Fire Sprinkler & Fire Alarm Permit (Fire Construction Permit) in Tucson, Arizona

Tucson Fire Department (TFD) issues Fire Construction Permits for fire sprinkler systems, fire alarm systems, automatic extinguishing systems, fire pumps, standpipes, hood suppression and above-ground and underground storage tanks. The City of Tucson has adopted the 2024 International Fire Code effective September 1, 2024, with local amendments, and TFD requires plan submittals to meet the 2022 editions of NFPA 13, 13D, 13R and 72. Applications are made through Tucson Development Center (TDC) Online, the same portal used for building permits. Fire construction permit fees are set in the City's unified Planning and Permitting Fee Schedule under Section 4-06 FIRE — the City's own guidance states plainly that 'fire specific fees are found under Section 4-06.1.0 FIRE' of the fee schedule — and most fire permit fees are expressed in staff hours rather than flat dollars, charged at the adopted Standard Hourly Rate. Separately from these construction permits, TFD charges a percentage-of-building-permit fire review and fire inspection fee on commercial building permits.

Verified 2026-08-15 · Source

When you need this permit

  • The City of Tucson has adopted the 2024 International Fire Code effective September 1, 2024, with City of Tucson amendments (Tucson Fire Department, Get Fire Permits and Fire Code Info page)
  • Plan submittals shall meet the requirements of the 2022 NFPA 13, 13D, 13R, and 72 Standards (Tucson Fire Department, Get Fire Permits and Fire Code Info page, Updated Requirements)
  • Fire construction permits are applied for through Tucson Development Center Online at tdc-online.tucsonaz.gov
  • A separate Fire Construction Permit is required for each system type: fire sprinkler system (new), underground fire line supply, fire sprinkler system modification, 13D sprinklers, standpipe or in-rack storage systems, commercial fire pumps and related equipment, building fire alarm system (new), dedicated function fire alarm system (new), fire alarm system modification, and fire protection system monitoring (FY27 Fee Schedule Sections 4-06.4 and 4-06.5)
  • For fire alarm modifications, a permit covering fewer than 20 devices is priced as a modification; for 21 or more fire alarm devices the permit fee will be treated as a new system (FY27 Fee Schedule Section 4-06.5.3)
  • Automatic extinguishing systems requiring their own permits include special hazard systems (clean agent, dry chemical, CO2, carbon dioxide and other special extinguishing systems) and cooking suppression systems (FY27 Fee Schedule Sections 4-06.4.1 and 4-06.4.2)
  • Above ground (AST) and underground (UST) storage tank installs, removals and modifications require fire construction permits, and additional trade permits may also be required (FY27 Fee Schedule Section 4-06.6)
  • Fire protection system inspections and tests shall be by qualified individuals, who shall forward a report of inspection to the fire code official upon completion — sent to TFD-System-Reports@tucsonaz.gov unless using the IROL reporting system (2018 TFC Section 901.6.3 Records, as published on the TFD permits page)
  • Tucson Water plans associated with fire service must be submitted to the Tucson Development Center (Tucson Fire Department, Get Fire Permits and Fire Code Info page)
  • Inspections must be requested at least one day in advance to confirm date, time and meeting place; this applies to underground pressure tests and flushes, overhead pressure tests, commercial kitchen hood finals, fire alarm finals, and other special permits (Tucson Fire Department, Get Fire Permits and Fire Code Info page)
  • On the associated building permit, Tucson Fire Department separately charges a fire staff review fee of 3% of the building permit fee for new commercial and commercial additions (including multi-family residential and inclusive of pre-submittals and development plans), 2.5% for commercial alterations, and a fire inspection fee of 2% of the building permit fee (FY27 Fee Schedule Sections 4-06.3.1, 4-06.3.2 and 4-06.3.3)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Standard Hourly Rate (the base for all hour-priced fire permit fees)FY27 Planning and Permitting Fee Schedule, Sections 4-01.6.1 and 4-01.6.2 (Hourly Rates), effective July 1, 2026. Read from a rendered page image of the adopted PDF (page 3 of 21). IMPORTANT: the Tucson Fire Department's own posted 'TFD Fee Schedule' PDF is marked Rev. 07.01.25 and prints '*HOURLY RATE: $88.28' at the top — that is the prior fiscal year's rate and is superseded by the FY27 schedule adopted by Mayor and Council on May 19, 2026. The section numbers and hour counts in the two documents are otherwise identical.
