- but no dedicated EV-charger/EVSE field. An EV charger circuit is billed under the same general valuation-based Building Permit Fee table used for all other electrical work, entered via the 'Sub panels' field (if a subpanel is added) or the 'Other Electrical' catch-all field (for a straightforward dedicated circuit).

Verified 2026-07-20 · Source

Requirements

  • Submit the Town's combined Building Permit Application, checking the Electrical section -- use the 'Sub panels' field if the EV charger install adds a new subpanel, or the 'Other Electrical' catch-all field for a straightforward dedicated circuit off the existing panel; there is no dedicated EV-charger field
  • Declare the contract valuation of the electrical work; the fee is computed from the Town's general valuation-based Building Permit Fee table (Fee Schedule exhibit, ADOPTED April 23, 2020) -- the same table used for all other permit types
  • Unlike solar (A.R.S. 9-468, which caps solar permit fees at the Town's actual cost of issuance), no equivalent Arizona statutory fee cap was found for EV charger permits -- the full valuation-based fee schedule applies without a statutory ceiling
  • Inspections must be requested 24 hours in advance by emailing binspector@guadalupeaz.org or calling 480-505-5360
  • The permit becomes null and void if construction is not begun within 180 days of issuance, or if work is suspended/abandoned for 180 days, per the Town's own application form

Required documents

  • RequiredTown of Guadalupe Building Permit Application (Electrical section)Combined Building/Electrical/Mechanical/Plumbing form; no EV-specific field exists -- use the 'Sub panels' or 'Other Electrical' field

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1.00 to $500.00$50.00Town of Guadalupe Building Permit Application, Fee Schedule exhibit, ADOPTED April 23, 2020 -- no dedicated 'EV charger'/'EVSE' fee line exists; a straightforward EV charger circuit is billed under this general valuation table via the form's 'Sub panels' or 'Other Electrical' field, confirmed by direct inspection of the current fillable PDF.
Building Permit Fee — valuation $2,001.00 to $25,000.00 (e.g. if bundled with a service/panel upgrade)$150.00 for the first $2,000.00 plus $21.00 for each additional $1,000.00 or fraction thereofFee Schedule exhibit, ADOPTED April 23, 2020
Reinspection fee$50.00 per hourFee Schedule exhibit, ADOPTED April 23, 2020
Additional plan review required by changes, additions, or revisions to plans$120.00 per hourFee Schedule exhibit, ADOPTED April 23, 2020

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Guadalupe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →

Permalink: /arizona/maricopa-county/guadalupe/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 371a356

Reproducible from PermitBase’s version-controlled dataset, commit 371a356.