This is PermitBase’s published record for Tempe as of 2026-08-16. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Tempe building permits
VerifiedTempe, Arizona — as published 2026-08-16.
Verified 2026-06-29 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Single-Family / Duplex / Townhome)
VerifiedRequired for new construction of single-family residences, duplexes, and townhomes in Tempe. Residential plan review applies to all new construction, additions, and renovations meeting the adopted codes and Tempe amendments. All plan submittals must be made electronically through the Tempe Citizen Access Portal in accordance with the Electronic Plan Review Submittal Guidelines. A registered account is required. Once a permit is issued, building inspections must be requested before proceeding to the next construction phase.
Verified 2026-06-29 · Source
Requirements
- Submit all plans and applications electronically through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx); a registered account is required
- Plans must be submitted in accordance with the Electronic Plan (E-Plan) Review Submittal Guidelines
- Plans must comply with all Tempe adopted building codes (2018 I-Codes with Tempe amendments, 2017 NEC with Tempe amendments)
- Contractor Affidavit (State of AZ legal requirement per AZ Department of Revenue) required
- Once a permit is issued, inspections must be requested through the Citizen Access Portal or the 24-hour IVR system before proceeding with the next step of construction; all work must be approved by the inspector before proceeding
Required documents
- RequiredElectronic Plan (E-Plan) Review Submittal GuidelinesRequired guidelines for all electronic plan submittals; available on the Tempe Building Safety Plan Review – Residential page
- RequiredContractor AffidavitState of Arizona legal requirement per AZ Department of Revenue; available on the Applications + Forms page and the Citizen Access Portal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (Table 1-A, effective July 1, 2025) | $1–$500: $97; $501–$2,000: $97.86 for the first $500 plus $6.67 for each additional $100 or fraction thereof, to and including $2,000; $2,001–$25,000: $197.78 for the first $2,000 plus $30.61 for each additional $1,000 or fraction thereof, to and including $25,000; $25,001–$50,000: $901.36 for the first $25,000 plus $22.06 for each additional $1,000 or fraction thereof, to and including $50,000; $50,001–$100,000: $1,453.41 for the first $50,000 plus $15.31 for each additional $1,000 or fraction thereof, to and including $100,000; $100,001–$500,000: $2,218.67 for the first $100,000 plus $12.23 for each additional $1,000 or fraction thereof, to and including $500,000; $500,001–$1,000,000: $7,115.86 for the first $500,000 plus $10.41 for each additional $1,000 or fraction thereof, to and including $1,000,000; $1,000,001 and up: $12,308.85 for the first $1,000,000 plus $8.00 for each additional $1,000 or fraction thereof | Tempe Table 1-A — Building Permit Fees, effective July 1, 2025 (annual CPI-adjusted by Tempe City Council). Show full citationHideTempe Table 1-A — Building Permit Fees, effective July 1, 2025 (annual CPI-adjusted by Tempe City Council). The construction valuation is the total value of all proposed work including finish work, roofing, electrical, mechanical, plumbing, HVAC, landscaping, material and labor. Valuation is the greater of the applicant's declared estimate or the department's Building Valuation Data table. Source: Community Development Service Fees cover sheet (showpublisheddocument/108212/638527562929230000) and Table 1-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA1UIPEFE). |
| Plan Review Fee | 65% of the Building Permit Fee | Plan Review Fees are paid at application submission, separately from and in addition to the Building Permit Fee (paid at permit issuance). Show full citationHidePlan Review Fees are paid at application submission, separately from and in addition to the Building Permit Fee (paid at permit issuance). The Plan Review Fee covers the initial review and two subsequent re-submittals; additional reviews (4th and beyond) or an expired application may trigger additional fees at $190 per hour (minimum 1 hour). Source: Community Development Service Fees, revised July 1, 2023 (showpublisheddocument/108212/638527562929230000). |
| Re-inspection / out-of-hours inspection | $158 per hour (minimum 3 hours for out-of-hours; minimum 1 hour for others) | Table 1-A — Other Fees: inspections outside normal business hours at $158/hr (min 3 hours); Show full citationHideTable 1-A — Other Fees: inspections outside normal business hours at $158/hr (min 3 hours); re-inspection fees and inspections for which no fee is specifically indicated at $158/hr (min 1 hour). Source: Table 1-A effective July 1, 2025 (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA1UIPEFE). |
Commercial / Multifamily Building Permit (Tenant Improvement, New Commercial, Mixed-Use)
VerifiedRequired for new commercial buildings, multifamily residential, tenant improvements, additions, alterations, and change of occupancy in Tempe. Commercial Plan Review ensures compliance with Tempe's adopted building codes, safety regulations, and zoning requirements before permits are issued. Plans for offices, retail, restaurants, and other commercial projects are reviewed for structural integrity, fire safety, accessibility (2010 ADA and ICC A117.1), and energy efficiency. All plan submittals must be electronic through the Tempe Citizen Access Portal.