$100.00 per hour; Overtime Hourly Rate $200.00 per hour
Fire Sprinkler System — NewFY27 Planning and Permitting Fee Schedule, Section 4-06.4.3 (read from a rendered page image, page 20 of 21). Hours are charged at the Standard Hourly Rate.
2 hours + $0.01 per square foot
Fire Sprinkler System — Underground Fire Line (Supply)FY27 Planning and Permitting Fee Schedule, Section 4-06.4.4 (read from render)
3 hours
Fire Sprinkler System ModificationFY27 Planning and Permitting Fee Schedule, Section 4-06.4.5 (read from render)
2 hours + $2.41 per head (over 20 heads)
Fire Sprinklers 13DFY27 Planning and Permitting Fee Schedule, Section 4-06.4.6 (read from render)
3 hours, per 5,000 sq ft
Fire Sprinkler Systems — Standpipe or In-Rack Storage SystemFY27 Planning and Permitting Fee Schedule, Section 4-06.4.7 (read from render)
3 hours
Commercial Fire Pumps and Related EquipmentFY27 Planning and Permitting Fee Schedule, Section 4-06.4.8 (read from render)
6 hours
Building Fire Alarm System — NewFY27 Planning and Permitting Fee Schedule, Section 4-06.5.1 (read from render)
4 hours + $0.01 per square foot
Dedicated Function Fire Alarm System — NewFY27 Planning and Permitting Fee Schedule, Section 4-06.5.2 (read from render)
4 hours + $0.01 per square foot
Fire Alarm Systems — Modification, fewer than 20 devicesFY27 Planning and Permitting Fee Schedule, Section 4-06.5.3 (read from render). The schedule's comment column states: 'For 21 or more fire alarm devices. Permit fee will be treated as a new system.'
2 hours
Fire Protection System — Monitoring, New or ModificationFY27 Planning and Permitting Fee Schedule, Section 4-06.5.4 (read from render)
2 hours
Special Hazard System — New Installation or ModificationFY27 Planning and Permitting Fee Schedule, Section 4-06.4.1 (read from render). Covers clean agent, dry chemical, CO2, carbon dioxide and other special extinguishing systems.
3 hours, per 5,000 sq ft
Cooking Suppression System — New or ModificationFY27 Planning and Permitting Fee Schedule, Section 4-06.4.2 (read from render)
2 hours
Other Construction Permits Not Listed AboveFY27 Planning and Permitting Fee Schedule, Section 4-06.7.1 (read from render)
2 hours
Fire Review Fee on the associated building permitFY27 Planning and Permitting Fee Schedule, Sections 4-06.3.1, 4-06.3.2 and 4-06.3.3 (read from rendered page images, pages 19 and 20 of 21). The 3% line's comment column states it includes pre-submittals and development plans and includes multi-family residential.
New commercial and commercial additions (staff review): 3% of building permit fee; commercial alterations (staff review): 2.5% of building permit fee; new commercial and commercial additions and alterations (inspections): 2% of building permit fee
New Construction — Water Plan ReviewFY27 Planning and Permitting Fee Schedule, Section 4-06.3.4 (read from render). The comment column states it includes review and 'mylar' signature. This flat fee is identical in the FY26 TFD schedule and the FY27 adopted schedule.
$267.50
Expedited fire plan reviewCity of Tucson Fire Department, 'How to Expedite Construction Permits' handout. Requested by typing EXPEDITE or DOUBLE EXPEDITE at the start of the permit description in TDC Online, or by emailing TFD-Permit-Submital@tucsonaz.gov with the permit number, address and request.
Expedite: double the fees. Double Expedite: triple the fee.

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler & Fire Alarm Permit (Fire Construction Permit) permit actually take in Tucson?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground Pressure Test and Flush

    Required for underground fire line supply work. Schedule at Tucson Development Center and call at least one day prior to the inspection to confirm date, time and meeting place. (Tucson Fire Department, Get Fire Permits and Fire Code Info page)

  2. 2

    Overhead Pressure Test

    Required for overhead fire sprinkler piping. Schedule at Tucson Development Center; call at least one day prior to confirm date, time and meeting place.

  3. 3

    Commercial Kitchen Hood Final

    Final inspection of commercial kitchen hood and cooking suppression systems (Tucson Fire Department, Get Fire Permits and Fire Code Info page)

  4. 4

    Fire Alarm Final

    Final acceptance inspection of the fire alarm system. Inspections and tests must be performed by qualified individuals who forward a report of inspection to the fire code official on completion, sent to TFD-System-Reports@tucsonaz.gov unless using the IROL reporting system (2018 TFC Section 901.6.3).

