Residential Addition / Remodel Permit in Litchfield Park, Arizona

Required for room additions and remodels to existing single-family dwellings in Litchfield Park, including conversions of existing under-roof space (e.g., patio enclosures, carport-to-garage conversions) to livable area. Reviewed against the 2018 IRC as adopted and amended by the City.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for residential additions and remodels affecting structural or life-safety elements
  • Conversion of existing under-roof space (enclosures) to livable residential area, with no changes to the structure, is billed at 50% of the Valuation Chart for R-3 occupancies based on the new livable area
  • Carport/garage conversions and patio enclosures require Design Review Board (DRB) approval before a building permit application can be accepted, since they alter the building's exterior appearance
  • Conversions to livable space must provide an emergency egress window at least 8% of the new room's square footage (half of that area operable), air conditioning in the new space, and fire-rated separation from an attached garage where applicable
  • Plans must comply with City of Litchfield Park Design Criteria (90 mph wind, Exposure B; Seismic Design Category B)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential AdditionCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety
BOV (Based on Valuation)
Residential RemodelCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3
BOV (Based on Valuation)
Conversion of Existing Space to Livable (Residential only, enclosures under existing roof, no structural changes)City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
50% of Valuation Chart for R-3, based on new livable area
Unfinished BasementCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3
BOV (Based on Valuation)

Review timeline

Plan reviewLitchfield Park’s published plan-review target
5–10 business days

How long did your Residential Addition / Remodel Permit permit actually take in Litchfield Park?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Required before concrete pour for additions

  2. 2

    Framing

    Structural connections to existing structure; fire separation for garage conversions

  3. 3

    Final

    Completed work verified against approved plans

See the full Litchfield Park inspection guide — scheduling & re-inspection fees →

Tips

  • Per the City's Building Permit Questions and Answers page, residential remodels and additions carry a published review timeframe of 5-10 business days.
  • A carport/garage conversion or patio enclosure must clear Design Review Board approval BEFORE the building permit application can even be accepted — budget extra time for the monthly DRB meeting cycle on top of the 5-10 business day plan review.
  • Converting existing under-roof space to livable area (no structural changes) is billed at only 50% of the standard R-3 valuation chart, based on the new livable square footage — cheaper than a full new-construction addition fee.

Frequently asked questions

Yes, if the addition alters the exterior appearance of the building. Per the City's guideline brochures, the Design Review Board (which meets monthly) must approve exterior changes before a building permit application can be accepted.

In Litchfield Park, the published Residential Addition is: BOV (Based on Valuation). Additional published fees: Residential Remodel — BOV (Based on Valuation); Conversion of Existing Space to Livable (Residential only, enclosures under existing roof, no structural changes) — 50% of Valuation Chart for R-3, based on new livable area; Unfinished Basement — BOV (Based on Valuation). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Litchfield Park's published plan-review target for a residential addition / remodel permit is 5–10 business days.

You'll need: Building Permit Application; Residential Drawing Submittal Package; Site/Plot Plan. Depending on your project, Litchfield Park may also ask for: Design Review Board Approval. See the required-documents checklist on this page for details on each.

Litchfield Park requires 3 inspection(s) for a residential addition / remodel permit, in order: Foundation/Footing, Framing, Final. Schedule each through City of Litchfield Park Building Safety Department (623-935-1066).

Apply through City of Litchfield Park Building Safety Department at 214 W. Wigwam Boulevard, Litchfield Park, AZ 85340. Phone: 623-935-1066, email: building@litchfieldpark.gov. Office hours: Monday - Friday, 7:00 a.m. to 4:00 p.m. Fax: 623-935-5427. Chief Building Official: Brian Bertucci (623-889-6222, bbertucci@litchfieldpark.gov). Building Safety & Public Works Administrative Assistant: Stacey Frederico (sfrederico@litchfieldpark.gov). Applications submitted at City Hall or online via the City's building permit application system; inspections can also be scheduled by emailing Building Safety.. Official information: https://www.litchfieldpark.gov/57/Building-Safety.

Litchfield Park, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Litchfield Park runs its own Building Safety Department, independently adopts and administers its own construction codes, and does not defer permitting to Maricopa County. Source: City of Litchfield Park Building Safety page (litchfieldpark.gov/57/Building-Safety).; 2018 International Building Code (IBC), as adopted by the Mayor and Council of the City of Litchfield Park, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes (effective January 1, 2020) and the City's Building Safety page, which lists this as a 'Current Adopted Code' (verified live as of July 2026, with no newer edition adoption found on the City's site, municipal code, or in web searches for 2021/2024 code-cycle updates).; 2018 International Residential Code (IRC), adopted by reference, with City of Litchfield Park amendments (including an amended Table R301.2(1) Climatic and Geographic Design Criteria and amended Table R301.5 Live Loads), effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2018 International Mechanical Code (IMC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.; 2018 International Plumbing Code (IPC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference (Section 101.4.9 of the amended IBC, applying to all buildings except one- and two-family dwellings which fall under the IRC electrical provisions), with City amendments. Note: the electrical code cycle is one edition behind the 2018 ICC set, consistent with typical AZ practice. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.; 2018 International Fuel Gas Code (IFGC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2018 International Existing Building Code (IEBC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2018 International Energy Conservation Code (IECC), adopted by reference, with City amendments, effective January 1, 2020. Energy codes have applied to new construction since 2009 per the City's Residential Energy Improvements guideline brochure (Brochure #8, July 2017), requiring energy-efficient windows/doors, higher insulation levels, and energy-efficient A/C for homes built after that date. Source: City of Litchfield Park Amendments to 2018 International Codes; 'Guidelines When Building Within the City' Brochure #8 — Residential Energy Improvements.; 2018 International Property Maintenance Code (IPMC), adopted by reference. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2018 International Fire Code (IFC), adopted by reference as the City's uniform fire code, with City amendments; adopted appendices are limited to Appendix B (Fire Flow Requirements), Appendix D (Fire Apparatus Access Roads), and Appendix H (Hazardous Materials Management Plan/Hazardous Materials Inventory Statement Instructions) — all other IFC appendices are NOT adopted unless specifically referenced. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2010 ADA Standards for Accessible Design, together with ICC A117.1 Accessibility code, the Arizonans with Disabilities Act (A.R.S. Title 41, Chapter 9, Article 8), and its Implementing Rules (A.A.C. Title 10, Chapter 3, Article 4); in the event of a conflict between codes, the more restrictive standard applies. Source: City of Litchfield Park Amendments to 2018 International Codes (IBC Section 101.4.8 amendment); City of Litchfield Park Building Safety page.; Permit expiration/abandonment rule (amended Section 106.4.3 of the Building Code and Section 105.3.1 of the Fire Code): an application for a permit for any proposed work is deemed abandoned 180 days after the date of filing unless pursued in good faith or a permit has been issued; the Building Official may grant one extension of up to 180 days upon written request showing justifiable cause, provided no changes have been made to the original construction documents and the suspension/abandonment has not exceeded one year. Source: City of Litchfield Park Amendments to 2018 International Codes.. Local amendments apply — see the Litchfield Park overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Litchfield Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.