Holbrook building permits

Verified

Holbrook, Arizona — as published 2026-07-07.

Verified 2026-07-23 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Holbrook runs its own Building Department, independent of Navajo County, and issues its own construction permits within city limits. Source: City of Holbrook Building Department page (holbrookaz.gov/departments/building-department/).The City of Holbrook's own published Fee Schedule (adopted November 15, 2025, superseding the September 1, 2025 edition; figures unchanged between the two) states that Building Permit Fees (Commercial/Residential/New/Remodel/Accessory Building) and the Residential Solar System Fee are calculated 'based on IBC/UBC Building Data-IRC 2018 Charts and Formulas,' confirming the 2018 edition of the ICC family of codes (International Building Code / International Residential Code) is the City's current operative code basis for permit valuation. Source: City of Holbrook Fee Schedule, adopted November 15, 2025 (Section 2-1, Section 2-3).CONFIRMED 2026-07-23 via live-rendered Municode session (the platform is a JavaScript SPA that returns an empty shell to non-browser requests, but renders fully in a real browser): Holbrook City Code Chapter 5 (Building and Construction), Article 5-2 'Uniform Codes,' was repealed and re-enacted in its entirety by Ordinance No. 25-01, § 1 (adopted January 22, 2025) — replacing the former Art. 5-2 (§§ 5-2-1—5-2-13), which had derived from Ordinance 10-11, Ordinance 11-11, and Ord. No. 24-03, § 1 (adopted May 22, 2024). As codified (Supp. No. 2, Update 1, online content updated February 19, 2026; codified through Ordinance No. 25-09, enacted December 10, 2025), Article 5-2 adopts by reference: § 5-2-1 the 1997 Uniform Code for the Abatement of Dangerous Buildings; § 5-2-2 the 2018 International Building Code (IBC), including Appendix J (Grading) and Appendix K (Administrative Provisions — Mechanisms for Enforcement of NFPA 70 National Electrical Code); § 5-2-3 the 1997 Uniform Code for Building Conservation; § 5-2-4 the 2017 edition of the National Electrical Code (NOT 2018 — this is the one code title in the chapter on an older edition year than the rest); § 5-2-5 the 2018 edition of the NFPA Fire Code; § 5-2-6 the 2018 International Fuel Gas Code (IFGC); § 5-2-7 the 2018 International Mechanical Code (IMC); § 5-2-8 the 2018 International Residential Plumbing Code (the codified section title, verbatim); and § 5-2-9 the 2018 International Residential Code (IRC), including Appendices A, B, G, H, J, L, M, P, and Q. Chapter 5 also contains Article 5-1 'Permits and Fees' (§ 5-1-1: a building/construction permit is required whenever the cost of construction, remodeling, or improvement exceeds $1,000, excepting floor/wall-covering replacement, window replacement, roofing, and painting — Ordinance 10-11; § 5-1-4: permit fees are set from time to time by council resolution, i.e. the Fee Schedule) and Article 5-3 'Drainage and Retention Criteria' (stormwater/grading design criteria, unrelated to permit fees or code editions). No climatic/geographic design-criteria table (wind speed, seismic design category, etc.) or plan-review turnaround-time language exists anywhere in Chapter 5's text. Ordinances subsequent to 25-09 (No. 26-01 and No. 26-02, both adopted May 13, 2026) amend Chapter 6 and Chapter 3 respectively — neither touches Chapter 5, so the code editions above remain the most current. Source: Holbrook, AZ Municode Library, Chapter 5 — Building and Construction (library.municode.com/az/holbrook/codes/city_code?nodeId=CH5BUCO), live-rendered 2026-07-23.Manufactured homes, mobile homes, and factory-built buildings are regulated directly by the State of Arizona (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing) for construction/installation standards; the City of Holbrook's own building permit process governs on-site placement, foundation/tie-down, and zoning compliance, consistent with statewide practice for Arizona home-rule municipalities. Source: Arizona Department of Fire, Building and Life Safety Office of Manufactured Housing statutory authority (A.R.S. § 41-4001 et seq.); City of Holbrook Building Department confirms it issues its own local permits independent of the County.

Permit types & fees

Residential Building Permit (New Construction / Remodel / Accessory Building)

Verified

Required for new single-family residential construction, remodels, and accessory buildings in the City of Holbrook. Building Permit Fees are calculated based on IBC/UBC Building Data-IRC 2018 Charts and Formulas per the City's own Fee Schedule (adopted November 15, 2025). Permits are issued through the Building Department and are valid for 6 months.

