This is PermitBase’s published record for Litchfield Park as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Litchfield Park building permits

Verified

Litchfield Park, Arizona — as published 2026-07-06.

Verified 2026-07-06 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Litchfield Park runs its own Building Safety Department, independently adopts and administers its own construction codes, and does not defer permitting to Maricopa County. Source: City of Litchfield Park Building Safety page (litchfieldpark.gov/57/Building-Safety).2018 International Building Code (IBC), as adopted by the Mayor and Council of the City of Litchfield Park, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes (effective January 1, 2020) and the City's Building Safety page, which lists this as a 'Current Adopted Code' (verified live as of July 2026, with no newer edition adoption found on the City's site, municipal code, or in web searches for 2021/2024 code-cycle updates).2018 International Residential Code (IRC), adopted by reference, with City of Litchfield Park amendments (including an amended Table R301.2(1) Climatic and Geographic Design Criteria and amended Table R301.5 Live Loads), effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.2018 International Mechanical Code (IMC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.2018 International Plumbing Code (IPC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.2017 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference (Section 101.4.9 of the amended IBC, applying to all buildings except one- and two-family dwellings which fall under the IRC electrical provisions), with City amendments. Note: the electrical code cycle is one edition behind the 2018 ICC set, consistent with typical AZ practice. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.2018 International Fuel Gas Code (IFGC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.2018 International Existing Building Code (IEBC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.2018 International Energy Conservation Code (IECC), adopted by reference, with City amendments, effective January 1, 2020. Energy codes have applied to new construction since 2009 per the City's Residential Energy Improvements guideline brochure (Brochure #8, July 2017), requiring energy-efficient windows/doors, higher insulation levels, and energy-efficient A/C for homes built after that date. Source: City of Litchfield Park Amendments to 2018 International Codes; 'Guidelines When Building Within the City' Brochure #8 — Residential Energy Improvements.2018 International Property Maintenance Code (IPMC), adopted by reference. Source: City of Litchfield Park Amendments to 2018 International Codes.2018 International Fire Code (IFC), adopted by reference as the City's uniform fire code, with City amendments; adopted appendices are limited to Appendix B (Fire Flow Requirements), Appendix D (Fire Apparatus Access Roads), and Appendix H (Hazardous Materials Management Plan/Hazardous Materials Inventory Statement Instructions) — all other IFC appendices are NOT adopted unless specifically referenced. Source: City of Litchfield Park Amendments to 2018 International Codes.2010 ADA Standards for Accessible Design, together with ICC A117.1 Accessibility code, the Arizonans with Disabilities Act (A.R.S. Title 41, Chapter 9, Article 8), and its Implementing Rules (A.A.C. Title 10, Chapter 3, Article 4); in the event of a conflict between codes, the more restrictive standard applies. Source: City of Litchfield Park Amendments to 2018 International Codes (IBC Section 101.4.8 amendment); City of Litchfield Park Building Safety page.Permit expiration/abandonment rule (amended Section 106.4.3 of the Building Code and Section 105.3.1 of the Fire Code): an application for a permit for any proposed work is deemed abandoned 180 days after the date of filing unless pursued in good faith or a permit has been issued; the Building Official may grant one extension of up to 180 days upon written request showing justifiable cause, provided no changes have been made to the original construction documents and the suspension/abandonment has not exceeded one year. Source: City of Litchfield Park Amendments to 2018 International Codes.

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family dwelling construction in the City of Litchfield Park. Reviewed against the 2018 IRC and City of Litchfield Park amendments (effective January 1, 2020). Applications are submitted at the Building Safety office, 214 W. Wigwam Blvd., using the City's Building Permit Application.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new single-family dwelling construction within Litchfield Park city limits
  • Plans must comply with the 2018 IRC and City amendments, including the amended Climatic and Geographic Design Criteria (90 mph wind, Exposure B; Seismic Design Category B; 34°F winter design temperature; moderate-to-heavy termite potential; 12-inch frost depth)
  • City Code requires each residence to provide covered parking for two vehicles
  • Construction documents must be submitted per the City's Residential Drawing Submittal Package requirements
  • Application submitted in person at the Building Safety office (214 W. Wigwam Blvd.) using the Building Permit Application form, selecting 'Residential' as the project type
  • Building permit fee is Based on Valuation (BOV), using the current Building Valuation Data jointly published by Building Safety Journal and the International Code Council

