You are viewing the permanent link for the record currently in effect, published 2026-07-07.
Litchfield Park building permits
VerifiedLitchfield Park, Arizona — as published 2026-07-07.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family dwelling construction in the City of Litchfield Park. Reviewed against the 2018 IRC and City of Litchfield Park amendments (effective January 1, 2020). Applications are submitted at the Building Safety office, 214 W. Wigwam Blvd., using the City's Building Permit Application.
Verified 2026-07-06 · Source
Requirements
- Building permit required for new single-family dwelling construction within Litchfield Park city limits
- Plans must comply with the 2018 IRC and City amendments, including the amended Climatic and Geographic Design Criteria (90 mph wind, Exposure B; Seismic Design Category B; 34°F winter design temperature; moderate-to-heavy termite potential; 12-inch frost depth)
- City Code requires each residence to provide covered parking for two vehicles
- Construction documents must be submitted per the City's Residential Drawing Submittal Package requirements
- Application submitted in person at the Building Safety office (214 W. Wigwam Blvd.) using the Building Permit Application form, selecting 'Residential' as the project type
- Building permit fee is Based on Valuation (BOV), using the current Building Valuation Data jointly published by Building Safety Journal and the International Code Council
Required documents
- RequiredBuilding Permit ApplicationCity of Litchfield Park Building Permit Application, submitted at the Building Safety office or by email to building@litchfieldpark.gov; requires project, applicant, property owner, and contractor information plus project valuation and square footage
- RequiredResidential Drawing Submittal PackageCity of Litchfield Park's required construction document package for residential submittals
- RequiredSite/Plot PlanLot dimensions, easements, setbacks, and structure locations
- RequiredConstruction DocumentsPer the City's 'Construction Documents' guideline (Brochure #3)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — New Residential Construction | BOV (Based on Valuation) | City of Litchfield Park Citywide Fee Schedule FY2026 (effective 8/1/2025), Section 3 Building Safety; valuation determined using the current Building Valuation Data published by Building Safety Journal and the International Code Council |
| Plan Review | $100 per hour (minimum 1 hour) for changes/revisions to approved plans; standard new-home plan review is BOV-based | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Residential Trusses (deferred submittal) | $175 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Certificate of Occupancy, Residential, per building | $100 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
Residential Addition / Remodel Permit
VerifiedRequired for room additions and remodels to existing single-family dwellings in Litchfield Park, including conversions of existing under-roof space (e.g., patio enclosures, carport-to-garage conversions) to livable area. Reviewed against the 2018 IRC as adopted and amended by the City.
Verified 2026-07-06 · Source
Requirements
- Building permit required for residential additions and remodels affecting structural or life-safety elements
- Conversion of existing under-roof space (enclosures) to livable residential area, with no changes to the structure, is billed at 50% of the Valuation Chart for R-3 occupancies based on the new livable area
- Carport/garage conversions and patio enclosures require Design Review Board (DRB) approval before a building permit application can be accepted, since they alter the building's exterior appearance
- Conversions to livable space must provide an emergency egress window at least 8% of the new room's square footage (half of that area operable), air conditioning in the new space, and fire-rated separation from an attached garage where applicable
- Plans must comply with City of Litchfield Park Design Criteria (90 mph wind, Exposure B; Seismic Design Category B)
Required documents
- RequiredBuilding Permit ApplicationSubmitted at the Building Safety office, selecting 'Residential' as project type
- RequiredResidential Drawing Submittal PackageCity of Litchfield Park submittal package for additions/remodels
- RequiredSite/Plot PlanShowing existing structure, addition footprint, and setbacks
- OptionalDesign Review Board ApprovalRequired prior to permit application for any project altering the building's exterior appearance (additions, carport conversions, patio enclosures)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Addition | BOV (Based on Valuation) | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety |
| Residential Remodel | BOV (Based on Valuation) | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Conversion of Existing Space to Livable (Residential only, enclosures under existing roof, no structural changes) | 50% of Valuation Chart for R-3, based on new livable area | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Unfinished Basement | BOV (Based on Valuation) | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in Litchfield Park, governed by the 2017 National Electrical Code (NEC) as adopted and amended by the City. Simple electrical permits such as panel replacement may be issued over the counter.