Verified 2026-07-23 · Source

Requirements

  • Building permit required for new construction, remodels, and accessory buildings (Commercial and Residential) within Holbrook city limits
  • Permit fee is calculated using IBC/UBC Building Data-IRC 2018 valuation charts and formulas, per the City's Fee Schedule
  • Permits are valid for 6 months from issuance; a Permit Renewal ($20) is required every 6 months prior to expiration to keep an in-progress permit active
  • If a permit is allowed to expire without renewal, a Permit Reactivation fee of 10% of the original permit fee applies
  • A $100 Plan Review Fee applies at submittal and is credited back toward the final permit purchase price
  • A Certificate of Occupancy ($50) is required for new residential or commercial construction before occupancy
  • Apply via the City's online GOGov permit and licensing platform (app.govoutreach.com/holbrookcityaz/public/permits) or directly through the Building Department at City Hall

Required documents

  • RequiredBuilding Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall, 465 1st Avenue, Holbrook, AZ 86025
  • RequiredSite/Plot PlanLot dimensions and structure location, per standard Building Department submittal practice
  • RequiredConstruction DrawingsPlans sufficient to support IBC/UBC/IRC 2018 valuation-based fee calculation and plan review

Fee schedule

Fee typeAmountNotes
Building Permit Fee (Commercial/Residential/New/Remodel/Accessory Building)Based on IBC/UBC Building Data-IRC 2018 valuation charts and formulas (valuation-based; no flat dollar figure published)City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-1
Plan Review Fee$100 (credited back toward permit purchase)City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-6
Certificate of Occupancy (New Residential/Commercial)$50City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-7
Permit Renewal (every 6 months prior to expiration)$20City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-4
Permit Reactivation (if permit has expired)10% of the original permit feeCity of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-5
Inspection (if no fee specifically indicated) / Re-Inspection$75 per inspection / $75 per re-inspectionCity of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-8

Certificate of Occupancy

Verified

Required before occupying newly constructed residential or commercial buildings in the City of Holbrook, following a final building inspection. Priced as its own dedicated line item, separate from the underlying Building Permit Fee, in the City's Fee Schedule.

Verified 2026-07-23 · Source

Requirements

  • Certificate of Occupancy required for new residential or commercial construction before the building may be occupied
  • Issued following a passing final inspection under the associated Building Permit
  • Apply/request via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall

Required documents

  • RequiredCertificate of Occupancy RequestRequested through the Building Department once final inspection has passed for the associated building permit

Fee schedule

Fee typeAmountNotes
Certificate of Occupancy (New Residential/Commercial)$50City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-7

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in the City of Holbrook, including panel upgrades and meter loop installations. Flat-fee permit types with inspection included.

Verified 2026-07-23 · Source

Requirements

  • Electrical permit required for electrical installation, alteration, or repair work within Holbrook city limits
  • Panel upgrades require a Panel Upgrade/Inspection permit
  • Meter Loop installations require a separate Meter Loop permit
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall

Required documents

  • RequiredElectrical Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall

Fee schedule

Fee typeAmountNotes
Electric Permit (inspection included)$50City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-2
Panel Upgrade/Inspection$75City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-14
Meter Loop (for installation)$50City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-9
Re-Inspection (if applicable)$75 per re-inspectionCity of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-8

Gas Permit / Gas Line Inspection

Verified

Required for gas piping and gas line installation work in the City of Holbrook. Flat-fee permit with inspection included for the base gas permit, plus a dedicated Gas Line Inspection fee for installation-specific inspections.

Verified 2026-07-23 · Source

Requirements

  • Gas permit required for gas piping installation, alteration, or repair within Holbrook city limits
  • A separate Gas Line Inspection fee applies specifically for gas line installation inspections
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall

Required documents

  • RequiredGas Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall

Fee schedule

Fee typeAmountNotes
Gas Permit (inspection included)$50City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-2
Gas Line Inspection (for installation)$50City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-12
Re-Inspection (if applicable)$75 per re-inspectionCity of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-8

Residential Solar System Permit

Verified

Required for residential solar photovoltaic system installation in the City of Holbrook. The fee is calculated using the same IBC/UBC Building Data-IRC 2018 valuation charts and formulas used for general building permits, rather than a flat dollar figure.

