Version history — Tempe, Arizona
This is PermitBase’s own verified record for Tempe, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Tempe’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-21Current record
- Tempe, Arizona — adopted-codes record updated
- 2026-08-16Superseded
- Tempe, Arizona — adopted-codes record updated
- 2026-07-20Superseded
- Tempe, Arizona — Electric Vehicle (EV) Charging Station Permit record added
- 2026-06-29Initial record — coverage of Tempe began