Residential Solar Photovoltaic (PV) / Solar Water Heater Permit in Litchfield Park, Arizona

Required for installation of rooftop residential solar photovoltaic (PV) systems, solar water heating panels, or solar space-heating/pool-heating panels in Litchfield Park. All solar systems require both a building permit and Design Review Board (DRB) approval, since roof-mounted panels alter the building's exterior appearance.

Verified 2026-07-06 · Source

When you need this permit

  • Photovoltaic (PV) solar systems converting sunlight to electricity, solar panels used for water heating, and solar panels used for space heating/cooling or pool heating all require a permit and inspections
  • The addition of roof-mounted solar panels alters the appearance of a building's exterior; the project must be reviewed and approved by the City's Design Review Board (DRB) BEFORE a building permit application can be made
  • The City's building permit fee for solar system projects is a flat fee covering plan review, inspection, and related administrative services
  • Battery/Energy Storage System (ESS) installations are billed and permitted separately from the PV system itself

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Solar PV System — Residential, <9,601 kW (i.e., standard-size residential systems, per the Fee Schedule's stated threshold)City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety, Photovoltaic Systems
$200
Solar PV System — Residential, >9,601 kWCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3
$300
Solar PV System — CommercialCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3
BOV (Based on Valuation)
Solar Water HeaterCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3; two distinct 'Solar Water Heater' fee lines ($100 and $50) appear in different parts of the published schedule table
$100 (permit) — a separate $50 Solar Water Heater line also appears in the Fee Schedule's Roof Replacement section; the City should be asked to clarify which applies to a given project
ESS — Energy Storage System (battery), per systemCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3; the schedule lists both an ESS line ($100/system) and a Battery Storage System line ($150) — verify which applies with Building Safety for a specific project
$100 per system (also separately listed as $150 for 'Battery Storage System')
Standard Plan Review — Solar PV or Water HeaterCity of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Plan Review
$100

Review timeline

Plan reviewLitchfield Park’s published plan-review target
5–10 business days

How long did your Residential Solar Photovoltaic (PV) / Solar Water Heater Permit permit actually take in Litchfield Park?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, and electrical interconnection verified

See the full Litchfield Park inspection guide — scheduling & re-inspection fees →

Tips

  • Solar is not separately broken out on the City's public review-timeframe table; because it requires plan review and building-permit processing similar to a residential remodel/addition, and because Design Review Board approval is a mandatory prerequisite, this entry uses the City's published 5-10 business day 'residential remodels and additions' range for the building-permit review step — this does NOT include the separate DRB approval cycle (DRB meets monthly), which must be completed BEFORE the building permit application is even accepted.
  • The Citywide Fee Schedule's Photovoltaic Systems section contains what appear to be two potentially overlapping fee lines for Solar Water Heater ($100 in the Photovoltaic section context vs. $50 listed under Roof Replacement) and for battery storage (ESS at $100/system vs. Battery Storage System at $150) — call Building Safety (623-935-1066) to confirm which line item applies to your specific project scope before budgeting.
  • Always confirm your solar installer/contractor has scheduled Design Review Board submittal early — DRB approval is a hard prerequisite to the building permit application, not a parallel process.

Frequently asked questions

Yes. Per the City's Residential Energy Improvements guideline, roof-mounted solar panels alter a building's exterior appearance, so the project must be reviewed and approved by the Design Review Board before a building permit application can even be made.

The City's solar permit fee is a flat fee: $200 for residential PV systems under the Fee Schedule's stated 9,601 kW threshold, or $300 above that threshold, per the Citywide Fee Schedule FY2026 (effective 8/1/2025), plus a $100 standard plan review fee.

Litchfield Park's published plan-review target for a residential solar photovoltaic (pv) / solar water heater permit is 5–10 business days.

You'll need: Building Permit Application; Design Review Board Submittal; Site Plan and Roof Layout. See the required-documents checklist on this page for details on each.

Litchfield Park requires 2 inspection(s) for a residential solar photovoltaic (pv) / solar water heater permit, in order: Rough Electrical, Final. Schedule each through City of Litchfield Park Building Safety Department (623-935-1066).