Required documents

  • RequiredBuilding Permit ApplicationCity of Litchfield Park Building Permit Application, submitted at the Building Safety office or by email to building@litchfieldpark.gov; requires project, applicant, property owner, and contractor information plus project valuation and square footage
  • RequiredResidential Drawing Submittal PackageCity of Litchfield Park's required construction document package for residential submittals
  • RequiredSite/Plot PlanLot dimensions, easements, setbacks, and structure locations
  • RequiredConstruction DocumentsPer the City's 'Construction Documents' guideline (Brochure #3)

Fee schedule

Fee typeAmountNotes
Building Permit — New Residential ConstructionBOV (Based on Valuation)City of Litchfield Park Citywide Fee Schedule FY2026 (effective 8/1/2025), Section 3 Building Safety; valuation determined using the current Building Valuation Data published by Building Safety Journal and the International Code Council
Plan Review$100 per hour (minimum 1 hour) for changes/revisions to approved plans; standard new-home plan review is BOV-basedCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Residential Trusses (deferred submittal)$175City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Certificate of Occupancy, Residential, per building$100City of Litchfield Park Citywide Fee Schedule FY2026, Section 3

Residential Addition / Remodel Permit

Verified

Required for room additions and remodels to existing single-family dwellings in Litchfield Park, including conversions of existing under-roof space (e.g., patio enclosures, carport-to-garage conversions) to livable area. Reviewed against the 2018 IRC as adopted and amended by the City.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for residential additions and remodels affecting structural or life-safety elements
  • Conversion of existing under-roof space (enclosures) to livable residential area, with no changes to the structure, is billed at 50% of the Valuation Chart for R-3 occupancies based on the new livable area
  • Carport/garage conversions and patio enclosures require Design Review Board (DRB) approval before a building permit application can be accepted, since they alter the building's exterior appearance
  • Conversions to livable space must provide an emergency egress window at least 8% of the new room's square footage (half of that area operable), air conditioning in the new space, and fire-rated separation from an attached garage where applicable
  • Plans must comply with City of Litchfield Park Design Criteria (90 mph wind, Exposure B; Seismic Design Category B)

Required documents

  • RequiredBuilding Permit ApplicationSubmitted at the Building Safety office, selecting 'Residential' as project type
  • RequiredResidential Drawing Submittal PackageCity of Litchfield Park submittal package for additions/remodels
  • RequiredSite/Plot PlanShowing existing structure, addition footprint, and setbacks
  • OptionalDesign Review Board ApprovalRequired prior to permit application for any project altering the building's exterior appearance (additions, carport conversions, patio enclosures)

Fee schedule

Fee typeAmountNotes
Residential AdditionBOV (Based on Valuation)City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety
Residential RemodelBOV (Based on Valuation)City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Conversion of Existing Space to Livable (Residential only, enclosures under existing roof, no structural changes)50% of Valuation Chart for R-3, based on new livable areaCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Unfinished BasementBOV (Based on Valuation)City of Litchfield Park Citywide Fee Schedule FY2026, Section 3

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in Litchfield Park, governed by the 2017 National Electrical Code (NEC) as adopted and amended by the City. Simple electrical permits such as panel replacement may be issued over the counter.

