This is PermitBase’s published record for Eloy as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Eloy building permits

Verified

Eloy, Arizona — as published 2026-07-07.

Verified 2026-07-07 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. § 9-802, adoption of public records/technical codes by reference). The City of Eloy independently adopts and administers its own construction codes through its Community Development Department / Building Safety Division under Chapter 5 (Building Regulations) of the Eloy City Code; it does not defer permitting to Pinal County. Source: City of Eloy Ordinance No. 20-900 (adopted December 14, 2020), adopting the City of Eloy Building Code pursuant to A.R.S. § 9-802; Eloy City Code § 5-3, Adoption of Codes.2018 International Building Code (IBC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-3 and § 5-8, Amendments to the 2018 International Building Code). Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025), Part II.2018 International Residential Code (IRC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-9, Amendments to the 2018 International Residential Code). Governs one- and two-family dwelling construction. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025).2018 International Energy Conservation Code (IECC), adopted by reference with City of Eloy amendments; governs residential energy compliance (prescriptive, UA trade-off/RES-check, or performance path). Minimum HVAC efficiencies published by the Building Safety Division: 16 SEER minimum for air conditioning equipment (R403.3.1.2.1 amended, stricter than the unamended IECC baseline), 78% AFUE minimum for weatherized gas heating equipment and 80% AFUE for non-weatherized equipment. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part II §§ X.g-X.h and XV.a.2018 International Existing Building Code (IEBC), adopted and amended by the Mayor and Council of the City of Eloy; applies to reconstruction, alteration, relocation, enlargement, replacement, repair, equipment, use/occupancy, and demolition of existing buildings or structures. Source: City of Eloy Ordinance No. 20-900.2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference; swimming pool/spa barrier and enclosure/safety-device requirements administered consistent with Arizona Revised Statutes § 36-1681, as amended. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 IRC Minimum Submittal Checklist, Part II § I.y.2018 International Fire Code (IFC), enforced by the Eloy Fire District for fire sprinkler and life-safety requirements; a copy of the approved Eloy Fire District Permit is a required submittal item for residential building permits. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part III item 23.2017 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference with City of Eloy amendments (note: electrical code cycle is one edition behind the 2018 ICC set). Source: City of Eloy Building Safety Division page (eloyaz.gov/138/Building-Safety); City of Eloy Ordinance No. 20-900.City of Eloy Code, Chapter 5 (Building Regulations), including § 5-3 (Adoption of Codes), § 5-5 (Building Code Administration), § 5-8 (Amendments to the 2018 International Building Code), and § 5-9 (Amendments to the 2018 International Residential Code) — the operative local amendment layer over the adopted ICC model codes. Copies of all amendments are kept on file with the City Clerk and the Community Development Department. Source: Eloy, AZ Code of Ordinances (codelibrary.amlegal.com/codes/eloyaz).Manufactured/factory-built homes and park models are regulated by the State of Arizona Department of Housing for construction/installation standards and licensing (permit fees for mobile homes are adopted from and updated annually by the State of Arizona Department of Housing); the City of Eloy separately charges local hook-up fees (sewer, water, electrical connections) for site placement. Source: City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule (effective February 16, 2026), Mobile Home Licensing Fees and Mobile Home hook-up sections.

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family and two-family dwelling construction in the City of Eloy. Reviewed against the 2018 IRC, 2018 IBC (non-residential portions), and 2018 IECC as adopted and amended by the City under Chapter 5 of the Eloy City Code (Ordinance No. 20-900, effective December 14, 2020). Applications are submitted electronically through the City's iworq permit portal.

Verified 2026-07-07 · Source

Requirements

  • Building permit required for new single-family and two-family dwelling construction within Eloy city limits
  • Plans must comply with the 2018 IRC/IBC/IECC and City of Eloy amendments, including Climatic and Geographic Design Criteria (115 mph wind; Seismic Design Category B; 34°F winter design temperature; heavy termite potential; 12-inch minimum foundation/footing depth; 0-inch frost line depth)
  • Construction documents (cover sheet, site plan, foundation plan, floor plan, framing plans, elevations, sections, mechanical/electrical/plumbing plans, structural calculations) must be sealed by an Arizona-registered engineer or architect where required and submitted as flattened PDFs (50 MB max per file)
  • Water Availability Letter required from Public Works prior to submittal; Right-of-Way/On-Site Civil Permit required separately if within 400 feet of a public water/wastewater line
  • Pinal County Dust Control Permit required for earthmoving activity disturbing more than approximately 1,690 sq ft (City of Eloy is in the West Pinal Nonattainment Area)
  • Copy of approved Eloy Fire District Permit required as part of the submittal
  • 16 SEER minimum air conditioning efficiency and 78%/80% AFUE minimum gas heating efficiency (weatherized/non-weatherized) required per City-amended IECC criteria
  • Solar-ready zone (minimum 300 sq ft / 10% of roof area) and electrical panel reserved space for future solar required on new construction