Verified 2026-07-23 · Source

Requirements

  • Solar System Fee applies to residential solar installations within Holbrook city limits
  • Fee is calculated based on IBC/UBC Building Data-IRC 2018 valuation charts and formulas (same methodology as the general Building Permit Fee)
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall

Required documents

  • RequiredSolar/Building Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall
  • RequiredSolar System PlansPanel layout, racking, and electrical interconnection details sufficient to support valuation-based fee calculation and inspection

Fee schedule

Fee typeAmountNotes
Solar System Fee (Residential Installation)Based on IBC/UBC Building Data-IRC 2018 valuation charts and formulas (valuation-based; no flat dollar figure published)City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-3
Plan Review Fee$100 (credited back toward permit purchase)City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-6

Fence Permit

Verified

Required for residential and commercial fence installation in the City of Holbrook. Flat-fee permit.

Verified 2026-07-23 · Source

Requirements

  • Fence permit required for residential or commercial fence installation within Holbrook city limits
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall

Required documents

  • RequiredFence Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall

Fee schedule

Fee typeAmountNotes
Residential/Commercial Fence Permit$25City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-10

Sign Permit

Verified

Required for commercial sign installation in the City of Holbrook. Fee is a base charge plus a per-square-foot rate, and includes two inspections. Existing signs already in place receive a 1-year waiver.

Verified 2026-07-23 · Source

Requirements

  • Sign permit required for commercial sign installation within Holbrook city limits
  • Existing signs have a 1-year waiver from the permit requirement per the Fee Schedule
  • Includes 2 inspections in the base fee
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall; a dedicated Sign Permit application form is also linked from the Building Department page

Required documents

  • RequiredSign Permit ApplicationCity of Holbrook Sign Permit application, linked from the Building Department page, or submitted through the GOGov online platform

Fee schedule

Fee typeAmountNotes
Commercial Sign Permit$50 + $1.50 per square footCity of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-11; includes 2 inspections. Existing signs have a 1-year waiver.

Zone Change / Conditional Use / Variance Permit

Verified

Planning & Zoning applications required for zone changes, conditional use permits, and variances in the City of Holbrook. Distinct from the Building Department's construction permits, these are Planning & Zoning fee categories with dedicated application forms linked from the Building Department page.

Verified 2026-07-23 · Source

Requirements

  • Zone Change Permit required for rezoning applications within Holbrook city limits
  • Conditional Use Permit required for uses requiring discretionary Planning & Zoning approval
  • Variance Permit required for relief from zoning ordinance standards
  • Dedicated application forms for Conditional Use Permit, Variance Permit, and Zone Change Permit are linked directly from the City's Building Department page
  • A Copy of the Zoning Ordinance can be purchased separately for $10

Required documents

  • RequiredConditional Use Permit ApplicationCity of Holbrook application form, linked from the Building Department page
  • RequiredVariance Permit ApplicationCity of Holbrook application form, linked from the Building Department page
  • RequiredZone Change Permit ApplicationCity of Holbrook application form, linked from the Building Department page

Fee schedule

Fee typeAmountNotes
Zone Change$250City of Holbrook Fee Schedule, adopted November 15, 2025, Section 3-1
Conditional Use Permit$150City of Holbrook Fee Schedule, adopted November 15, 2025, Section 3-2
Variance Permit$250City of Holbrook Fee Schedule, adopted November 15, 2025, Section 3-3
Copy of a Zoning Ordinance$10City of Holbrook Fee Schedule, adopted November 15, 2025, Section 3-4

EV Charger / EVSE Permit

Verified

Holbrook has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. A home or business EV charger circuit is billed under the City's standard flat-fee Electric Permit (inspection included) -- the same $50 permit used for any other electrical installation, alteration, or repair. If the circuit requires a panel upgrade to support the charger's load, the separate flat Panel Upgrade/Inspection fee applies instead.

Verified 2026-07-23 · Source

Requirements

  • Electric Permit required for EV charger circuit installation within Holbrook city limits
  • No EV/EVSE-specific fee line exists on the City's Fee Schedule -- billed under the standard $50 Electric Permit (inspection included)
  • If a panel upgrade is needed to support the charger's amperage draw, the separate Panel Upgrade/Inspection fee applies instead of (or in addition to) the base Electric Permit
  • Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall

Required documents

  • RequiredElectrical Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall; no EV-specific line item, described in the scope of work

Fee schedule

Fee typeAmountNotes
Electric Permit (inspection included) -- applies to a standard EV charger circuit$50City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-2 -- no dedicated EV/EVSE line item exists; billed under the same flat fee used for any other electrical installation
Panel Upgrade/Inspection (if the charger install requires a panel upgrade)$75City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-14

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holbrook building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →