Skip to main content
PermitBase

Surprise building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Surprise, Arizona.

Verified 2026-06-29 · Source

How to schedule

Inspections are requested through the building department below.

Address
16000 N. Civic Center Plz., Surprise, AZ 85374
Phone
623-222-3000
Office hours
Monday through Friday, 8 a.m. to 5 p.m., excluding City-observed holidays

Inspection sequence

Applies to: Residential Building Permit (New Construction / Custom Home)

  1. 1

    Foundation / Pre-pour

    Underground plumbing, electrical, rebar, and footings inspected before concrete is poured.

  2. 2

    Rough Framing and Trades

    Rough framing, electrical, plumbing, and mechanical inspected before insulation and drywall.

  3. 3

    Insulation

    Insulation inspected before drywall installation where required by energy code.

  4. 4

    Final

    All work complete per approved plans; all fixtures, devices, and systems inspected at final before Certificate of Occupancy is issued.

Applies to: Commercial / Multifamily Building Permit

  1. 1

    Foundation / Structural

    Structural, foundation, and underground inspections per approved plans.

  2. 2

    Rough Trades

    Rough electrical, mechanical, plumbing, and framing inspected before walls are closed.

  3. 3

    Final / Certificate of Occupancy

    All code-required work complete per approved plans; Certificate of Occupancy issued at conclusion.

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Rough electrical wiring and conduit inspected before walls are closed.

  2. 2

    Final Electrical

    All electrical work complete per approved plans; outlets, panels, fixtures, and service inspected at final.

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough Electrical

    Charging circuit wiring and conduit inspected before walls are closed

  2. 2

    Final Electrical

    Charging equipment installed per approved plans; outlets, panel, and service inspected at final

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Rough ductwork and mechanical rough-in inspected before walls are closed.

  2. 2

    Final Mechanical

    HVAC equipment, ductwork, venting, and all mechanical systems inspected at final.

Applies to: Plumbing Permit (incl. Water Heater)

  1. 1

    Rough Plumbing

    Underground and rough-in plumbing inspected before walls are closed or concrete is poured.

  2. 2

    Final Plumbing

    All plumbing fixtures and connections inspected at final.

Applies to: Residential Addition / Alteration Permit

  1. 1

    Rough Framing and Trades (where applicable)

    Rough framing, rough electrical, plumbing, and mechanical inspected before insulation and drywall, as applicable to the scope of work.

  2. 2

    Final

    All permitted work complete per approved plans; final inspection before Certificate of Completion or Certificate of Occupancy.

Applies to: Residential Solar Photovoltaic (PV) Permit

  1. 1

    Rough / Electrical Inspection

    Wiring, conduit, and electrical connections inspected before system is energized.

  2. 2

    Final / PV Inspection

    Complete PV installation inspected per approved plans; system must not be energized before passing final inspection.

Applies to: Roofing Permit

  1. 1

    Roof Deck / Underlayment

    Roof deck, underlayment, and flashing inspected before covering material is applied (for permitted roofing projects).

  2. 2

    Final Roof

    Completed roofing inspected per approved plans.

Applies to: Swimming Pool Permit

  1. 1

    Pre-gunite / Structural

    Pool shell, bonding, and structural elements inspected before gunite or concrete is applied.

  2. 2

    Final / Barrier Inspection

    Complete pool installation inspected per approved plans including full pool barrier compliance (fence, gates, pool signs permanently mounted with metal screws). An adult must be home for the final inspection.

Re-inspection fees

Residential Building Permit (New Construction / Custom Home)Re-inspection · Citywide Fee Schedule, Resolution #2026-16, effective 5/19/2026.
$100 per hour ($200.00 minimum)
Residential Addition / Alteration PermitRe-inspection · Citywide Fee Schedule, Resolution #2026-16, effective 5/19/2026.
$100 per hour ($200.00 minimum)
Residential Solar Photovoltaic (PV) PermitRe-inspection · Citywide Fee Schedule, Resolution #2026-16, effective 5/19/2026.
$100 per hour ($200.00 minimum)

Surprise building permits

Get alerts for Surprise

We'll email you when Surprise's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.