This is PermitBase’s published record for Holbrook as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Holbrook building permits

Verified

Holbrook, Arizona — as published 2026-07-06.

Verified 2026-07-06 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Holbrook runs its own Building Department, independent of Navajo County, and issues its own construction permits within city limits. Source: City of Holbrook Building Department page (holbrookaz.gov/departments/building-department/).The City of Holbrook's own published Fee Schedule (effective September 1, 2025) states that Building Permit Fees (Commercial/Residential/New/Remodel/Accessory Building) and the Residential Solar System Fee are calculated 'based on IBC/UBC Building Data-IRC 2018 Charts and Formulas,' confirming the 2018 edition of the ICC family of codes (International Building Code / International Residential Code) is the City's current operative code basis for permit valuation as of the fee schedule's effective date. Source: City of Holbrook Fee Schedule, effective September 1, 2025 (Section 2-1, Section 2-3).The City's Chapter 5 (Building and Construction) of the Holbrook City Code, hosted on Municode Library, is the presumed formal adoption vehicle for the specific ICC code titles (IBC, IRC, IMC, IPC, IFGC, NEC) and any local amendments, but the underlying ordinance text could not be directly retrieved: Municode's platform is a JavaScript single-page application that returns only an empty page shell to automated/non-browser HTTP requests (repeatedly confirmed via direct fetch and via a realistic desktop browser User-Agent), its authenticated content API returned HTTP 401 to unauthenticated requests, and no Wayback Machine snapshot of the rendered chapter (nodeId=CH5BUCO) exists. The City's own live codification history shows the most recent full recodification was Ordinance No. 25-09 (enacted December 10, 2025), with subsequently identified amendments limited to Chapter 6 (Planning and Zoning) and Chapter 3 (Public Health and Safety/animal control) — no Chapter 5 (Building and Construction) amendment was identified in that update cycle, consistent with the Fee Schedule's 2018 IRC reference remaining current through at least September 2025. Source: Holbrook, AZ Municode Library index (library.municode.com/az/holbrook/codes/city_code) and City of Holbrook City Code page (holbrookaz.gov/government/city-code/).Because the specific IBC/IRC/IMC/IPC/IFGC/NEC edition years and any City-specific local amendments (climatic/geographic design criteria, wind speed, seismic design category, mandatory-AC-style provisions, permit exemptions, etc.) could not be independently confirmed beyond the Fee Schedule's '2018 IRC' reference, this file does not assert specific section-by-section code adoption citations of the kind available for larger Arizona cities with fully browser-accessible ordinance text (e.g., Buckeye). As of July 2026, the City of Holbrook does not appear to publish a standalone 'Building and Life Safety Codes Update' document of the kind larger cities publish; the only verifiable, City-sourced statement of code edition is the Fee Schedule's 2018 IRC/IBC reference. For binding, section-level code text, contact the Building Department directly at 928-524-6225 or rtissaw@holbrookaz.gov, or consult the Holbrook City Code, Chapter 5 (Building and Construction) directly via library.municode.com/az/holbrook/codes/city_code?nodeId=CH5BUCO using a JavaScript-capable browser.Manufactured homes, mobile homes, and factory-built buildings are regulated directly by the State of Arizona (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing) for construction/installation standards; the City of Holbrook's own building permit process governs on-site placement, foundation/tie-down, and zoning compliance, consistent with statewide practice for Arizona home-rule municipalities. Source: Arizona Department of Fire, Building and Life Safety Office of Manufactured Housing statutory authority (A.R.S. § 41-4001 et seq.); City of Holbrook Building Department confirms it issues its own local permits independent of the County.

