Litchfield Park building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Litchfield Park, Arizona.
Last verified 2026-07-06 · Source · Embed this page’s badge · Version history
Building department
- Address
- 214 W. Wigwam Boulevard, Litchfield Park, AZ 85340
- Phone
- 623-935-1066
- Office hours
- Monday - Friday, 7:00 a.m. to 4:00 p.m. Fax: 623-935-5427. Chief Building Official: Brian Bertucci (623-889-6222, bbertucci@litchfieldpark.gov). Building Safety & Public Works Administrative Assistant: Stacey Frederico (sfrederico@litchfieldpark.gov). Applications submitted at City Hall or online via the City's building permit application system; inspections can also be scheduled by emailing Building Safety.
- Website
- Official site
- Permit portal
- Apply online at Litchfield Park's portal
Inspection guide
See how inspections work in Litchfield Park — sequence, scheduling & re-inspection fees.
Codes adopted
Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.
- Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Litchfield Park runs its own Building Safety Department, independently adopts and administers its own construction codes, and does not defer permitting to Maricopa County. Source: City of Litchfield Park Building Safety page (litchfieldpark.gov/57/Building-Safety).
- 2018 International Building Code (IBC), as adopted by the Mayor and Council of the City of Litchfield Park, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes (effective January 1, 2020) and the City's Building Safety page, which lists this as a 'Current Adopted Code' (verified live as of July 2026, with no newer edition adoption found on the City's site, municipal code, or in web searches for 2021/2024 code-cycle updates).
- 2018 International Residential Code (IRC), adopted by reference, with City of Litchfield Park amendments (including an amended Table R301.2(1) Climatic and Geographic Design Criteria and amended Table R301.5 Live Loads), effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.
- 2018 International Mechanical Code (IMC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.
- 2018 International Plumbing Code (IPC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.
- 2017 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference (Section 101.4.9 of the amended IBC, applying to all buildings except one- and two-family dwellings which fall under the IRC electrical provisions), with City amendments. Note: the electrical code cycle is one edition behind the 2018 ICC set, consistent with typical AZ practice. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.
- 2018 International Fuel Gas Code (IFGC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.
- 2018 International Existing Building Code (IEBC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.
- 2018 International Energy Conservation Code (IECC), adopted by reference, with City amendments, effective January 1, 2020. Energy codes have applied to new construction since 2009 per the City's Residential Energy Improvements guideline brochure (Brochure #8, July 2017), requiring energy-efficient windows/doors, higher insulation levels, and energy-efficient A/C for homes built after that date. Source: City of Litchfield Park Amendments to 2018 International Codes; 'Guidelines When Building Within the City' Brochure #8 — Residential Energy Improvements.
- 2018 International Property Maintenance Code (IPMC), adopted by reference. Source: City of Litchfield Park Amendments to 2018 International Codes.
- 2018 International Fire Code (IFC), adopted by reference as the City's uniform fire code, with City amendments; adopted appendices are limited to Appendix B (Fire Flow Requirements), Appendix D (Fire Apparatus Access Roads), and Appendix H (Hazardous Materials Management Plan/Hazardous Materials Inventory Statement Instructions) — all other IFC appendices are NOT adopted unless specifically referenced. Source: City of Litchfield Park Amendments to 2018 International Codes.
- 2010 ADA Standards for Accessible Design, together with ICC A117.1 Accessibility code, the Arizonans with Disabilities Act (A.R.S. Title 41, Chapter 9, Article 8), and its Implementing Rules (A.A.C. Title 10, Chapter 3, Article 4); in the event of a conflict between codes, the more restrictive standard applies. Source: City of Litchfield Park Amendments to 2018 International Codes (IBC Section 101.4.8 amendment); City of Litchfield Park Building Safety page.
- Permit expiration/abandonment rule (amended Section 106.4.3 of the Building Code and Section 105.3.1 of the Fire Code): an application for a permit for any proposed work is deemed abandoned 180 days after the date of filing unless pursued in good faith or a permit has been issued; the Building Official may grant one extension of up to 180 days upon written request showing justifiable cause, provided no changes have been made to the original construction documents and the suspension/abandonment has not exceeded one year. Source: City of Litchfield Park Amendments to 2018 International Codes.
Permit types & fees
Residential Building Permit (New Construction)
Required for new single-family dwelling construction in the City of Litchfield Park. Reviewed against the 2018 IRC and City of Litchfield Park amendments (effective January 1, 2020). Applications are submitted at the Building Safety office, 214 W. Wigwam Blvd., using the City's Building Permit Application.
Residential Addition / Remodel Permit
Required for room additions and remodels to existing single-family dwellings in Litchfield Park, including conversions of existing under-roof space (e.g., patio enclosures, carport-to-garage conversions) to livable area. Reviewed against the 2018 IRC as adopted and amended by the City.
Electrical Permit
Required for electrical installation, alteration, or repair work in Litchfield Park, governed by the 2017 National Electrical Code (NEC) as adopted and amended by the City. Simple electrical permits such as panel replacement may be issued over the counter.
Plumbing Permit
Required for plumbing installation, alteration, or repair work in Litchfield Park, governed by the 2018 International Plumbing Code (IPC) as adopted and amended by the City. Water heater replacement is a common simple permit.
Mechanical / HVAC Permit
Required for heating, ventilation, and air conditioning installation or replacement in Litchfield Park, governed by the 2018 International Mechanical Code (IMC) as adopted and amended by the City. Current codes require a minimum SEER rating of 18 for new units.
Re-Roofing Permit
Required for residential and commercial re-roofing in Litchfield Park when not covered by the City's limited permit exemption for like-for-like, non-fire-rated-required roofing material replacement. Governed by the 2018 IRC/IBC roofing provisions.