Verified 2026-06-29 · Source
Requirements
- Submit plans electronically through the Tempe Citizen Access Portal per the Electronic Plan (E-Plan) Review Submittal Guidelines
- Plans must comply with Tempe's adopted 2018 I-Codes (IBC, IFC, IPC, IMC, IFGC, IECC, IEBC) and 2017 NEC, all with Tempe amendments
- Commercial Tenant Improvement projects must include a Commercial Building Tenant Improvement (T.I.) Project Checklist
- Contractor Affidavit (State of AZ requirement per AZ Department of Revenue) required
- Email building code and private development engineering questions to permitcenter@tempe.gov
Required documents
- RequiredElectronic Plan (E-Plan) Review Submittal GuidelinesRequired for all electronic plan submittals; sets format and content requirements
- RequiredCommercial Building Tenant Improvement (T.I.) Project ChecklistRequired for commercial tenant improvement permits; referenced on the Commercial Plan Review page
- RequiredContractor AffidavitState of Arizona legal requirement per AZ Department of Revenue; available on the Applications + Forms page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (Table 1-A, effective July 1, 2025) | $100,001–$500,000: $2,218.67 for the first $100,000 plus $12.23 per additional $1,000; $500,001–$1,000,000: $7,115.86 for the first $500,000 plus $10.41 per additional $1,000; $1,000,001 and up: $12,308.85 for the first $1,000,000 plus $8.00 per additional $1,000. Smaller valuations: $1–$500: $97; $501–$2,000: $97.86 + $6.67 per additional $100; $2,001–$25,000: $197.78 + $30.61 per additional $1,000; $25,001–$50,000: $901.36 + $22.06 per additional $1,000; $50,001–$100,000: $1,453.41 + $15.31 per additional $1,000. | Tempe Table 1-A — Building Permit Fees (effective July 1, 2025; annual CPI adjustment). Source: library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA1UIPEFE. |
| Plan Review Fee | 65% of the Building Permit Fee, collected at application submission | Covers initial review and two subsequent re-submittals. Additional reviews (4th and beyond) are charged at $190 per hour (minimum 1 hour). Source: Community Development Service Fees (showpublisheddocument/108212). |
Electrical Permit
VerifiedElectrical work in Tempe is governed by the 2017 National Electrical Code (NEC) with Tempe amendments, adopted in Tempe City Code Chapter 8, Article VIII. Electrical permits are applied for through the Tempe Citizen Access Portal. A flat-rate fee applies for residential electrical service replacements or upgrades under 300 amps (Table 2-A); all other electrical work uses the valuation-based Table 1-A building permit fee, plus a 65% plan review fee where plan review is required.
Verified 2026-06-29 · Source
Requirements
- Electrical work must comply with the 2017 National Electrical Code (NEC) with Tempe amendments (Tempe City Code Ch. 8, Art. VIII)
- Apply electronically through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx)
- Contractor Affidavit required (State of AZ requirement per AZ Department of Revenue)
- Arizona Registrar of Contractors (ROC)-licensed electrical contractor generally required; owner-builder exemptions may apply under ARS 32-1121
Required documents
- RequiredContractor AffidavitState of Arizona legal requirement per AZ Department of Revenue; available on the Applications + Forms page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Replace/Upgrade Residential Electrical Service < 300 Amp — flat fee (Table 2-A, effective July 1, 2025) | $195 (includes plan review) | Table 2-A — Building Permit Flat Fees, effective July 1, 2025: 'REPLACE/UPGRADE RESIDENTIAL ELECTRICAL SERVICE < 300 AMP — $195 *Includes Plan Review fee.' Source: Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE). |
| Temporary Power Pole or Pedestal — flat fee (Table 2-A, effective July 1, 2025) | $97 (includes plan review) | Table 2-A — Building Permit Flat Fees: 'TEMPORARY POWER POLE OR PEDESTAL — $97 *Includes Plan Review fee.' Source: Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE). |
| Other electrical work — valuation-based (Table 1-A, effective July 1, 2025) | Per Table 1-A tiers. Plan Review Fee is 65% of the building permit fee, collected separately at application. | For electrical work not covered by a Table 2-A flat rate, the valuation-based Table 1-A applies. Source: Table 1-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA1UIPEFE). |
Plumbing Permit (incl. Water/Sewer Line Replacement)
VerifiedPlumbing work in Tempe is governed by the 2018 International Plumbing Code (IPC) with Tempe amendments. Plumbing permits are applied for through the Tempe Citizen Access Portal. A flat-rate fee applies for residential water/sewer line replacement (Table 2-A); all other plumbing work uses the valuation-based Table 1-A building permit fee, plus a 65% plan review fee where required.
Verified 2026-06-29 · Source
Requirements
- Plumbing work must comply with the 2018 International Plumbing Code (IPC) with Tempe amendments
- Apply electronically through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx)
- Contractor Affidavit required (State of AZ requirement per AZ Department of Revenue)
- Arizona ROC-licensed plumbing contractor generally required; owner-builder exemptions may apply under ARS 32-1121
Required documents
- RequiredContractor AffidavitState of Arizona legal requirement per AZ Department of Revenue
- OptionalSewer Installation CertificateRequired for sewer work; available on the Inspections page (showpublisheddocument/12017)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single Family Water/Sewer Line Replacement — flat fee (Table 2-A, effective July 1, 2025) | $242 (includes plan review) | Table 2-A — Building Permit Flat Fees: 'SINGLE FAMILY WATER/SEWER LINE REPLACEMENT — $242 *Includes Plan Review fee.' Effective July 1, 2025. Source: Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE). |
| Other plumbing work — valuation-based (Table 1-A, effective July 1, 2025) | Per Table 1-A tiers. Plan Review Fee is 65% of the building permit fee, collected separately at application. | For plumbing work not covered by a Table 2-A flat rate, the valuation-based Table 1-A applies. Source: Table 1-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA1UIPEFE). |
Mechanical / HVAC Permit
VerifiedMechanical and HVAC work in Tempe is governed by the 2018 International Mechanical Code (IMC) and 2018 International Fuel Gas Code (IFGC), both with Tempe amendments. Mechanical permits are applied for through the Tempe Citizen Access Portal. Permit fees follow the valuation-based Table 1-A; no separate mechanical flat-rate table is published in Table 2-A.