Verified 2026-07-06 · Source
Requirements
- Electrical permit required for meter clearances, panel work, service entrance changes, temporary power, and other hard-wired electrical work
- Governed by the 2017 NEC as adopted by the City of Litchfield Park (applies to all buildings except one- and two-family dwellings, which fall under the IRC electrical provisions)
- Minor electrical repairs (lamp/fixture replacement, outlet/switch style changes, connecting approved portable equipment to existing approved receptacles) do NOT require a permit
- Simple permits, such as replacement of an electrical panel, can be issued over the counter without plan review
- Application submitted at the Building Safety office using the Building Permit Application
Required documents
- RequiredBuilding/Electrical Permit ApplicationSubmitted at the Building Safety office
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Meter Clearance without repair | $35 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety |
| Electrical — Commercial (new construction) | 15% of Permit Fee | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Repair/Replace/Add Panel, 400 amps or less | $100 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Repair/Replace/Add Panel, 401-999 amps | $150 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Repair/Replace/Add Panel, over 1,000 amps | $250 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Temporary Power | $100 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| De-rate | $75 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Electrical, Hotel/Motel/Inn (new or repair), per unit | $50 per unit | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in Litchfield Park, governed by the 2018 International Plumbing Code (IPC) as adopted and amended by the City. Water heater replacement is a common simple permit.
Verified 2026-07-06 · Source
Requirements
- Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping
- Governed by the 2018 IPC as adopted by the City of Litchfield Park
- State and federal law require low-flow water fixtures for new installations
- Minor plumbing repairs (clearing stoppages, repairing leaks) not involving replacement/rearrangement of valves, pipes, or fixtures do NOT require a permit
- Simple permits such as water heater replacement can be issued over the counter
Required documents
- RequiredBuilding/Plumbing Permit ApplicationSubmitted at the Building Safety office
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Repair — Residential Repipe | $75 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety |
| New Residential Plumbing | $50 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| New Commercial Plumbing | 15% of permit fee | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Water Heater — new/replacement, gas, electric, or tankless | $50 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Gas Line — New | $100 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Gas Line — Repair only | $50 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Gas Test/Clearance Only | $150 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Plumbing, Hotel/Motel/Inn (new or repair), per unit | $50 per unit | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installation or replacement in Litchfield Park, governed by the 2018 International Mechanical Code (IMC) as adopted and amended by the City. Current codes require a minimum SEER rating of 18 for new units.
Verified 2026-07-06 · Source
Requirements
- Mechanical permit required for installation, replacement, or relocation of HVAC equipment and ductwork
- Governed by the 2018 IMC as adopted by the City of Litchfield Park
- Current building codes require a minimum SEER rating of 18 for new HVAC units
- New codes require all ductwork to be insulated; a duct test can reveal leaks in existing systems
- Simple HVAC replacement permits can typically be issued over the counter
Required documents
- RequiredBuilding/Mechanical Permit ApplicationSubmitted at the Building Safety office
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| HVAC — Residential new unit/Replacement | $150 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety |
| HVAC — With new/additional ductwork (add to above fee) | $35 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| HVAC — Commercial unit replacement (each) | $150 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| HVAC — Hotel Repair/Replacement, per unit | $75 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Mechanical — Residential New Construction | $50 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Mechanical — Commercial New Construction | 15% of Permit fee | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Mechanical — Repair/Replacement | $35 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
Re-Roofing Permit
VerifiedRequired for residential and commercial re-roofing in Litchfield Park when not covered by the City's limited permit exemption for like-for-like, non-fire-rated-required roofing material replacement. Governed by the 2018 IRC/IBC roofing provisions.
Verified 2026-07-06 · Source
Requirements
- Building permit required for re-roofing, EXCEPT the exemption: re-roofing using the SAME roofing materials as the existing roof, provided the roof is not required to be fire-resistive
- Roof plan/material listing required showing existing framing, square footage, existing material, sheathing detail, and proposed material for any non-exempt re-roof
- Shingle or tile full replacement is billed as a flat fee; sheathing replacement is a separate line item
Required documents
- RequiredBuilding Permit Application (Re-Roofing)Submitted at the Building Safety office
- RequiredRoof Plan/Material ListingExisting and proposed roofing material, sheathing, and square footage
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Roof Replacement — Shingles or tile, full replacement only | $100 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety |
| Roof Replacement — Sheathing replaced | $50 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Integrated Roof Systems (e.g., roof-integrated solar) | BOV (Based on Valuation) | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, listed under Photovoltaic Systems |
Residential Solar Photovoltaic (PV) / Solar Water Heater Permit
VerifiedRequired for installation of rooftop residential solar photovoltaic (PV) systems, solar water heating panels, or solar space-heating/pool-heating panels in Litchfield Park. All solar systems require both a building permit and Design Review Board (DRB) approval, since roof-mounted panels alter the building's exterior appearance.
