Litchfield Park building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Litchfield Park, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
214 W. Wigwam Boulevard, Litchfield Park, AZ 85340
Phone
623-935-1066
Office hours
Monday - Friday, 7:00 a.m. to 4:00 p.m. Fax: 623-935-5427. Chief Building Official: Brian Bertucci (623-889-6222, bbertucci@litchfieldpark.gov). Building Safety & Public Works Administrative Assistant: Stacey Frederico (sfrederico@litchfieldpark.gov). Applications submitted at City Hall or online via the City's building permit application system; inspections can also be scheduled by emailing Building Safety.

Inspection sequence

Applies to: Plumbing Permit

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks; residential inspection fee $50

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions

  2. 2

    Framing

    Structural connections to existing structure; fire separation for garage conversions

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing, connections, egress, per 2018 IRC and City design criteria

  3. 3

    Final / Certificate of Occupancy

    All work complete per approved plans; Certificate of Occupancy issued per building ($100 fee)

Applies to: Swimming Pool / Spa Permit

  1. 1

    Pre-Gunite

    Before shotcrete/gunite application on in-ground pool shell

  2. 2

    Pre-Plaster

    Before interior plaster finish application

  3. 3

    Final / Barrier Compliance

    Barrier height, gate self-closing/self-latching hardware, and anti-entrapment suction covers verified; above-ground pools/manufactured spas require only this single inspection

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed (commercial/new construction)

  2. 2

    Final / Meter Clearance

    Devices installed and panel verified per 2017 NEC; residential inspection fee is $50, commercial is 15% of permit fee each

Applies to: Fencing Permit

  1. 1

    Footing

    Required for masonry/retaining wall footings before backfill

  2. 2

    Final

    Completed fence/wall verified against approved plans

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified; residential inspection fee $50

Applies to: Patio Cover / Ramada / Gazebo Permit

  1. 1

    Footing

    Required for post footings before concrete pour

  2. 2

    Final

    Structure completed per approved plans

Applies to: Residential Solar Photovoltaic (PV) / Solar Water Heater Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, and electrical interconnection verified

Litchfield Park building permits

Get alerts for Litchfield Park

We'll email you when Litchfield Park's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.