Verified 2026-06-29 · Source
Requirements
- Mechanical/HVAC work must comply with the 2018 IMC and 2018 IFGC with Tempe amendments
- Apply electronically through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx)
- Contractor Affidavit required (State of AZ requirement per AZ Department of Revenue)
- Arizona ROC-licensed mechanical contractor generally required; owner-builder exemptions may apply under ARS 32-1121
Required documents
- RequiredContractor AffidavitState of Arizona legal requirement per AZ Department of Revenue
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical / HVAC permit — valuation-based (Table 1-A, effective July 1, 2025) | Per Table 1-A tiers. For example: $2,001–$25,000: $197.78 for the first $2,000 plus $30.61 per additional $1,000. Plan Review Fee is 65% of the building permit fee, collected separately at application. | Tempe does not publish a separate mechanical flat-rate table in Table 2-A. All mechanical work uses the valuation-based Table 1-A. Source: Table 1-A and Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA1UIPEFE and _TA2UIPEFLFE). |
Residential Solar Photovoltaic (PV) Permit — SolarAPP+ eligible
VerifiedTempe's Building Safety Division accepts SolarAPP+ approved designs for single-family residential photovoltaic (PV) permitting. SolarAPP+ is a third-party software program that verifies code compliance for eligible residential PV systems, enabling same-day permit approvals for qualifying projects. Tempe has been awarded SolSmart Silver designation recognizing its solar-friendly permitting process. All permit applications are made through the Tempe Citizen Access Portal. The flat fee is $538 per Table 2-A (effective July 1, 2025), which includes the plan review fee.
Verified 2026-06-29 · Source
Requirements
- Applicant must be an Arizona licensed contractor
- Located within City of Tempe limits
- Residential (single-family or duplex residence) rooftop installations only
- Residential Energy Storage systems are in scope (newer SolarAPP+ eligibility)
- Structure supporting the PV system must be legal, permitted, and code-compliant
- No ballasted or ground-mounted systems
- Not located within a Historic Preservation district or FEMA Special Flood Hazard Area
- Technical requirements for solar without existing Energy Storage System (ESS): 400-amp maximum electrical service, single phase only; maximum 2 DC strings in parallel; if microinverter, one module per microinverter; only one module type; up to two inverter types (string) or one (microinverter)
- Non-SolarAPP+ submittals: submit plans through the Citizen Access Portal following Electronic Plan (E-Plan) Review Submittal Guidelines
- SolarAPP+ process: (1) Determine eligibility; (2) Submit design to SolarAPP+ (gosolarapp.org); (3) Apply for Building Permit through Citizen Access Portal — include SolarAPP+ approval number; (4) Schedule Building Final inspection through Citizen Access Portal
Required documents
- RequiredSolarAPP+ approval (approval number and approved documents)Obtain SolarAPP+ code-compliance approval at gosolarapp.org; include the approval number in the Citizen Access Portal application. A processing fee is assessed by SolarAPP+.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single Family Photovoltaic System — flat fee (Table 2-A, effective July 1, 2025) | $538 (includes plan review) | Table 2-A — Building Permit Flat Fees: 'SINGLE FAMILY PHOTOVOLTAIC SYSTEM — $538 *Includes Plan Review fee.' Effective July 1, 2025. Source: Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE). |
Residential Swimming Pool / Spa Permit
VerifiedA permit is required for new residential swimming pools and spas in Tempe under the 2018 International Swimming Pool and Spa Code (ISPSC) with Tempe amendments. The flat fee for a new residential swimming pool is $489 (Table 2-A, effective July 1, 2025), which includes the plan review fee. All applications are submitted through the Tempe Citizen Access Portal.
Verified 2026-06-29 · Source
Requirements
- New residential swimming pool permit required; comply with 2018 ISPSC with Tempe amendments
- Apply electronically through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx)
- Contractor Affidavit required
- A Pool Elevation Waiver is available for applicable projects (see Inspections page)
Required documents
- RequiredContractor AffidavitState of Arizona legal requirement per AZ Department of Revenue
- OptionalPool Elevation WaiverAvailable on the Inspections page for applicable projects
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Residential Swimming Pool Permit — flat fee (Table 2-A, effective July 1, 2025) | $489 (includes plan review) | Table 2-A — Building Permit Flat Fees: 'NEW RESIDENTIAL SWIMMING POOL PERMIT — $489 *Includes Plan Review fee.' Effective July 1, 2025. Source: Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE). |
Accessory Dwelling Unit (ADU) Permit
VerifiedTempe City Council adopted ADU regulations in compliance with Arizona House Bill 2720, which requires municipalities with populations of 75,000 or more to permit ADUs on all lots where single-family dwellings are allowed. On all lots with a single-family dwelling, one attached and one detached ADU are allowed. Lots of one acre (43,560 sq ft) or more may have one additional ADU if at least one is income-restricted affordable housing (80% AMI). ADUs must comply with Tempe's adopted 2018 I-Codes and the adopted ADU ordinance. ADU permits are applied for through the Tempe Citizen Access Portal. Tempe publishes approved standard ADU plan designs and an ADU Development Guide.