Verified 2026-07-06 · Source
Requirements
- Photovoltaic (PV) solar systems converting sunlight to electricity, solar panels used for water heating, and solar panels used for space heating/cooling or pool heating all require a permit and inspections
- The addition of roof-mounted solar panels alters the appearance of a building's exterior; the project must be reviewed and approved by the City's Design Review Board (DRB) BEFORE a building permit application can be made
- The City's building permit fee for solar system projects is a flat fee covering plan review, inspection, and related administrative services
- Battery/Energy Storage System (ESS) installations are billed and permitted separately from the PV system itself
Required documents
- RequiredBuilding Permit ApplicationSubmitted at the Building Safety office, following required Design Review Board approval
- RequiredDesign Review Board SubmittalRequired prior to building permit application for any roof-mounted solar installation, since it alters the building's exterior appearance
- RequiredSite Plan and Roof LayoutPanel placement, racking, and electrical interconnection details
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar PV System — Residential, <9,601 kW (i.e., standard-size residential systems, per the Fee Schedule's stated threshold) | $200 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety, Photovoltaic Systems |
| Solar PV System — Residential, >9,601 kW | $300 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Solar PV System — Commercial | BOV (Based on Valuation) | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Solar Water Heater | $100 (permit) — a separate $50 Solar Water Heater line also appears in the Fee Schedule's Roof Replacement section; the City should be asked to clarify which applies to a given project | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3; two distinct 'Solar Water Heater' fee lines ($100 and $50) appear in different parts of the published schedule table |
| ESS — Energy Storage System (battery), per system | $100 per system (also separately listed as $150 for 'Battery Storage System') | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3; the schedule lists both an ESS line ($100/system) and a Battery Storage System line ($150) — verify which applies with Building Safety for a specific project |
| Standard Plan Review — Solar PV or Water Heater | $100 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Plan Review |
Demolition Permit
VerifiedRequired for demolition of any residential, commercial, or accessory structure in Litchfield Park.
Verified 2026-07-06 · Source
Requirements
- Building permit required before demolishing a residential, commercial, or accessory structure within Litchfield Park city limits
- Site plan required showing lot dimensions and location of the structure to be demolished
- Utilities must be terminated prior to demolition
Required documents
- RequiredBuilding Permit ApplicationSubmitted at the Building Safety office, selecting 'Other' or the appropriate project type for demolition
- RequiredSite PlanShowing the structure(s) to be demolished and remaining site conditions
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition — Accessory Structure | $25 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety |
| Demolition — Residential Building | $150 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Demolition — Commercial Building | $200 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
Swimming Pool / Spa Permit
VerifiedRequired for installation of an in-ground swimming pool, spa, or above-ground spa in Litchfield Park. Governed by the City's Pools, Spas & Barriers guideline and A.R.S. § 36-1681 barrier requirements. Pools 18 inches deep or less do not require a permit.
Verified 2026-07-06 · Source
Requirements
- Building permit required for in-ground swimming pools, in-ground spas, free-standing spas, and semi-public pools; pools under 18 inches deep are exempt
- Site plan required showing pool/spa location, equipment, existing house doors, gates, and fencing
- Barrier must comply with A.R.S. § 36-1681 and City Code: minimum 5-foot non-climbable enclosure with self-closing/self-latching gates (latch hardware at least 54 inches above ground), OR self-closing/self-latching door hardware where the residence forms part of the barrier
- New/replacement suction covers must be anti-entrapment compliant (curved, not flat) with two suction inlets, per the federal Virginia Graeme-Baker Act
- Two inspections required during new in-ground pool construction (pre-gunite and pre-plaster); only one inspection required for an above-ground pool or manufactured spa
- A.R.S. § 36-1681(E): anyone selling, renting, or leasing a property with a pool/spa must give the buyer/renter a pool safety notice as required by the Arizona Department of Health Services
Required documents
- RequiredBuilding Permit ApplicationSubmitted at the Building Safety office, selecting 'Pool/Spa' as project type
- RequiredSite PlanPool/spa location, equipment, existing house doors, gates, and fencing/barrier layout
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| In-ground Swimming Pool | $500 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety, Pools and Spas |
| Spa (in-ground), add for lone unit or in combination with pool | $50 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Spa (free-standing), includes electrical | $100 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Semi-public pool | $750 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Standard Plan Review — Pools | $50 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Plan Review |
| Residential Site Plans (standard SFD and Pool submittals) — revisions | $50 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Plan Review |
Patio Cover / Ramada / Gazebo Permit
VerifiedRequired for patios, decks, ramadas, gazebos, and shade structures in Litchfield Park. Metal/alumawood patios, fabric shade structures, and wood conventional-construction patios are each billed at different valuation rates per square foot.