See the full Tucson inspection guide — scheduling & re-inspection fees →

Tips

  • SUPERSEDED HOURLY RATE — the single most expensive mistake on a Tucson fire permit estimate. TFD's own posted fee sheet is marked Rev. 07.01.25 and prints an hourly rate of $88.28. The FY27 Planning and Permitting Fee Schedule adopted by Mayor and Council on May 19, 2026 and effective July 1, 2026 sets the Standard Hourly Rate at $100.00 (Section 4-01.6.1). Since nearly every fire permit fee is expressed in hours, using the old sheet under-estimates the whole job by roughly 13%.
  • Fire permit fees live in the same fee schedule as building permits, not in a separate fire document. The City's own expedite handout says it outright: 'Fire specific fees are found under Section 4-06.1.0 FIRE' of the PDSD fee schedule.
  • Fire alarm modifications have a cliff at 21 devices. Under 20 devices the permit is priced as a 2-hour modification; at 21 or more, the fee schedule says the permit fee will be treated as a new system — 4 hours plus $0.01 per square foot. Splitting a job across that line is worth checking.
  • Sprinkler modifications are priced per head over 20: 2 hours plus $2.41 per head above the first 20. A small tenant reconfiguration that touches 40 heads carries about $48 in head fees on top of the base hours.
  • Expedite is available and priced: double fees for review up to 2 weeks, triple fees for review up to 1 week. You request it by typing EXPEDITE or DOUBLE EXPEDITE at the start of the permit description when you first submit in TDC Online, or afterwards by emailing TFD-Permit-Submital@tucsonaz.gov with the permit number and address.
  • The submittal checklists are not published yet. TFD's page lists Fire Alarm, Fire Sprinklers, Fire Underground, Fire Pump, Standpipe, Hood Suppression, Clean Agent Suppression and UST/AST checklists under a heading that reads 'Coming Soon.' Do not assume a checklist exists to validate your package against — ask TFD.
  • Design to the right standards: Tucson is on the 2024 IFC as of September 1, 2024, with City amendments, and TFD requires plan submittals to meet 2022 NFPA 13, 13D, 13R and 72. A package built to an older NFPA cycle will come back.
  • Do not confuse the construction permit with the review percentage. The 3% / 2.5% / 2% figures in Section 4-06.3 are fire review and inspection surcharges on the building permit fee for commercial work — they are in addition to, not instead of, the hour-priced sprinkler and alarm permits in Sections 4-06.4 and 4-06.5.

Frequently asked questions

Tucson requires a fire sprinkler & fire alarm permit (fire construction permit) for: The City of Tucson has adopted the 2024 International Fire Code effective September 1, 2024, with City of Tucson amendments (Tucson Fire Department, Get Fire Permits and Fire Code Info page); Plan submittals shall meet the requirements of the 2022 NFPA 13, 13D, 13R, and 72 Standards (Tucson Fire Department, Get Fire Permits and Fire Code Info page, Updated Requirements); Fire construction permits are applied for through Tucson Development Center Online at tdc-online.tucsonaz.gov; A separate Fire Construction Permit is required for each system type: fire sprinkler system (new), underground fire line supply, fire sprinkler system modification, 13D sprinklers, standpipe or in-rack storage systems, commercial fire pumps and related equipment, building fire alarm system (new), dedicated function fire alarm system (new), fire alarm system modification, and fire protection system monitoring (FY27 Fee Schedule Sections 4-06.4 and 4-06.5); For fire alarm modifications, a permit covering fewer than 20 devices is priced as a modification; for 21 or more fire alarm devices the permit fee will be treated as a new system (FY27 Fee Schedule Section 4-06.5.3); Automatic extinguishing systems requiring their own permits include special hazard systems (clean agent, dry chemical, CO2, carbon dioxide and other special extinguishing systems) and cooking suppression systems (FY27 Fee Schedule Sections 4-06.4.1 and 4-06.4.2); Above ground (AST) and underground (UST) storage tank installs, removals and modifications require fire construction permits, and additional trade permits may also be required (FY27 Fee Schedule Section 4-06.6); Fire protection system inspections and tests shall be by qualified individuals, who shall forward a report of inspection to the fire code official upon completion — sent to TFD-System-Reports@tucsonaz.gov unless using the IROL reporting system (2018 TFC Section 901.6.3 Records, as published on the TFD permits page); Tucson Water plans associated with fire service must be submitted to the Tucson Development Center (Tucson Fire Department, Get Fire Permits and Fire Code Info page); Inspections must be requested at least one day in advance to confirm date, time and meeting place; this applies to underground pressure tests and flushes, overhead pressure tests, commercial kitchen hood finals, fire alarm finals, and other special permits (Tucson Fire Department, Get Fire Permits and Fire Code Info page); On the associated building permit, Tucson Fire Department separately charges a fire staff review fee of 3% of the building permit fee for new commercial and commercial additions (including multi-family residential and inclusive of pre-submittals and development plans), 2.5% for commercial alterations, and a fire inspection fee of 2% of the building permit fee (FY27 Fee Schedule Sections 4-06.3.1, 4-06.3.2 and 4-06.3.3). If your project isn't listed, confirm with City of Tucson Planning & Development Services Department (PDSD) at (520) 791-5550 before starting work.