Verified 2026-06-29 · Source
Requirements
- Allowed on all lots with an existing single-family dwelling: one attached ADU and one detached ADU
- Lots one acre or larger may have one additional ADU if at least one is income-restricted at 80% AMI
- Maximum livable floor area: 75% of the interior habitable floor area of the main home OR 1,000 sq ft (whichever is less) for lots under 1 acre; 75% OR 2,000 sq ft for lots 1 acre or more
- Setbacks: rear, side, and street-side setback minimum 5 feet in all districts (unless a lesser setback exists); front yard setback consistent with the zoning district single-family standard
- Height limited to that allowed in the zoning district (typically 30 ft); two-story ADU designs require a Use Permit (per December 17, 2025 Board of Adjustment decision)
- Lot coverage standards of the underlying zoning district apply
- No additional parking is required for an ADU (prohibited by HB 2720)
- ADU is not required to match the exterior design of the main structure
- Apply electronically through the Tempe Citizen Access Portal
- ADU Standard Plans (pre-approved designs) are available from Tempe — see standard plan library at tempe.gov
Required documents
- OptionalADU Development GuideStep-by-step guide to determine eligibility, allowable size, and other requirements; available on the Tempe ADU page (tempe.gov/government/community-development/planning/accessory-dwelling-units-adus)
- OptionalAdopted ADU Ordinance / Code Text AmendmentThe adopted ADU code text amendment is available on the Tempe Planning ADU page
- OptionalADU Standard PlansPre-approved standard ADU plan designs available at no cost from Tempe's Standard Plan Library (tempe.gov/government/community-development/building-safety/standard-plans/adu-and-single-family-standard-plan-library)
- RequiredContractor AffidavitState of Arizona legal requirement per AZ Department of Revenue
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| ADU building permit — valuation-based (Table 1-A, effective July 1, 2025) | Per Table 1-A tiers based on construction valuation. For example, an ADU with construction valuation of $100,001–$500,000: $2,218.67 for the first $100,000 plus $12.23 per additional $1,000. Plan Review Fee is 65% of the building permit fee, collected at application. | Tempe does not publish a separate ADU flat-rate fee; ADUs are permitted under the valuation-based Table 1-A. Source: Table 1-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA1UIPEFE). |
Patio Cover Permit (Single-Family Residence Addition)
VerifiedA building permit is required for the addition of a patio cover to a single-family residence in Tempe. A flat fee of $294 per patio cover applies (Table 2-A, effective July 1, 2025), which includes the plan review fee. A handout on Residential Patio Cover Addition requirements is available on the Tempe Applications + Forms page. Convert-to-livable-space projects (converting a patio cover to habitable room) carry a higher flat fee.
Verified 2026-06-29 · Source
Requirements
- Apply electronically through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx)
- Plans must comply with the 2018 IRC (for residential) and 2018 IMC (if mechanical/electrical involved) with Tempe amendments
- Refer to the Residential Patio Cover Addition handout for Tempe-specific requirements
- Contractor Affidavit required
Required documents
- OptionalResidential Patio Cover Addition HandoutTempe-specific requirements for single-family patio cover additions; available on the Applications + Forms page (showpublisheddocument/79539)
- RequiredContractor AffidavitState of Arizona legal requirement per AZ Department of Revenue
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Patio Cover Addition to Single-Family Residence — flat fee (Table 2-A, effective July 1, 2025) | $294 per patio cover (includes plan review) | Table 2-A — Building Permit Flat Fees: 'PATIO COVER ADDITION TO SINGLE FAMILY RESIDENCE (PER PATIO COVER) — $294 *Includes Plan Review fee.' Effective July 1, 2025. Show full citationHideTable 2-A — Building Permit Flat Fees: 'PATIO COVER ADDITION TO SINGLE FAMILY RESIDENCE (PER PATIO COVER) — $294 *Includes Plan Review fee.' Effective July 1, 2025. Convert Single Family Carport, Garage or Patio Cover to Livable (habitble space): $978 flat fee. Source: Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE). |
Demolition Permit
VerifiedA demolition permit is required in Tempe for the demolition of any structure. A flat fee of $97 per structure (per Table 2-A, effective July 1, 2025, includes plan review) applies for full demolition. Non-structural interior demolition carries a separate flat fee of $97. All applications are submitted through the Tempe Citizen Access Portal.