Verified 2026-07-06 · Source
Requirements
- Building permit required for patio covers, ramadas, gazebos, and shade structures affixed to or independent of the residence
- Design Review Board approval may be required if the structure is visible from the street or alters the property's exterior appearance
- Structures under 120 sq ft that are one-story and detached may be exempt (see general accessory-structure exemption), but attached patio covers and any structure affecting egress or setbacks require review
Required documents
- RequiredBuilding Permit ApplicationSubmitted at the Building Safety office, selecting 'Patio/Ramada' as project type
- RequiredSite PlanStructure location, dimensions, and setback verification
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Patio/Deck/Ramada/Gazebo — Metal/'alumawood' patio, lattice, or awning | BOV of $15 per sq. ft. | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety |
| Patio/Deck/Ramada/Gazebo — Shade Structure, fabric free-standing | BOV of $7 per sq. ft. | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Patio/Deck/Ramada/Gazebo — Wood (conventional construction) | BOV of $15 per sq. ft. | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Residential Patio Enclosure — Glass or Screen | BOV of $15 per sq. ft. | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Standard Plan Review — Alum. Patio or Awning | $75 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Plan Review |
Fencing Permit
VerifiedRequired for fences, masonry/retaining walls, and wrought iron fencing in Litchfield Park. The City's 2018 code amendment reduced the general no-permit fence-height threshold to 3 feet (lower than the unamended IBC/IRC standard).
Verified 2026-07-06 · Source
Requirements
- Fences not over 3 feet high do not require a building permit, per the City's amendment to IBC Section 105.2 (Building Item 2)
- Fences over 3 feet, masonry/retaining walls, and wrought iron fencing require a permit
- Pool barrier fences must independently comply with A.R.S. § 36-1681 and City pool barrier standards regardless of the general fence permit threshold
- Fee is based on linear footage of fence/wall
Required documents
- RequiredBuilding Permit ApplicationSubmitted at the Building Safety office
- RequiredSite PlanFence/wall location and linear footage
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fencing — Add to existing height | BOV of $2 per linear ft. | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3, Building Safety |
| Fencing — Masonry or retaining | BOV of $5 per linear ft. | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Fencing — Wrought Iron | BOV of $2 per linear ft. | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
EV Charger / Electric Vehicle Charging Station Permit
VerifiedThe City of Litchfield Park's Building Safety fee schedule has no dedicated EV-charger, EVSE, or electric-vehicle-charging line item -- unlike Photovoltaic Systems, which get their own fee table. Installing a Level 2 (240V) home EV charger requires a City of Litchfield Park Electrical Permit reviewed against the adopted 2017 NEC. If the installation requires a panel repair, replacement, or upsizing, it is billed under the schedule's 'Electrical -- Repair/Replace/Add Panel' fee tiers; a simple new circuit added to an existing panel with no other listed electrical work would fall under the schedule's residual 'All Other Projects Not Listed Above' (Based on Valuation) category -- Building Safety should be asked to confirm which line applies to a specific installation.
Verified 2026-07-20 · Source
Requirements
- Electrical work reviewed against the City's adopted 2017 National Electrical Code (NEC)
- If the EV charger installation involves a panel repair, replacement, or amperage upgrade, it is billed under the schedule's amperage-tiered 'Repair/Replace/Add Panel' fee lines
- If the installation requires temporary power during construction, the Temporary Power fee line applies separately
- A simple new dedicated circuit added to an existing panel, with no panel work, is not explicitly itemized on the fee schedule and would likely fall under 'All Other Projects Not Listed Above' (Based on Valuation) -- confirm the applicable line with Building Safety before applying
- Simple electrical permits such as panel work may be issued over the counter per the City's Building Permit Q&A page
Required documents
- RequiredCity of Litchfield Park Electrical Permit applicationSubmitted to City of Litchfield Park Building Safety
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Repair/Replace/Add Panel, 400 amps or less (if the EV charger install requires panel work) | $100 | City of Litchfield Park Citywide Fee Schedule FY2026 (effective 8/1/2025), Section 3, Building Safety, Electrical, re-confirmed live 2026-07-20 by direct PDF fetch and full-text extraction -- no distinct 'EV charger'/'EVSE' line item exists; this is the panel-work fee an EV charger install would fall under if it also touches the panel |
| Repair/Replace/Add Panel, 401-999 amps | $150 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| Temporary Power (if needed during installation) | $100 | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 |
| All Other Projects Not Listed Above (if the install is a standalone new circuit with no panel work) | BOV (Based on Valuation) | City of Litchfield Park Citywide Fee Schedule FY2026, Section 3 -- residual valuation-based category for electrical work not otherwise itemized on the fee schedule; confirm classification with Building Safety before applying |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Litchfield Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.