Holbrook building permits
VerifiedHolbrook, Arizona — as published 2026-07-07.
Verified 2026-07-23 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Remodel / Accessory Building)
VerifiedRequired for new single-family residential construction, remodels, and accessory buildings in the City of Holbrook. Building Permit Fees are calculated based on IBC/UBC Building Data-IRC 2018 Charts and Formulas per the City's own Fee Schedule (adopted November 15, 2025). Permits are issued through the Building Department and are valid for 6 months.
Verified 2026-07-23 · Source
Requirements
- Building permit required for new construction, remodels, and accessory buildings (Commercial and Residential) within Holbrook city limits
- Permit fee is calculated using IBC/UBC Building Data-IRC 2018 valuation charts and formulas, per the City's Fee Schedule
- Permits are valid for 6 months from issuance; a Permit Renewal ($20) is required every 6 months prior to expiration to keep an in-progress permit active
- If a permit is allowed to expire without renewal, a Permit Reactivation fee of 10% of the original permit fee applies
- A $100 Plan Review Fee applies at submittal and is credited back toward the final permit purchase price
- A Certificate of Occupancy ($50) is required for new residential or commercial construction before occupancy
- Apply via the City's online GOGov permit and licensing platform (app.govoutreach.com/holbrookcityaz/public/permits) or directly through the Building Department at City Hall
Required documents
- RequiredBuilding Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall, 465 1st Avenue, Holbrook, AZ 86025
- RequiredSite/Plot PlanLot dimensions and structure location, per standard Building Department submittal practice
- RequiredConstruction DrawingsPlans sufficient to support IBC/UBC/IRC 2018 valuation-based fee calculation and plan review
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Commercial/Residential/New/Remodel/Accessory Building) | Based on IBC/UBC Building Data-IRC 2018 valuation charts and formulas (valuation-based; no flat dollar figure published) | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-1 |
| Plan Review Fee | $100 (credited back toward permit purchase) | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-6 |
| Certificate of Occupancy (New Residential/Commercial) | $50 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-7 |
| Permit Renewal (every 6 months prior to expiration) | $20 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-4 |
| Permit Reactivation (if permit has expired) | 10% of the original permit fee | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-5 |
| Inspection (if no fee specifically indicated) / Re-Inspection | $75 per inspection / $75 per re-inspection | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-8 |
Certificate of Occupancy
VerifiedRequired before occupying newly constructed residential or commercial buildings in the City of Holbrook, following a final building inspection. Priced as its own dedicated line item, separate from the underlying Building Permit Fee, in the City's Fee Schedule.
Verified 2026-07-23 · Source
Requirements
- Certificate of Occupancy required for new residential or commercial construction before the building may be occupied
- Issued following a passing final inspection under the associated Building Permit
- Apply/request via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall
Required documents
- RequiredCertificate of Occupancy RequestRequested through the Building Department once final inspection has passed for the associated building permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Certificate of Occupancy (New Residential/Commercial) | $50 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-7 |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in the City of Holbrook, including panel upgrades and meter loop installations. Flat-fee permit types with inspection included.
Verified 2026-07-23 · Source
Requirements
- Electrical permit required for electrical installation, alteration, or repair work within Holbrook city limits
- Panel upgrades require a Panel Upgrade/Inspection permit
- Meter Loop installations require a separate Meter Loop permit
- Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall
Required documents
- RequiredElectrical Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electric Permit (inspection included) | $50 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-2 |
| Panel Upgrade/Inspection | $75 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-14 |
| Meter Loop (for installation) | $50 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-9 |
| Re-Inspection (if applicable) | $75 per re-inspection | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-8 |
Gas Permit / Gas Line Inspection
VerifiedRequired for gas piping and gas line installation work in the City of Holbrook. Flat-fee permit with inspection included for the base gas permit, plus a dedicated Gas Line Inspection fee for installation-specific inspections.
Verified 2026-07-23 · Source
Requirements
- Gas permit required for gas piping installation, alteration, or repair within Holbrook city limits
- A separate Gas Line Inspection fee applies specifically for gas line installation inspections
- Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall
Required documents
- RequiredGas Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Gas Permit (inspection included) | $50 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-2 |
| Gas Line Inspection (for installation) | $50 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-12 |
| Re-Inspection (if applicable) | $75 per re-inspection | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-8 |
Residential Solar System Permit
VerifiedRequired for residential solar photovoltaic system installation in the City of Holbrook. The fee is calculated using the same IBC/UBC Building Data-IRC 2018 valuation charts and formulas used for general building permits, rather than a flat dollar figure.