Verified 2026-06-29 · Source
Requirements
- Apply electronically through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx)
- Contractor Affidavit required (State of AZ requirement per AZ Department of Revenue)
- Arizona 811/Blue Stake (call-before-you-dig) compliance required before any excavation
- Asbestos surveys and abatement may be required for older structures — contact ADEQ for requirements
Required documents
- RequiredContractor AffidavitState of Arizona legal requirement per AZ Department of Revenue
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit (per structure) — flat fee (Table 2-A, effective July 1, 2025) | $97 per structure (includes plan review) | Table 2-A — Building Permit Flat Fees: 'DEMOLITION PERMIT (PER STRUCTURE) — $97 *Includes Plan Review fee.' Effective July 1, 2025. Source: Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE). |
| Non-Structural Interior Demolition — flat fee (Table 2-A, effective July 1, 2025) | $97 (includes plan review) | Table 2-A: 'NON-STRUCTURAL INTERIOR DEMOLITION — $97 *Includes Plan Review fee.' Effective July 1, 2025. Source: Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE). |
Sign Permit (Building / Wall-Mounted, Monument, Banner)
VerifiedSign permits in Tempe are required for building/wall-mounted signs, monument signs, and banners. Sign permit applications (SGN) are submitted through the Tempe Citizen Access Portal under 'Planning/Signs' > 'Planning' > 'Sign Permit [SGN]'. A Sign Development Plan Review (DPR) is required for all developments in mixed-use (MU-X) zoning districts, commercial centers with more than one tenant, and for single-tenant buildings altering space for additional tenants. Banner permits (Sign Type 'K') are approved administratively by the Permit Center within 24–48 business hours. A Planning Plan Review Fee of $143 applies (Table 2-A flat fee).
Verified 2026-06-29 · Source
Requirements
- Apply through the Tempe Citizen Access Portal: 'New' > 'Planning/Signs' > 'Planning' > 'Sign Permit [SGN]'
- All items on the Sign Permit Submittal Checklist must be provided for the application to be accepted as Administratively Complete
- Signs must comply with Tempe Zoning and Development Code (ZDC) Chapter 9 — Signs, Section 4-902 — General Sign Standards
- Sign Development Plan Review (DPR) required for mixed-use (MU-X) districts, commercial centers with more than one tenant, and single-tenant buildings altered for additional tenants
- Banner permits (Type 'K'): Grand Opening — 30-day permit (once per business); Significant Event — 21-day permit (twice per year, may be non-consecutive)
Required documents
- RequiredSign Permit Submittal ChecklistAll items on the checklist must be provided for the application to be Administratively Complete; available through the Citizen Access Portal sign permit process
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Planning Plan Review Fee — flat fee (Table 2-A, effective July 1, 2025) | $143 | Table 2-A — Building Permit Flat Fees: 'PLANNING PLAN REVIEW FEE — $143.' Effective July 1, 2025. This fee applies to planning reviews including sign permits. Source: Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE). |
Electric Vehicle (EV) Charging Station Permit
VerifiedTempe does not publish a distinct EV charger / EVSE line item in its Table 2-A Building Permit Flat Fees schedule (the table lists flat fees for items such as residential electrical service upgrades and temporary power poles, but no separate EV charging station category). An EV charging station installation — new circuit, subpanel, or dedicated branch circuit for a Level 2 charger — is permitted as standard Electrical work under Tempe City Code Chapter 8, Article VIII (2017 NEC with Tempe amendments), applied for through the Citizen Access Portal, and billed under the valuation-based Table 1-A fee schedule (the same mechanism documented in this dataset's electrical-permit entry for 'other electrical work' not covered by a Table 2-A flat rate), plus a 65% plan review fee where plan review is required. SolarAPP+ (gosolarapp.org) is used by Tempe for eligible residential solar PV, but SolarAPP+ does not process EV charger permits.
Verified 2026-07-20 · Source
Requirements
- Electrical work must comply with the 2017 National Electrical Code (NEC) with Tempe amendments (Tempe City Code Ch. 8, Art. VIII)
- Apply electronically through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx)
- Contractor Affidavit required (State of AZ requirement per AZ Department of Revenue)
- Arizona Registrar of Contractors (ROC)-licensed electrical contractor generally required; owner-builder exemptions may apply under ARS 32-1121
- No distinct EV-charger permit type exists — apply as a standard Electrical Permit and describe the EV charging station scope of work
Required documents
- RequiredContractor AffidavitState of Arizona legal requirement per AZ Department of Revenue; available on the Applications + Forms page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| EV charging station electrical work — valuation-based (Table 1-A, effective July 1, 2025) | Per Table 1-A tiers, based on project valuation. Plan Review Fee is 65% of the building permit fee where plan review applies. | Table 2-A (Building Permit Flat Fees) does not list a distinct EV charger / EVSE fee item as of the last verification; Show full citationHideTable 2-A (Building Permit Flat Fees) does not list a distinct EV charger / EVSE fee item as of the last verification; EV charging station work falls under the general Table 1-A valuation-based fee used for electrical work not covered by a Table 2-A flat rate. Source: Table 1-A and Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH). |
Fire Sprinkler / Fire Alarm Permit (Fire Construction Permit)
VerifiedTempe Fire Medical Rescue Department issues fire construction permits for the installation of and modification to fire and life-safety systems, including automatic fire sprinkler systems (IFC 105.7.1) and fire alarm and detection systems (IFC 105.7.7). Tempe City Code Sec. 14-16 adopts the International Fire Code, 2024 Edition (Ord. No. O2026.24, Sec. 13(Exh. B), adopted June 4, 2026), and Sec. 14-17 provides that it 'shall be enforced by the Fire Medical Rescue Department of the City, under the supervision of the Fire Marshal'; the Tempe amendments create the Community Risk Reduction Division as the fire code official. Construction documents are submitted for review through the Tempe Citizen Access Portal using the Fire [FR] Application. Fees are time-based rather than flat: the adopted fee schedule sets a labor rate of $93.35 per hour plus a published base time in hours for each permit type, cumulative, with additional review or inspection time assessed at the hourly rate.