Permit types & fees

Residential Building Permit (New Construction / Remodel / Accessory Building)

Verified

Required for new single-family residential construction, remodels, and accessory buildings in the City of Holbrook. Building Permit Fees are calculated based on IBC/UBC Building Data-IRC 2018 Charts and Formulas per the City's own Fee Schedule (effective September 1, 2025). Permits are issued through the Building Department and are valid for 6 months.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new construction, remodels, and accessory buildings (Commercial and Residential) within Holbrook city limits
  • Permit fee is calculated using IBC/UBC Building Data-IRC 2018 valuation charts and formulas, per the City's Fee Schedule
  • Permits are valid for 6 months from issuance; a Permit Renewal ($20) is required every 6 months prior to expiration to keep an in-progress permit active
  • If a permit is allowed to expire without renewal, a Permit Reactivation fee of 10% of the original permit fee applies
  • A $100 Plan Review Fee applies at submittal and is credited back toward the final permit purchase price
  • A Certificate of Occupancy ($50) is required for new residential or commercial construction before occupancy
  • Apply via the City's online GOGov permit and licensing platform (app.govoutreach.com/holbrookcityaz/public/permits) or directly through the Building Department at City Hall

Required documents

  • RequiredBuilding Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall, 465 1st Avenue, Holbrook, AZ 86025
  • RequiredSite/Plot PlanLot dimensions and structure location, per standard Building Department submittal practice
  • RequiredConstruction DrawingsPlans sufficient to support IBC/UBC/IRC 2018 valuation-based fee calculation and plan review

Fee schedule

Fee typeAmountNotes
Building Permit Fee (Commercial/Residential/New/Remodel/Accessory Building)Based on IBC/UBC Building Data-IRC 2018 valuation charts and formulas (valuation-based; no flat dollar figure published)City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-1
Plan Review Fee$100 (credited back toward permit purchase)City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-6
Certificate of Occupancy (New Residential/Commercial)$50City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-7
Permit Renewal (every 6 months prior to expiration)$20City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-4
Permit Reactivation (if permit has expired)10% of the original permit feeCity of Holbrook Fee Schedule, effective September 1, 2025, Section 2-5
Inspection (if no fee specifically indicated) / Re-Inspection$75 per inspection / $75 per re-inspectionCity of Holbrook Fee Schedule, effective September 1, 2025, Section 2-8

Certificate of Occupancy

Verified

Required before occupying newly constructed residential or commercial buildings in the City of Holbrook, following a final building inspection. Priced as its own dedicated line item, separate from the underlying Building Permit Fee, in the City's Fee Schedule.

Verified 2026-07-06 · Source

Requirements

  • Certificate of Occupancy required for new residential or commercial construction before the building may be occupied
  • Issued following a passing final inspection under the associated Building Permit
  • Apply/request via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall

Required documents

  • RequiredCertificate of Occupancy RequestRequested through the Building Department once final inspection has passed for the associated building permit

Fee schedule

Fee typeAmountNotes
Certificate of Occupancy (New Residential/Commercial)$50City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-7

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in the City of Holbrook, including panel upgrades and meter loop installations. Flat-fee permit types with inspection included.

Verified 2026-07-06 · Source

Requirements

  • Electrical permit required for electrical installation, alteration, or repair work within Holbrook city limits
  • Panel upgrades require a Panel Upgrade/Inspection permit
  • Meter Loop installations require a separate Meter Loop permit
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall

Required documents

  • RequiredElectrical Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall

Fee schedule

Fee typeAmountNotes
Electric Permit (inspection included)$50City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-2
Panel Upgrade/Inspection$75City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-14
Meter Loop (for installation)$50City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-9
Re-Inspection (if applicable)$75 per re-inspectionCity of Holbrook Fee Schedule, effective September 1, 2025, Section 2-8

Gas Permit / Gas Line Inspection

Verified

Required for gas piping and gas line installation work in the City of Holbrook. Flat-fee permit with inspection included for the base gas permit, plus a dedicated Gas Line Inspection fee for installation-specific inspections.

Verified 2026-07-06 · Source

Requirements

  • Gas permit required for gas piping installation, alteration, or repair within Holbrook city limits
  • A separate Gas Line Inspection fee applies specifically for gas line installation inspections
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall

Required documents

  • RequiredGas Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall

Fee schedule

Fee typeAmountNotes
Gas Permit (inspection included)$50City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-2
Gas Line Inspection (for installation)$50City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-12
Re-Inspection (if applicable)$75 per re-inspectionCity of Holbrook Fee Schedule, effective September 1, 2025, Section 2-8

Residential Solar System Permit

Verified

Required for residential solar photovoltaic system installation in the City of Holbrook. The fee is calculated using the same IBC/UBC Building Data-IRC 2018 valuation charts and formulas used for general building permits, rather than a flat dollar figure.