Verified 2026-07-06 · Source

Requirements

  • Electrical permit required for meter clearances, panel work, service entrance changes, temporary power, and other hard-wired electrical work
  • Governed by the 2017 NEC as adopted by the City of Litchfield Park (applies to all buildings except one- and two-family dwellings, which fall under the IRC electrical provisions)
  • Minor electrical repairs (lamp/fixture replacement, outlet/switch style changes, connecting approved portable equipment to existing approved receptacles) do NOT require a permit
  • Simple permits, such as replacement of an electrical panel, can be issued over the counter without plan review
  • Application submitted at the Building Safety office using the Building Permit Application

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSubmitted at the Building Safety office

Fee schedule

Fee typeAmountNotes
Electrical Meter Clearance without repair$35City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety
Electrical — Commercial (new construction)15% of Permit FeeCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Repair/Replace/Add Panel, 400 amps or less$100City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Repair/Replace/Add Panel, 401-999 amps$150City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Repair/Replace/Add Panel, over 1,000 amps$250City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Temporary Power$100City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
De-rate$75City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Electrical, Hotel/Motel/Inn (new or repair), per unit$50 per unitCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in Litchfield Park, governed by the 2018 International Plumbing Code (IPC) as adopted and amended by the City. Water heater replacement is a common simple permit.

Verified 2026-07-06 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping
  • Governed by the 2018 IPC as adopted by the City of Litchfield Park
  • State and federal law require low-flow water fixtures for new installations
  • Minor plumbing repairs (clearing stoppages, repairing leaks) not involving replacement/rearrangement of valves, pipes, or fixtures do NOT require a permit
  • Simple permits such as water heater replacement can be issued over the counter

Required documents

  • RequiredBuilding/Plumbing Permit ApplicationSubmitted at the Building Safety office

Fee schedule

Fee typeAmountNotes
Repair — Residential Repipe$75City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety
New Residential Plumbing$50City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
New Commercial Plumbing15% of permit feeCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Water Heater — new/replacement, gas, electric, or tankless$50City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Gas Line — New$100City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Gas Line — Repair only$50City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Gas Test/Clearance Only$150City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Plumbing, Hotel/Motel/Inn (new or repair), per unit$50 per unitCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installation or replacement in Litchfield Park, governed by the 2018 International Mechanical Code (IMC) as adopted and amended by the City. Current codes require a minimum SEER rating of 18 for new units.

Verified 2026-07-06 · Source

Requirements

  • Mechanical permit required for installation, replacement, or relocation of HVAC equipment and ductwork
  • Governed by the 2018 IMC as adopted by the City of Litchfield Park
  • Current building codes require a minimum SEER rating of 18 for new HVAC units
  • New codes require all ductwork to be insulated; a duct test can reveal leaks in existing systems
  • Simple HVAC replacement permits can typically be issued over the counter

Required documents

  • RequiredBuilding/Mechanical Permit ApplicationSubmitted at the Building Safety office

Fee schedule

Fee typeAmountNotes
HVAC — Residential new unit/Replacement$150City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety
HVAC — With new/additional ductwork (add to above fee)$35City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
HVAC — Commercial unit replacement (each)$150City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
HVAC — Hotel Repair/Replacement, per unit$75City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Mechanical — Residential New Construction$50City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Mechanical — Commercial New Construction15% of Permit feeCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Mechanical — Repair/Replacement$35City of Litchfield Park Citywide Fee Schedule FY2026, Section 3

Re-Roofing Permit

Verified

Required for residential and commercial re-roofing in Litchfield Park when not covered by the City's limited permit exemption for like-for-like, non-fire-rated-required roofing material replacement. Governed by the 2018 IRC/IBC roofing provisions.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for re-roofing, EXCEPT the exemption: re-roofing using the SAME roofing materials as the existing roof, provided the roof is not required to be fire-resistive
  • Roof plan/material listing required showing existing framing, square footage, existing material, sheathing detail, and proposed material for any non-exempt re-roof
  • Shingle or tile full replacement is billed as a flat fee; sheathing replacement is a separate line item

Required documents

  • RequiredBuilding Permit Application (Re-Roofing)Submitted at the Building Safety office
  • RequiredRoof Plan/Material ListingExisting and proposed roofing material, sheathing, and square footage

Fee schedule

Fee typeAmountNotes
Roof Replacement — Shingles or tile, full replacement only$100City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety
Roof Replacement — Sheathing replaced$50City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Integrated Roof Systems (e.g., roof-integrated solar)BOV (Based on Valuation)City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, listed under Photovoltaic Systems

Residential Solar Photovoltaic (PV) / Solar Water Heater Permit

Verified

Required for installation of rooftop residential solar photovoltaic (PV) systems, solar water heating panels, or solar space-heating/pool-heating panels in Litchfield Park. All solar systems require both a building permit and Design Review Board (DRB) approval, since roof-mounted panels alter the building's exterior appearance.

Verified 2026-07-06 · Source

Requirements

  • Photovoltaic (PV) solar systems converting sunlight to electricity, solar panels used for water heating, and solar panels used for space heating/cooling or pool heating all require a permit and inspections
  • The addition of roof-mounted solar panels alters the appearance of a building's exterior; the project must be reviewed and approved by the City's Design Review Board (DRB) BEFORE a building permit application can be made
  • The City's building permit fee for solar system projects is a flat fee covering plan review, inspection, and related administrative services
  • Battery/Energy Storage System (ESS) installations are billed and permitted separately from the PV system itself

Required documents

  • RequiredBuilding Permit ApplicationSubmitted at the Building Safety office, following required Design Review Board approval
  • RequiredDesign Review Board SubmittalRequired prior to building permit application for any roof-mounted solar installation, since it alters the building's exterior appearance
  • RequiredSite Plan and Roof LayoutPanel placement, racking, and electrical interconnection details

Fee schedule

Fee typeAmountNotes
Solar PV System — Residential, <9,601 kW (i.e., standard-size residential systems, per the Fee Schedule's stated threshold)$200City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety, Photovoltaic Systems
Solar PV System — Residential, >9,601 kW$300City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Solar PV System — CommercialBOV (Based on Valuation)City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Solar Water Heater$100 (permit) — a separate $50 Solar Water Heater line also appears in the Fee Schedule's Roof Replacement section; the City should be asked to clarify which applies to a given projectCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3; two distinct 'Solar Water Heater' fee lines ($100 and $50) appear in different parts of the published schedule table
ESS — Energy Storage System (battery), per system$100 per system (also separately listed as $150 for 'Battery Storage System')City of Litchfield Park Citywide Fee Schedule FY2026, Section 3; the schedule lists both an ESS line ($100/system) and a Battery Storage System line ($150) — verify which applies with Building Safety for a specific project
Standard Plan Review — Solar PV or Water Heater$100City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Plan Review

Demolition Permit

Verified

Required for demolition of any residential, commercial, or accessory structure in Litchfield Park.

Verified 2026-07-06 · Source

Requirements

  • Building permit required before demolishing a residential, commercial, or accessory structure within Litchfield Park city limits
  • Site plan required showing lot dimensions and location of the structure to be demolished
  • Utilities must be terminated prior to demolition

Required documents

  • RequiredBuilding Permit ApplicationSubmitted at the Building Safety office, selecting 'Other' or the appropriate project type for demolition
  • RequiredSite PlanShowing the structure(s) to be demolished and remaining site conditions

Fee schedule

Fee typeAmountNotes
Demolition — Accessory Structure$25City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety
Demolition — Residential Building$150City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Demolition — Commercial Building$200City of Litchfield Park Citywide Fee Schedule FY2026, Section 3

Swimming Pool / Spa Permit

Verified

Required for installation of an in-ground swimming pool, spa, or above-ground spa in Litchfield Park. Governed by the City's Pools, Spas & Barriers guideline and A.R.S. § 36-1681 barrier requirements. Pools 18 inches deep or less do not require a permit.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for in-ground swimming pools, in-ground spas, free-standing spas, and semi-public pools; pools under 18 inches deep are exempt
  • Site plan required showing pool/spa location, equipment, existing house doors, gates, and fencing
  • Barrier must comply with A.R.S. § 36-1681 and City Code: minimum 5-foot non-climbable enclosure with self-closing/self-latching gates (latch hardware at least 54 inches above ground), OR self-closing/self-latching door hardware where the residence forms part of the barrier
  • New/replacement suction covers must be anti-entrapment compliant (curved, not flat) with two suction inlets, per the federal Virginia Graeme-Baker Act
  • Two inspections required during new in-ground pool construction (pre-gunite and pre-plaster); only one inspection required for an above-ground pool or manufactured spa
  • A.R.S. § 36-1681(E): anyone selling, renting, or leasing a property with a pool/spa must give the buyer/renter a pool safety notice as required by the Arizona Department of Health Services

Required documents

  • RequiredBuilding Permit ApplicationSubmitted at the Building Safety office, selecting 'Pool/Spa' as project type
  • RequiredSite PlanPool/spa location, equipment, existing house doors, gates, and fencing/barrier layout

Fee schedule

Fee typeAmountNotes
In-ground Swimming Pool$500City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety, Pools and Spas
Spa (in-ground), add for lone unit or in combination with pool$50City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Spa (free-standing), includes electrical$100City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Semi-public pool$750City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Standard Plan Review — Pools$50City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Plan Review
Residential Site Plans (standard SFD and Pool submittals) — revisions$50City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Plan Review

Patio Cover / Ramada / Gazebo Permit

Verified

Required for patios, decks, ramadas, gazebos, and shade structures in Litchfield Park. Metal/alumawood patios, fabric shade structures, and wood conventional-construction patios are each billed at different valuation rates per square foot.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for patio covers, ramadas, gazebos, and shade structures affixed to or independent of the residence
  • Design Review Board approval may be required if the structure is visible from the street or alters the property's exterior appearance
  • Structures under 120 sq ft that are one-story and detached may be exempt (see general accessory-structure exemption), but attached patio covers and any structure affecting egress or setbacks require review

Required documents

  • RequiredBuilding Permit ApplicationSubmitted at the Building Safety office, selecting 'Patio/Ramada' as project type
  • RequiredSite PlanStructure location, dimensions, and setback verification

Fee schedule

Fee typeAmountNotes
Patio/Deck/Ramada/Gazebo — Metal/'alumawood' patio, lattice, or awningBOV of $15 per sq. ft.City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety
Patio/Deck/Ramada/Gazebo — Shade Structure, fabric free-standingBOV of $7 per sq. ft.City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Patio/Deck/Ramada/Gazebo — Wood (conventional construction)BOV of $15 per sq. ft.City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Residential Patio Enclosure — Glass or ScreenBOV of $15 per sq. ft.City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Standard Plan Review — Alum. Patio or Awning$75City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Plan Review

Fencing Permit

Verified

Required for fences, masonry/retaining walls, and wrought iron fencing in Litchfield Park. The City's 2018 code amendment reduced the general no-permit fence-height threshold to 3 feet (lower than the unamended IBC/IRC standard).

Verified 2026-07-06 · Source

Requirements

  • Fences not over 3 feet high do not require a building permit, per the City's amendment to IBC Section 105.2 (Building Item 2)
  • Fences over 3 feet, masonry/retaining walls, and wrought iron fencing require a permit
  • Pool barrier fences must independently comply with A.R.S. § 36-1681 and City pool barrier standards regardless of the general fence permit threshold
  • Fee is based on linear footage of fence/wall

Required documents

  • RequiredBuilding Permit ApplicationSubmitted at the Building Safety office
  • RequiredSite PlanFence/wall location and linear footage

Fee schedule

Fee typeAmountNotes
Fencing — Add to existing heightBOV of $2 per linear ft.City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety
Fencing — Masonry or retainingBOV of $5 per linear ft.City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
Fencing — Wrought IronBOV of $2 per linear ft.City of Litchfield Park Citywide Fee Schedule FY2026, Section 3

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Litchfield Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-07) →View current record →All versions →

Permalink: /arizona/maricopa-county/litchfield-park/as-of/2026-07-06/

Snapshot date: 2026-07-06

Commit: dc55cde

Reproducible from PermitBase’s version-controlled dataset, commit dc55cde.