Verified 2026-08-15 · Source
Requirements
- Tempe City Code Sec. 14-16 adopts the International Fire Code, 2024 Edition, together with appendix chapters B, C, H, I, K, O and J
- A construction permit is required for the installation and modification of fire and/or life-safety systems and equipment, and for a broad range of operations and systems involving hazardous materials (Tempe Fire Prevention, Fire Inspections page)
- Construction documents are submitted for review through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx)
- Use the Fire [FR] Application. Part 2 of the form requires the applicant to identify Automatic Fire Sprinkler System (Installation or Modification, with the number of sprinkler heads) and/or Fire Alarm and Detection Systems (Installation or Modification, with the number of devices)
- Operational permit applications must be submitted at least 10 working days prior to the anticipated commencement date; a Fire Inspector then contacts the applicant for any additional documentation
- Once a construction permit has been issued and work has begun, all permit inspections must be requested through the 24-hour Interactive Voice Response (IVR) system or scheduled online through the Citizen Access Portal
- Tempe amends IFC Section 903.2 to remove the model code's area and occupant-load sprinkler thresholds: an automatic sprinkler system is required throughout buildings and portions thereof used as Group A-1, A-2, A-3, A-4 and A-5, Group B, Group E, Group F-1, Group M, Group R, Group S-1 and Group S-2 parking garage occupancies
- Tempe amends IFC Section 903.2.11.3 to require an automatic sprinkler system throughout buildings located 55 feet or more above the lowest level of fire department vehicle access
- Tempe adds IFC Section 105.6.26: a construction permit is required for installation of or modification to a Fire Fighter Air Replenishment System (FARS)
- Tempe adds IFC Section 901.6.3.2: on completion of inspection, testing and maintenance of a fire protection system, a tag must be attached in a conspicuous location documenting the date, the contractor and AZROC license number, the individual who performed the work, and whether the system is compliant or deficiencies were noted
Required documents
- RequiredFire [FR] ApplicationCity of Tempe Community Development Department 'Fire Application' (Parts 1 and 2). Part 2 lists the fire construction permit types and requires quantities (sprinkler heads, alarm devices). Published at tempe.gov/government/community-development/building-safety/applications-forms.
- RequiredConstruction documents / system plansFire protection system plans submitted for review through the Citizen Access Portal. Review times assume complete and clear plan submittals.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire construction permit labor rate (all construction permit types) | $93.35 per hour | Verbatim: 'Construction permit fees listed below are based on a labor rate of $93.35 per hour. Show full citationHideVerbatim: 'Construction permit fees listed below are based on a labor rate of $93.35 per hour. The base time for plan review and inspections during normal business hours are indicated with each permit type. Additional time to complete the plan review or inspection will be assessed at the hourly rate. Additional system features will be added to the base fee. Fees will be cumulative.' Read from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees' (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_FIRE_PREVENTION_PROTECTION). Verified against a rendered screenshot of that table, not text extraction alone. The section's citation line ends 'R2025.66, effective 7-1-26', so this is the schedule currently in force. Tempe's Building Safety Fees page links this Municode section as the City's 'Fire Protection & Prevention Fees'. |
| 105.7.1 Automatic Fire Sprinkler Systems, Installations, plan review/inspection up to 200 heads | 5.0 hours base time | Base time in hours, billed at the $93.35 hourly labor rate. Show full citationHideBase time in hours, billed at the $93.35 hourly labor rate. The product is deliberately not computed here. Read from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees' (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_FIRE_PREVENTION_PROTECTION). Verified against a rendered screenshot of that table, not text extraction alone. The section's citation line ends 'R2025.66, effective 7-1-26', so this is the schedule currently in force. Tempe's Building Safety Fees page links this Municode section as the City's 'Fire Protection & Prevention Fees'. |
| 105.7.1 Automatic Fire Sprinkler Systems, Installations, each additional 200 heads | 4.0 hours base time | Read from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees'… Show full citationHideRead from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees' (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_FIRE_PREVENTION_PROTECTION). Verified against a rendered screenshot of that table, not text extraction alone. The section's citation line ends 'R2025.66, effective 7-1-26', so this is the schedule currently in force. Tempe's Building Safety Fees page links this Municode section as the City's 'Fire Protection & Prevention Fees'. |
| 105.7.1 Automatic Fire Sprinkler Systems, Modifications, 1 to 20 heads (over-the-counter permit/inspection) | 2.0 hours base time | Read from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees'… Show full citationHideRead from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees' (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_FIRE_PREVENTION_PROTECTION). Verified against a rendered screenshot of that table, not text extraction alone. The section's citation line ends 'R2025.66, effective 7-1-26', so this is the schedule currently in force. Tempe's Building Safety Fees page links this Municode section as the City's 'Fire Protection & Prevention Fees'. |
| 105.7.1 Automatic Fire Sprinkler Systems, Modifications, plan review/inspection 21 to 200 heads | 4.0 hours base time | Each additional 200 heads adds 3.0 hours base time. Show full citationHideEach additional 200 heads adds 3.0 hours base time. Read from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees' (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_FIRE_PREVENTION_PROTECTION). Verified against a rendered screenshot of that table, not text extraction alone. The section's citation line ends 'R2025.66, effective 7-1-26', so this is the schedule currently in force. Tempe's Building Safety Fees page links this Municode section as the City's 'Fire Protection & Prevention Fees'. |
