Solar PV Permit (Roof-Mounted and Ground-Mounted Photovoltaic) in Unincorporated Maricopa County, Arizona

Required for residential photovoltaic (solar PV) system installations in the unincorporated areas of Maricopa County. Two distinct permit types apply: roof-mounted PV systems (minor residential electrical permit, flat fee of $300) and ground-mounted PV systems under 6 feet high (minor residential permit, flat fee of $500). Ground-mounted systems over 6 feet high are treated as accessory structures and have higher upfront fees. All applications submitted through Permit Center online.

Verified 2026-06-29 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Roof-mounted residential solar PV (all-in flat fee)$300 totalPer Section 208 of the Maricopa County Local Additions and Addenda. Includes all administrative, building plan review, and building inspection fees. Payment due upon acceptance. Source: https://www.maricopa.gov/1923/Go-Solar-for-Residential-Service and Local Additions and Addenda Section 208.
Ground-mounted residential solar PV less than 6 feet high (all-in flat fee)$500 totalPer Local Additions and Addenda Section 208 and Maricopa County Zoning Ordinance Section 1602.1. Includes all administrative, zoning, building plan review, and building upfront inspection fees. Additional drainage fees may apply depending on site-specific engineering requirements. Source: https://www.maricopa.gov/1923/Go-Solar-for-Residential-Service
Ground-mounted residential solar PV over 6 feet high (accessory structure)$110 upfront plus additional review fees assessed during plan reviewSystem over 6 feet is treated as a residential accessory structure. Source: https://www.maricopa.gov/1923/Go-Solar-for-Residential-Service

Review timeline

~110 business days

Typical estimate — confirm current times with the Unincorporated Maricopa County building department

Inspection process

  1. 1

    Roof-mounted: Building Inspection

    Included in flat-fee permit; scheduled through Permit Center. Verify installation per approved plans and 2017 NEC.

  2. 1

    Ground-mounted: Pre-issuance / Upfront Inspection

    Included in flat-fee permit for ground-mounted systems under 6 feet. Additional inspections may be required depending on site drainage conditions.

  3. 2

    Final

    System fully installed and operational; all wiring complete per 2017 NEC; utility interconnection verified

Tips

Frequently asked questions

What is the permit fee for rooftop solar in unincorporated Maricopa County?
$300 flat fee, all-inclusive (covers all administrative, plan review, and inspection fees). This is set by Section 208 of the Maricopa County Local Additions and Addenda. Apply at https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice. Source: https://www.maricopa.gov/1923/Go-Solar-for-Residential-Service

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Maricopa County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Unincorporated Maricopa County

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.