Verified 2026-07-06 · Source

Requirements

  • Solar System Fee applies to residential solar installations within Holbrook city limits
  • Fee is calculated based on IBC/UBC Building Data-IRC 2018 valuation charts and formulas (same methodology as the general Building Permit Fee)
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall

Required documents

  • RequiredSolar/Building Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall
  • RequiredSolar System PlansPanel layout, racking, and electrical interconnection details sufficient to support valuation-based fee calculation and inspection

Fee schedule

Fee typeAmountNotes
Solar System Fee (Residential Installation)Based on IBC/UBC Building Data-IRC 2018 valuation charts and formulas (valuation-based; no flat dollar figure published)City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-3
Plan Review Fee$100 (credited back toward permit purchase)City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-6

Fence Permit

Verified

Required for residential and commercial fence installation in the City of Holbrook. Flat-fee permit.

Verified 2026-07-06 · Source

Requirements

  • Fence permit required for residential or commercial fence installation within Holbrook city limits
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall

Required documents

  • RequiredFence Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall

Fee schedule

Fee typeAmountNotes
Residential/Commercial Fence Permit$25City of Holbrook Fee Schedule, effective September 1, 2025, Section 2-10

Sign Permit

Verified

Required for commercial sign installation in the City of Holbrook. Fee is a base charge plus a per-square-foot rate, and includes two inspections. Existing signs already in place receive a 1-year waiver.

Verified 2026-07-06 · Source

Requirements

  • Sign permit required for commercial sign installation within Holbrook city limits
  • Existing signs have a 1-year waiver from the permit requirement per the Fee Schedule
  • Includes 2 inspections in the base fee
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall; a dedicated Sign Permit application form is also linked from the Building Department page

Required documents

  • RequiredSign Permit ApplicationCity of Holbrook Sign Permit application, linked from the Building Department page, or submitted through the GOGov online platform

Fee schedule

Fee typeAmountNotes
Commercial Sign Permit$50 + $1.50 per square footCity of Holbrook Fee Schedule, effective September 1, 2025, Section 2-11; includes 2 inspections. Existing signs have a 1-year waiver.

Zone Change / Conditional Use / Variance Permit

Verified

Planning & Zoning applications required for zone changes, conditional use permits, and variances in the City of Holbrook. Distinct from the Building Department's construction permits, these are Planning & Zoning fee categories with dedicated application forms linked from the Building Department page.

Verified 2026-07-06 · Source

Requirements

  • Zone Change Permit required for rezoning applications within Holbrook city limits
  • Conditional Use Permit required for uses requiring discretionary Planning & Zoning approval
  • Variance Permit required for relief from zoning ordinance standards
  • Dedicated application forms for Conditional Use Permit, Variance Permit, and Zone Change Permit are linked directly from the City's Building Department page
  • A Copy of the Zoning Ordinance can be purchased separately for $10

Required documents

  • RequiredConditional Use Permit ApplicationCity of Holbrook application form, linked from the Building Department page
  • RequiredVariance Permit ApplicationCity of Holbrook application form, linked from the Building Department page
  • RequiredZone Change Permit ApplicationCity of Holbrook application form, linked from the Building Department page

Fee schedule

Fee typeAmountNotes
Zone Change$250City of Holbrook Fee Schedule, effective September 1, 2025, Section 3-1
Conditional Use Permit$150City of Holbrook Fee Schedule, effective September 1, 2025, Section 3-2
Variance Permit$250City of Holbrook Fee Schedule, effective September 1, 2025, Section 3-3
Copy of a Zoning Ordinance$10City of Holbrook Fee Schedule, effective September 1, 2025, Section 3-4

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holbrook building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-07) →View current record →All versions →