| 105.7.7 Fire Alarm and Detection Systems, Installations, plan review/inspection up to 200 devices | 6.0 hours base time | Each additional 200 devices adds 5.0 hours; Show full citationHideEach additional 200 devices adds 5.0 hours; Dedicated Function Systems carry 3.0 hours base time. Read from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees' (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_FIRE_PREVENTION_PROTECTION). Verified against a rendered screenshot of that table, not text extraction alone. The section's citation line ends 'R2025.66, effective 7-1-26', so this is the schedule currently in force. Tempe's Building Safety Fees page links this Municode section as the City's 'Fire Protection & Prevention Fees'. |
| 105.7.7 Fire Alarm and Detection Systems, Modifications, 1 to 10 devices (over-the-counter permit/inspection) | 2.0 hours base time | Read from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees'… Show full citationHideRead from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees' (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_FIRE_PREVENTION_PROTECTION). Verified against a rendered screenshot of that table, not text extraction alone. The section's citation line ends 'R2025.66, effective 7-1-26', so this is the schedule currently in force. Tempe's Building Safety Fees page links this Municode section as the City's 'Fire Protection & Prevention Fees'. |
| 105.7.7 Fire Alarm and Detection Systems, Modifications, plan review/inspection 11 to 50 devices | 4.0 hours base time | Each additional 50 devices adds 3.0 hours base time. Show full citationHideEach additional 50 devices adds 3.0 hours base time. Read from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees' (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_FIRE_PREVENTION_PROTECTION). Verified against a rendered screenshot of that table, not text extraction alone. The section's citation line ends 'R2025.66, effective 7-1-26', so this is the schedule currently in force. Tempe's Building Safety Fees page links this Municode section as the City's 'Fire Protection & Prevention Fees'. |
| Re-inspections (after second re-inspection) / Inspections outside normal business hours / Inspector standby | 3.0 hours base time each | Read from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees'… Show full citationHideRead from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees' (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_FIRE_PREVENTION_PROTECTION). Verified against a rendered screenshot of that table, not text extraction alone. The section's citation line ends 'R2025.66, effective 7-1-26', so this is the schedule currently in force. Tempe's Building Safety Fees page links this Municode section as the City's 'Fire Protection & Prevention Fees'. |
| Plan Review Resubmittal (after third re-submittal) and Revision to Approved Plans | 2.0 hours base time each | Code Modification/Appeal Application carries 6.0 hours base time. Show full citationHideCode Modification/Appeal Application carries 6.0 hours base time. Read from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees' (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_FIRE_PREVENTION_PROTECTION). Verified against a rendered screenshot of that table, not text extraction alone. The section's citation line ends 'R2025.66, effective 7-1-26', so this is the schedule currently in force. Tempe's Building Safety Fees page links this Municode section as the City's 'Fire Protection & Prevention Fees'. |
| Work without permits; Expedited plan review | Double the permit fees | Read from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees'… Show full citationHideRead from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees' (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_FIRE_PREVENTION_PROTECTION). Verified against a rendered screenshot of that table, not text extraction alone. The section's citation line ends 'R2025.66, effective 7-1-26', so this is the schedule currently in force. Tempe's Building Safety Fees page links this Municode section as the City's 'Fire Protection & Prevention Fees'. |
| Fire Protection System Testing and Maintenance Service Fee | $10.29 per ITM Report | Listed under 'Administrative Fees' in the same adopted Fire Prevention and Protection fee section. Show full citationHideListed under 'Administrative Fees' in the same adopted Fire Prevention and Protection fee section. Read from the City's adopted Schedule of Fees and Charges, Appendix A of the Tempe City Code, section 'FIRE PREVENTION AND PROTECTION' > 'Construction Permit Fees' (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_FIRE_PREVENTION_PROTECTION). Verified against a rendered screenshot of that table, not text extraction alone. The section's citation line ends 'R2025.66, effective 7-1-26', so this is the schedule currently in force. Tempe's Building Safety Fees page links this Municode section as the City's 'Fire Protection & Prevention Fees'. |
Change of Use / Change of Occupancy Permit
Tempe regulates change of occupancy but does not publish a separately named 'change of use' permit. A change in the building occupancy classification of an existing space is permitted as a commercial building permit, submitted on the Building Permit [BP] Application under 'TENANT IMPROVEMENT - COMMERCIAL' or 'ADDITION / ALTERATION - COMMERCIAL', and results in the issuance of a new Certificate of Occupancy. The City's Certificate of Occupancy page states that 'a change in the building occupancy class of an existing space' is one of the instances that will result in the issuance of a certificate of occupancy, and that buildings or structures shall not be used or occupied until the building inspector approves the final inspection and approves the building for occupancy. Tempe's adopted 2018 International Existing Building Code governs the change-of-occupancy work itself. Projects whose new use results in a change of occupancy for an existing building may also qualify for Tempe's Adaptive Reuse program.