Most fire permit fees are expressed in staff hours charged at the adopted Standard Hourly Rate of $100.00 per hour (FY27 fee schedule Section 4-01.6.1). A new fire sprinkler system is 2 hours plus $0.01 per square foot; an underground fire line supply is 3 hours; a sprinkler modification is 2 hours plus $2.41 per head over 20 heads; 13D sprinklers are 3 hours per 5,000 square feet; commercial fire pumps are 6 hours. A new building fire alarm system is 4 hours plus $0.01 per square foot, and a fire alarm modification under 20 devices is 2 hours. Note that the Tucson Fire Department's own posted fee sheet is marked Rev. 07.01.25 and still shows an hourly rate of $88.28, which the FY27 schedule effective July 1, 2026 supersedes. Sources: FY27 Planning and Permitting Fee Schedule, Sections 4-01.6, 4-06.4 and 4-06.5.

The City does not publish a standard review turnaround for fire construction permits, and fire permits do not appear in any of PDSD's four Permit Review Lanes, so no figure is recorded here. What is published applies only to paid expedited handling: the Fire Department's How to Expedite Construction Permits handout states that Expedite costs double the fees with a review process of up to 2 weeks, and Double Expedite costs triple the fee with a review process of up to 1 week. Source: City of Tucson Fire Department, How to Expedite Construction Permits.

You'll need: Fire Construction Permit Application (TDC Online); Fire Sprinkler / Fire Alarm Plans. Depending on your project, Tucson may also ask for: Fire Construction Permit Submittal Checklists; 2024 Tucson Fire Code Amendments; Inspection / Test Report. See the required-documents checklist on this page for details on each.

Tucson requires 4 inspection(s) for a fire sprinkler & fire alarm permit (fire construction permit), in order: Underground Pressure Test and Flush, Overhead Pressure Test, Commercial Kitchen Hood Final, Fire Alarm Final. Schedule each through City of Tucson Planning & Development Services Department (PDSD) ((520) 791-5550).

Apply through City of Tucson Planning & Development Services Department (PDSD) at Tucson Development Center, 201 N. Stone Avenue, 1st Floor, Tucson, AZ 85701. Phone: (520) 791-5550, email: PDSDinquiries@tucsonaz.gov. Office hours: Tucson Development Center, 201 N. Stone Avenue, 1st Floor: Mon.-Thur. 8 a.m.-4 p.m. (closed Fridays). Staff available by email/phone Mon.-Fri., 8 a.m.-4:30 p.m.. Official information: https://www.tucsonaz.gov/Departments/Planning-Development-Services.

Yes. Tucson Fire Department issues Fire Construction Permits separately from the building permit, applied for through Tucson Development Center Online. The FY27 fee schedule prices each system type on its own line under Section 4-06 FIRE: fire sprinkler system new, underground fire line supply, sprinkler modification, 13D sprinklers, standpipe or in-rack storage, commercial fire pumps, building fire alarm system new, dedicated function fire alarm system new, fire alarm modification, and fire protection system monitoring. Sources: City of Tucson Fire Department, Get Fire Permits and Fire Code Info page; FY27 Planning and Permitting Fee Schedule, Sections 4-06.4 and 4-06.5.

The City of Tucson has adopted the 2024 International Fire Code, effective September 1, 2024, with City of Tucson amendments published by the Fire Department. Plan submittals must additionally meet the requirements of the 2022 editions of NFPA 13, 13D, 13R and 72. Source: City of Tucson Fire Department, Get Fire Permits and Fire Code Info page, and the published 2024 Tucson Fire Code Amendments.