Unincorporated Maricopa County building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Maricopa County, Arizona.
Verified 2026-06-29 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 301 W. Jefferson, Suite 170, Phoenix, AZ 85003
- Phone
- 602-506-3301
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM
- Website
- Official site
Published scheduling rules
- For inspections: contact the assigned inspector listed in Permit Center ONLY on the date of your scheduled inspection. General scheduling questions: call 602-506-3301. (Residential Building Permit (New Construction, Addition, Accessory Structure))
- Inspection scheduling: contact the assigned inspector listed in Permit Center ONLY on the date of your scheduled inspection. For general information and scheduling questions call 602-506-3301. (General)
Inspection sequence
Applies to: Residential Building Permit (New Construction, Addition, Accessory Structure)
- 1
Footing/Foundation
Before concrete pour — verify footing depth, dimensions, and reinforcement per 2018 IRC/IBC
- 2
Framing
After framing, sheathing, and rough-in trades complete — before insulation or wall cover
- 3
Insulation
Insulation installed per 2018 IECC/IRC requirements before wall cover
- 4
Final
All work complete per approved plans; Certificate of Occupancy issued. Schedule via Permit Center or call 602-506-3301.
Applies to: Commercial Building Permit (New Construction, Tenant Improvement, Remodel)
- 1
Footing/Foundation
Before concrete pour — per 2018 IBC
- 2
Framing / Structural
After structural framing complete, before wall cover
- 3
Final
All work complete per approved plans; Certificate of Occupancy issued
Applies to: Pool / Spa Permit (In-Ground and Above-Ground)
- 1
Steel / Shell (Pre-gunite)
Verify rebar, rough plumbing, and pool shell before gunite or shotcrete application per 2018 IRC/IBC
- 2
Pool Barrier Inspection
Pool barrier must be inspected and approved per Local Additions and Addenda Section 3109 and pool barrier requirements BEFORE the pool is plastered or filled with water
- 3
Final
All work complete; pool filled; equipment operational; barrier fully in place
Applies to: Solar PV Permit (Roof-Mounted and Ground-Mounted Photovoltaic)
- 1
Roof-mounted: Building Inspection
Included in flat-fee permit; scheduled through Permit Center. Verify installation per approved plans and 2017 NEC.
- 1
Ground-mounted: Pre-issuance / Upfront Inspection
Included in flat-fee permit for ground-mounted systems under 6 feet. Additional inspections may be required depending on site drainage conditions.
- 2
Final
System fully installed and operational; all wiring complete per 2017 NEC; utility interconnection verified
Applies to: Electrical Permit
- 1
Rough-In / Service Inspection
After wiring installed before wall cover; or service equipment installed before energizing
- 2
Final
All electrical work complete and operational per 2017 NEC
Applies to: EV Charger / EVSE Permit
- 1
Rough-In / Service Inspection
EVSE circuit and panel/service work inspected before wall cover or energizing, per adopted 2017 NEC
- 2
Final
EVSE equipment mounting, bonding/grounding, and operation complete
Applies to: Fence / Block Wall Permit
- 1
Footing Inspection
Before concrete pour for block wall footings — verify depth and dimensions per county fence detail standards
- 2
Final
Wall or fence fully constructed per approved plans and county fence details
Applies to: Mechanical / HVAC Permit
- 1
Rough-In / Equipment
Equipment installed and ductwork complete before wall cover or concealment per 2018 IMC
- 2
Final
Equipment operational; combustion air and venting verified per 2018 IMC/IFGC
Applies to: Plumbing Permit
- 1
Gas Piping Pressure Test
Required before concealing gas piping — verify no leaks under test pressure per 2018 IFGC
- 2
Final Plumbing
All plumbing work complete and operational per 2018 IPC/IFGC
Final inspection only: Demolition Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Maricopa County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Maricopa County building permits
Get alerts for Unincorporated Maricopa County
We'll email you when Unincorporated Maricopa County's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.