Reviewed 2026-08-15 · Source
Requirements
- Submit as a commercial building permit on the Building Permit [BP] Application, checking 'TENANT IMPROVEMENT - COMMERCIAL' or 'ADDITION / ALTERATION - COMMERCIAL' in the APPLICATIONS list
- The application requires the Occupancy Group, Occupancy Area and Occupancy Load for the project, plus an estimated construction valuation at the time of initial application (Tempe City Code Sec. 8-109.3, printed on the application form)
- Plans must be submitted electronically in accordance with the Electronic Plan (E-Plan) Review Submittal Guidelines
- Commercial Plan Review verifies compliance with Tempe's adopted building codes, safety regulations and zoning requirements, and reviews for structural integrity, fire safety, accessibility and energy efficiency before permits are issued
- A new Certificate of Occupancy is issued after all required inspections have been requested and approved; the certificate must be posted in a conspicuous place on the premises and may not be removed except by the building official
- Buildings or structures shall not be used or occupied until the building inspector approves the final inspection and approves the building for occupancy
- Optional Adaptive Reuse program eligibility: the building must have been constructed more than 20 years ago and be within city limits, be located within 100 feet of an arterial street, not exceed 5,000 square feet including proposed additions, and the new use must result in a change of occupancy for the existing building. The Community Development Director may approve projects meeting the intent of the program and two of the four criteria.
Required documents
- RequiredBuilding Permit [BP] ApplicationCity of Tempe Community Development Department Building Permit Application (Parts 1 and 2). Part 1 collects Occupancy Group, Occupancy Area, Occupancy Load and project valuation; Part 2 is the APPLICATIONS checklist where TENANT IMPROVEMENT - COMMERCIAL or ADDITION / ALTERATION - COMMERCIAL is selected.
- RequiredCommercial plan set (E-Plan electronic submittal)Plans must be submitted electronically per the Electronic Plan (E-Plan) Review Submittal Guidelines. Engineering plans must be submitted as a separate package under the EN number.
- OptionalPartial or Temporary Certificate of Occupancy ChecklistOnly if occupancy is needed before the project is complete. A temporary or partial certificate of occupancy may be issued if the inspection department finds that no hazard will result; contact the Building Inspection Administrator for eligibility.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit fee, Table 1-A (valuation based, effective July 1, 2026) | $1.00 to $500.00 valuation: $100.00. $501.00 to $2,000.00: $100.43 for the first $500.00 plus $6.87 for each additional $100.00 or fraction thereof. $2,001.00 to $25,000.00: $202.96 for the first $2,000.00 plus $31.52 for each additional $1,000.00 or fraction thereof. $25,001.00 to $50,000.00: $927.29 for the first $25,000.00 plus $22.72 for each additional $1,000.00. $50,001.00 to $100,000.00: $1,496.04 for the first $50,000.00 plus $15.77 for each additional $1,000.00. $100,001.00 to $500,000.00: $2,283.69 for the first $100,000.00 plus $12.58 for each additional $1,000.00. $500,001.00 to $1,000,000.00: $7,323.16 for the first $500,000.00 plus $10.71 for each additional $1,000.00. $1,000,001.00 and up: $12,665.30 for the first $1,000,000.00 plus $8.25 for each additional $1,000.00. | Read from TABLE 1-A, BUILDING PERMIT FEES in Appendix A of the Tempe City Code (Municode). The table's citation line ends 'Ord. of 7-1-26(1)', and the City's Fees page publishes the 2026-2027 fees as effective July 1, 2026. |
| Planning plan review fee, Table 2-A Building Permit Flat Fees (effective 07/01/2026) | $147.00 | Read from TABLE 2-A in Appendix A of the Tempe City Code (Municode), whose citation line ends 'Ord. Show full citationHideRead from TABLE 2-A in Appendix A of the Tempe City Code (Municode), whose citation line ends 'Ord. of 7-1-26(2)' and whose footnote reads '* Includes Plan Review fee 07/01/2026'. Note this supersedes the $143 figure recorded on Tempe's sign-permit entry from the 2025-2026 schedule; that entry has not been re-grounded in this pass. |
| Plan review fee | 65% of the building permit fee | Collected separately at application submission, per the City's Community Development Service Fees documentation already recorded in this file's localAmendments. Not re-verified in this pass. |
| Temporary certificate of occupancy, first 30 days or each 30 day extension, up to 90 days (Table 2-A) | $1,006.00 | The only occupancy-named line item anywhere in Table 2-A. Show full citationHideThe only occupancy-named line item anywhere in Table 2-A. There is no change-of-occupancy flat fee in the adopted schedule. Read from TABLE 1-A, BUILDING PERMIT FEES in Appendix A of the Tempe City Code (Municode). The table's citation line ends 'Ord. of 7-1-26(1)', and the City's Fees page publishes the 2026-2027 fees as effective July 1, 2026. |
| Re-inspection fees assessed under provisions of Sec. 108.8; inspections for which no fee is specifically indicated | $162.00 per hour | Listed under 'Other fees' immediately following Table 1-A. Show full citationHideListed under 'Other fees' immediately following Table 1-A. Inspections for which no fee is specifically indicated carry a one-hour minimum with half-hour increments thereafter. Read from TABLE 1-A, BUILDING PERMIT FEES in Appendix A of the Tempe City Code (Municode). The table's citation line ends 'Ord. of 7-1-26(1)', and the City's Fees page publishes the 2026-2027 fees as effective July 1, 2026. |
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tempe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.