Patio Cover / Ramada / Gazebo Permit in Litchfield Park, Arizona

Required for patios, decks, ramadas, gazebos, and shade structures in Litchfield Park. Metal/alumawood patios, fabric shade structures, and wood conventional-construction patios are each billed at different valuation rates per square foot.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for patio covers, ramadas, gazebos, and shade structures affixed to or independent of the residence
  • Design Review Board approval may be required if the structure is visible from the street or alters the property's exterior appearance
  • Structures under 120 sq ft that are one-story and detached may be exempt (see general accessory-structure exemption), but attached patio covers and any structure affecting egress or setbacks require review

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Patio/Deck/Ramada/Gazebo — Metal/'alumawood' patio, lattice, or awningCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety
BOV of $15 per sq. ft.
Patio/Deck/Ramada/Gazebo — Shade Structure, fabric free-standingCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3
BOV of $7 per sq. ft.
Patio/Deck/Ramada/Gazebo — Wood (conventional construction)City of Litchfield Park Citywide Fee Schedule FY2026, Section 3
BOV of $15 per sq. ft.
Residential Patio Enclosure — Glass or ScreenCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3
BOV of $15 per sq. ft.
Standard Plan Review — Alum. Patio or AwningCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Plan Review
$75

Review timeline

Plan reviewLitchfield Park’s published plan-review target
5–10 business days

How long did your Patio Cover / Ramada / Gazebo Permit permit actually take in Litchfield Park?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing

    Required for post footings before concrete pour

  2. 2

    Final

    Structure completed per approved plans

See the full Litchfield Park inspection guide — scheduling & re-inspection fees →

Tips

  • Classified under the City's published 'residential remodels and additions' review-timeframe category (5-10 business days), since patio covers/ramadas are not separately broken out on the public timeline table.
  • Fee basis differs meaningfully by material: fabric shade structures ($7/sq ft) are much cheaper than metal/alumawood or wood conventional-construction patios ($15/sq ft) — confirm the correct fee category with Building Safety before budgeting.
  • A patio enclosure (converting an open patio to an enclosed, glass/screen room) is billed the same $15/sq ft BOV rate as a wood conventional patio cover, but see the Residential Addition/Remodel permit type for enclosures being converted further to livable, air-conditioned space.

Frequently asked questions

Litchfield Park requires a patio cover / ramada / gazebo permit for: Building permit required for patio covers, ramadas, gazebos, and shade structures affixed to or independent of the residence; Design Review Board approval may be required if the structure is visible from the street or alters the property's exterior appearance; Structures under 120 sq ft that are one-story and detached may be exempt (see general accessory-structure exemption), but attached patio covers and any structure affecting egress or setbacks require review. If your project isn't listed, confirm with City of Litchfield Park Building Safety Department at 623-935-1066 before starting work.

Fees are Based on Valuation (BOV) by material: $15 per sq ft for metal/alumawood patios or wood conventional construction, or $7 per sq ft for a free-standing fabric shade structure, per the City of Litchfield Park Citywide Fee Schedule FY2026 (effective 8/1/2025), plus a $75 standard plan review fee for aluminum patios/awnings.

Litchfield Park's published plan-review target for a patio cover / ramada / gazebo permit is 5–10 business days.

You'll need: Building Permit Application; Site Plan. See the required-documents checklist on this page for details on each.

Litchfield Park requires 2 inspection(s) for a patio cover / ramada / gazebo permit, in order: Footing, Final. Schedule each through City of Litchfield Park Building Safety Department (623-935-1066).

Apply through City of Litchfield Park Building Safety Department at 214 W. Wigwam Boulevard, Litchfield Park, AZ 85340. Phone: 623-935-1066, email: building@litchfieldpark.gov. Office hours: Monday - Friday, 7:00 a.m. to 4:00 p.m. Fax: 623-935-5427. Chief Building Official: Brian Bertucci (623-889-6222, bbertucci@litchfieldpark.gov). Building Safety & Public Works Administrative Assistant: Stacey Frederico (sfrederico@litchfieldpark.gov). Applications submitted at City Hall or online via the City's building permit application system; inspections can also be scheduled by emailing Building Safety.. Official information: https://www.litchfieldpark.gov/57/Building-Safety.

Litchfield Park, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Litchfield Park runs its own Building Safety Department, independently adopts and administers its own construction codes, and does not defer permitting to Maricopa County. Source: City of Litchfield Park Building Safety page (litchfieldpark.gov/57/Building-Safety).; 2018 International Building Code (IBC), as adopted by the Mayor and Council of the City of Litchfield Park, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes (effective January 1, 2020) and the City's Building Safety page, which lists this as a 'Current Adopted Code' (verified live as of July 2026, with no newer edition adoption found on the City's site, municipal code, or in web searches for 2021/2024 code-cycle updates).; 2018 International Residential Code (IRC), adopted by reference, with City of Litchfield Park amendments (including an amended Table R301.2(1) Climatic and Geographic Design Criteria and amended Table R301.5 Live Loads), effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2018 International Mechanical Code (IMC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.; 2018 International Plumbing Code (IPC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference (Section 101.4.9 of the amended IBC, applying to all buildings except one- and two-family dwellings which fall under the IRC electrical provisions), with City amendments. Note: the electrical code cycle is one edition behind the 2018 ICC set, consistent with typical AZ practice. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.; 2018 International Fuel Gas Code (IFGC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2018 International Existing Building Code (IEBC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2018 International Energy Conservation Code (IECC), adopted by reference, with City amendments, effective January 1, 2020. Energy codes have applied to new construction since 2009 per the City's Residential Energy Improvements guideline brochure (Brochure #8, July 2017), requiring energy-efficient windows/doors, higher insulation levels, and energy-efficient A/C for homes built after that date. Source: City of Litchfield Park Amendments to 2018 International Codes; 'Guidelines When Building Within the City' Brochure #8 — Residential Energy Improvements.; 2018 International Property Maintenance Code (IPMC), adopted by reference. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2018 International Fire Code (IFC), adopted by reference as the City's uniform fire code, with City amendments; adopted appendices are limited to Appendix B (Fire Flow Requirements), Appendix D (Fire Apparatus Access Roads), and Appendix H (Hazardous Materials Management Plan/Hazardous Materials Inventory Statement Instructions) — all other IFC appendices are NOT adopted unless specifically referenced. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2010 ADA Standards for Accessible Design, together with ICC A117.1 Accessibility code, the Arizonans with Disabilities Act (A.R.S. Title 41, Chapter 9, Article 8), and its Implementing Rules (A.A.C. Title 10, Chapter 3, Article 4); in the event of a conflict between codes, the more restrictive standard applies. Source: City of Litchfield Park Amendments to 2018 International Codes (IBC Section 101.4.8 amendment); City of Litchfield Park Building Safety page.; Permit expiration/abandonment rule (amended Section 106.4.3 of the Building Code and Section 105.3.1 of the Fire Code): an application for a permit for any proposed work is deemed abandoned 180 days after the date of filing unless pursued in good faith or a permit has been issued; the Building Official may grant one extension of up to 180 days upon written request showing justifiable cause, provided no changes have been made to the original construction documents and the suspension/abandonment has not exceeded one year. Source: City of Litchfield Park Amendments to 2018 International Codes.. Local amendments apply — see the Litchfield Park overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Litchfield Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.