Verified 2026-07-23 · Source
Requirements
- Solar System Fee applies to residential solar installations within Holbrook city limits
- Fee is calculated based on IBC/UBC Building Data-IRC 2018 valuation charts and formulas (same methodology as the general Building Permit Fee)
- Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall
Required documents
- RequiredSolar/Building Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall
- RequiredSolar System PlansPanel layout, racking, and electrical interconnection details sufficient to support valuation-based fee calculation and inspection
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar System Fee (Residential Installation) | Based on IBC/UBC Building Data-IRC 2018 valuation charts and formulas (valuation-based; no flat dollar figure published) | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-3 |
| Plan Review Fee | $100 (credited back toward permit purchase) | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-6 |
Fence Permit
VerifiedRequired for residential and commercial fence installation in the City of Holbrook. Flat-fee permit.
Verified 2026-07-23 · Source
Requirements
- Fence permit required for residential or commercial fence installation within Holbrook city limits
- Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall
Required documents
- RequiredFence Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential/Commercial Fence Permit | $25 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-10 |
Sign Permit
VerifiedRequired for commercial sign installation in the City of Holbrook. Fee is a base charge plus a per-square-foot rate, and includes two inspections. Existing signs already in place receive a 1-year waiver.
Verified 2026-07-23 · Source
Requirements
- Sign permit required for commercial sign installation within Holbrook city limits
- Existing signs have a 1-year waiver from the permit requirement per the Fee Schedule
- Includes 2 inspections in the base fee
- Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall; a dedicated Sign Permit application form is also linked from the Building Department page
Required documents
- RequiredSign Permit ApplicationCity of Holbrook Sign Permit application, linked from the Building Department page, or submitted through the GOGov online platform
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Commercial Sign Permit | $50 + $1.50 per square foot | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-11; includes 2 inspections. Existing signs have a 1-year waiver. |
Zone Change / Conditional Use / Variance Permit
VerifiedPlanning & Zoning applications required for zone changes, conditional use permits, and variances in the City of Holbrook. Distinct from the Building Department's construction permits, these are Planning & Zoning fee categories with dedicated application forms linked from the Building Department page.
Verified 2026-07-23 · Source
Requirements
- Zone Change Permit required for rezoning applications within Holbrook city limits
- Conditional Use Permit required for uses requiring discretionary Planning & Zoning approval
- Variance Permit required for relief from zoning ordinance standards
- Dedicated application forms for Conditional Use Permit, Variance Permit, and Zone Change Permit are linked directly from the City's Building Department page
- A Copy of the Zoning Ordinance can be purchased separately for $10
Required documents
- RequiredConditional Use Permit ApplicationCity of Holbrook application form, linked from the Building Department page
- RequiredVariance Permit ApplicationCity of Holbrook application form, linked from the Building Department page
- RequiredZone Change Permit ApplicationCity of Holbrook application form, linked from the Building Department page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Zone Change | $250 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 3-1 |
| Conditional Use Permit | $150 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 3-2 |
| Variance Permit | $250 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 3-3 |
| Copy of a Zoning Ordinance | $10 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 3-4 |
EV Charger / EVSE Permit
VerifiedHolbrook has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. A home or business EV charger circuit is billed under the City's standard flat-fee Electric Permit (inspection included) -- the same $50 permit used for any other electrical installation, alteration, or repair. If the circuit requires a panel upgrade to support the charger's load, the separate flat Panel Upgrade/Inspection fee applies instead.
Verified 2026-07-23 · Source
Requirements
- Electric Permit required for EV charger circuit installation within Holbrook city limits
- No EV/EVSE-specific fee line exists on the City's Fee Schedule -- billed under the standard $50 Electric Permit (inspection included)
- If a panel upgrade is needed to support the charger's amperage draw, the separate Panel Upgrade/Inspection fee applies instead of (or in addition to) the base Electric Permit
- Apply via the City's online GOGov permit and licensing platform or directly through the Building Department at City Hall
Required documents
- RequiredElectrical Permit ApplicationSubmitted through the City's online GOGov permit and licensing platform, or in person at City Hall; no EV-specific line item, described in the scope of work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electric Permit (inspection included) -- applies to a standard EV charger circuit | $50 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-2 -- no dedicated EV/EVSE line item exists; billed under the same flat fee used for any other electrical installation |
| Panel Upgrade/Inspection (if the charger install requires a panel upgrade) | $75 | City of Holbrook Fee Schedule, adopted November 15, 2025, Section 2-14 |
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holbrook building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.