Residential Solar Photovoltaic (PV) / Solar Water Heater Permit
Required for installation of rooftop residential solar photovoltaic (PV) systems, solar water heating panels, or solar space-heating/pool-heating panels in Litchfield Park. All solar systems require both a building permit and Design Review Board (DRB) approval, since roof-mounted panels alter the building's exterior appearance.
Demolition Permit
Required for demolition of any residential, commercial, or accessory structure in Litchfield Park.
Swimming Pool / Spa Permit
Required for installation of an in-ground swimming pool, spa, or above-ground spa in Litchfield Park. Governed by the City's Pools, Spas & Barriers guideline and A.R.S. § 36-1681 barrier requirements. Pools 18 inches deep or less do not require a permit.
Patio Cover / Ramada / Gazebo Permit
Required for patios, decks, ramadas, gazebos, and shade structures in Litchfield Park. Metal/alumawood patios, fabric shade structures, and wood conventional-construction patios are each billed at different valuation rates per square foot.
Fencing Permit
Required for fences, masonry/retaining walls, and wrought iron fencing in Litchfield Park. The City's 2018 code amendment reduced the general no-permit fence-height threshold to 3 feet (lower than the unamended IBC/IRC standard).
EV Charger / Electric Vehicle Charging Station Permit
The City of Litchfield Park's Building Safety fee schedule has no dedicated EV-charger, EVSE, or electric-vehicle-charging line item -- unlike Photovoltaic Systems, which get their own fee table. Installing a Level 2 (240V) home EV charger requires a City of Litchfield Park Electrical Permit reviewed against the adopted 2017 NEC. If the installation requires a panel repair, replacement, or upsizing, it is billed under the schedule's 'Electrical -- Repair/Replace/Add Panel' fee tiers; a simple new circuit added to an existing panel with no other listed electrical work would fall under the schedule's residual 'All Other Projects Not Listed Above' (Based on Valuation) category -- Building Safety should be asked to confirm which line applies to a specific installation.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- 0units
0 buildings · $0 valuation
- Trailing 12 months
- 0units
12 of 12 months reported · #77 in Arizona coverage by units
- Year to date (2026 YTD through 2026-05)
- 0units
0 buildings · $0 valuation
5 month(s) reported to Census
- Full year 2025
- 0units
0 buildings · $0 valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity
Tips & gotchas
- Arizona has no statewide mandatory building code — the City of Litchfield Park independently adopts and amends its own construction codes and runs its own Building Safety Department; it does not defer to Maricopa County for permitting within city limits.
- The City of Litchfield Park's current adopted code suite is the FULL 2018 ICC cycle (IBC, IRC, IMC, IPC, IFGC, IEBC, IPMC, IFC) plus the 2017 NEC and 2010 ADA Standards, effective January 1, 2020 — verified live as of July 2026 with no newer code-cycle adoption found on the City's site, municipal code, or via web search for 2021/2024 updates. This is one to two ICC cycles behind some neighboring Valley cities (e.g., Buckeye's 2024 cycle) — always re-verify before assuming code parity across Mountain West jurisdictions.
- IBC Section 108.4 (the model code's own fee section) is deleted in its entirety by City amendment; permit fees are instead set entirely by City Council via the Citywide Fee Schedule (Section 3, Building Safety), most recently effective August 1, 2025 (FY2026 schedule).
- Litchfield Park's fence permit-exemption threshold (3 feet, per the City's IBC 105.2 amendment) is markedly stricter than some neighboring Buckeye-area cities (7 feet) — do not assume consistency across the Valley on this point.
- Climatic/geographic design criteria: 90 mph wind (Exposure B), Seismic Design Category B, 34°F winter design temperature, moderate-to-heavy termite potential, 12-inch frost depth, no ground snow load (N/A).
- Any roof-mounted solar PV or solar water-heating installation requires Design Review Board (DRB) approval BEFORE a building permit application can even be accepted, since it alters the building's exterior appearance — this is a hard sequential prerequisite, not a parallel review track, and the DRB meets only monthly.
- The Citywide Fee Schedule's Photovoltaic Systems section contains what appear to be two potentially overlapping/duplicate fee line items (a $100 vs. $50 'Solar Water Heater' fee, and a $100 'ESS' vs. $150 'Battery Storage System' fee) in the same published PDF — this looks like a table-formatting artifact in the City's own document rather than an extraction error on our part; applicants should confirm the correct line item for their specific project with Building Safety (623-935-1066) rather than assume either published figure controls.
- Only one dedicated set of officially published review-timeline figures exists for Litchfield Park: the City's Building Permit Questions and Answers page publishes a direct table by category (commercial tenant improvement 5-10 days; new commercial shells 15-20 days; commercial remodels/additions and electrical/mechanical/plumbing 5-10 days; new residential buildings 5-10 days; residential remodels/additions 5-10 days; residential electrical/mechanical/plumbing and new accessory structures 2-10 days) — unlike Buckeye, no separate A.R.S. § 9-835-titled standalone PDF guideline was found published by Litchfield Park; the Q&A page itself appears to serve that statutory-disclosure function.
- Demolition permits have clear flat fees ($25 accessory / $150 residential / $200 commercial) but NO published category-specific review timeline was found anywhere on the City's site, fee schedule, or code-adoption ordinance — flagged with reviewTimelineVerified: false rather than inferring a number from the flat-fee simplicity of the permit.
- Homeowners may act as their own 'contractor,' but if the value of work performed by a hired party exceeds $1,000, an Arizona Registrar of Contractors (ROC) license is legally required (roc.az.gov) — otherwise both parties risk exposure under A.R.S. §32-1151/§32-1154 (a Class 1 Misdemeanor, fine up to $2,500 and/or one year in county jail), per the City's own Building Permit Application form language.