Apply through City of Litchfield Park Building Safety Department at 214 W. Wigwam Boulevard, Litchfield Park, AZ 85340. Phone: 623-935-1066, email: building@litchfieldpark.gov. Office hours: Monday - Friday, 7:00 a.m. to 4:00 p.m. Fax: 623-935-5427. Chief Building Official: Brian Bertucci (623-889-6222, bbertucci@litchfieldpark.gov). Building Safety & Public Works Administrative Assistant: Stacey Frederico (sfrederico@litchfieldpark.gov). Applications submitted at City Hall or online via the City's building permit application system; inspections can also be scheduled by emailing Building Safety.. Official information: https://www.litchfieldpark.gov/57/Building-Safety.

Litchfield Park, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Litchfield Park runs its own Building Safety Department, independently adopts and administers its own construction codes, and does not defer permitting to Maricopa County. Source: City of Litchfield Park Building Safety page (litchfieldpark.gov/57/Building-Safety).; 2018 International Building Code (IBC), as adopted by the Mayor and Council of the City of Litchfield Park, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes (effective January 1, 2020) and the City's Building Safety page, which lists this as a 'Current Adopted Code' (verified live as of July 2026, with no newer edition adoption found on the City's site, municipal code, or in web searches for 2021/2024 code-cycle updates).; 2018 International Residential Code (IRC), adopted by reference, with City of Litchfield Park amendments (including an amended Table R301.2(1) Climatic and Geographic Design Criteria and amended Table R301.5 Live Loads), effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2018 International Mechanical Code (IMC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.; 2018 International Plumbing Code (IPC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference (Section 101.4.9 of the amended IBC, applying to all buildings except one- and two-family dwellings which fall under the IRC electrical provisions), with City amendments. Note: the electrical code cycle is one edition behind the 2018 ICC set, consistent with typical AZ practice. Source: City of Litchfield Park Amendments to 2018 International Codes; City of Litchfield Park Building Safety page.; 2018 International Fuel Gas Code (IFGC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2018 International Existing Building Code (IEBC), adopted by reference, with City amendments, effective January 1, 2020. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2018 International Energy Conservation Code (IECC), adopted by reference, with City amendments, effective January 1, 2020. Energy codes have applied to new construction since 2009 per the City's Residential Energy Improvements guideline brochure (Brochure #8, July 2017), requiring energy-efficient windows/doors, higher insulation levels, and energy-efficient A/C for homes built after that date. Source: City of Litchfield Park Amendments to 2018 International Codes; 'Guidelines When Building Within the City' Brochure #8 — Residential Energy Improvements.; 2018 International Property Maintenance Code (IPMC), adopted by reference. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2018 International Fire Code (IFC), adopted by reference as the City's uniform fire code, with City amendments; adopted appendices are limited to Appendix B (Fire Flow Requirements), Appendix D (Fire Apparatus Access Roads), and Appendix H (Hazardous Materials Management Plan/Hazardous Materials Inventory Statement Instructions) — all other IFC appendices are NOT adopted unless specifically referenced. Source: City of Litchfield Park Amendments to 2018 International Codes.; 2010 ADA Standards for Accessible Design, together with ICC A117.1 Accessibility code, the Arizonans with Disabilities Act (A.R.S. Title 41, Chapter 9, Article 8), and its Implementing Rules (A.A.C. Title 10, Chapter 3, Article 4); in the event of a conflict between codes, the more restrictive standard applies. Source: City of Litchfield Park Amendments to 2018 International Codes (IBC Section 101.4.8 amendment); City of Litchfield Park Building Safety page.; Permit expiration/abandonment rule (amended Section 106.4.3 of the Building Code and Section 105.3.1 of the Fire Code): an application for a permit for any proposed work is deemed abandoned 180 days after the date of filing unless pursued in good faith or a permit has been issued; the Building Official may grant one extension of up to 180 days upon written request showing justifiable cause, provided no changes have been made to the original construction documents and the suspension/abandonment has not exceeded one year. Source: City of Litchfield Park Amendments to 2018 International Codes.. Local amendments apply — see the Litchfield Park overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Litchfield Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.