Required documents

  • RequiredCity of Eloy Building Permit ApplicationSubmitted through the City's iworq electronic permit portal (eloypermits.portal.iworq.net); paper form also available (rev. 07/14/2025)
  • Required2018 International Residential Code Minimum Submittal Checklist (One- and Two-Unit Residential Plans)City of Eloy checklist (rev. 01/22/2025-01/27/2025) detailing required design criteria, site plan, foundation/floor/framing plans, elevations, structural calculations, mechanical/electrical/plumbing plans, energy compliance (RES-check), and required plan notes
  • OptionalProperty Owner AuthorizationRequired when the property owner is represented by an agent (lawyer, architect, contractor, engineer, etc.)
  • RequiredWater Availability LetterObtained from Public Works (520-466-3082) prior to or with submittal
  • RequiredSoils ReportRequired for a single-family custom home (non-Standard-Plan) submittal, or a signed owner soil waiver

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Residential Minimum ($1-$500 valuation)$60.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule (effective 2/16/2026, Resolution 26-1643), Residential and Commercial Permit Fees Based on Total Valuation table
Building Permit Fee — $500.01 to $2,000$60.00 for the first $500.00 plus $4.45 for each additional $100.00 or fraction thereof, to and including $2,000.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Building Permit Fee — $2,000.01 to $40,000$126.75 for the first $2,000.00 plus $15.00 for each additional $1,000.00 or fraction thereof, to and including $40,000.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Building Permit Fee — $40,000.01 to $100,000$696.75 for the first $40,000.00 plus $12.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Building Permit Fee — $100,000.01 to $500,000$1,416.75 for the first $100,000.00 plus $7.85 for each additional $1,000.00 or fraction thereof, to and including $500,000.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Building Permit Fee — $500,000.01 to $1,000,000$4,556.75 for the first $500,000.00 plus $6.60 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Building Permit Fee — over $1,000,000$7,856.75 for the first $1,000,000.00 plus $5.10 for each additional $1,000.00 to $5,000,000.00; $27,614.41 for the first $5,000,000.00 plus $4.00 per additional $1,000.00 above thatCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Residential Standard Plan Review (Standard Plans valid only while the City uses the same building code under which the plan was approved)$1,200.00 plus the Building Permit Plan Review FeeCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Plan Review Fee (general)65% of the calculated Building Permit FeeCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Basic Plan Review Services section
Certificate of Occupancy — R-3 single-family$30.00 per buildingCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule

Residential Addition / Remodel Permit

Verified

Required for room additions, remodels, and alterations to existing one- and two-family dwellings in Eloy. Reviewed against the 2018 IRC as adopted and amended by the City, using the dedicated Residential Addition or Remodel Minimum Submittal Checklist.

Verified 2026-07-07 · Source

Requirements

  • Building permit required for room additions, remodels, and alterations to existing single- and two-family residences
  • Detached accessory structures 200 sq ft or less with no electrical, plumbing, or mechanical connections do not require a building permit, but Planning and Zoning approval of location is still required
  • Cover sheet, site plan, and construction plans (floor plan, foundation plan, framing/deck plan, cross-section, elevations, energy code compliance, electrical/mechanical/plumbing plans as applicable) required per the Residential Addition or Remodel checklist
  • Structural plan and calculations, truss calculations/layout, soils report, ResCheck, and Manual J/S/D load calculations required based on project scope
  • Demolition plans required separately from new-construction plans when the scope includes demolition; existing, new, and remodeled areas must be clearly identified on the plans

Required documents

  • RequiredCity of Eloy Building Permit ApplicationSubmitted through the iworq electronic permit portal
  • RequiredResidential Addition or Remodel Building Permit ChecklistCity of Eloy checklist (rev. 05/25/2026) detailing cover sheet, site plan, construction plans, and supporting-document requirements for additions and remodels
  • RequiredSite PlanParcel lot lines/address, setbacks, existing structures/fences/retaining walls, existing utilities/easements, location/size of proposed structure, flood table

Fee schedule

Fee typeAmountNotes
Building Permit Fee (Addition/Remodel, Based on Valuation)Per the Residential and Commercial Permit Fees valuation table (Residential Minimum $60.00 for $1-$500; scaling tiers as published)
City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule — same valuation table as new construction, per the value of the addition/remodel work or a signed contract, whichever is less. Show full citation

City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule — same valuation table as new construction, per the value of the addition/remodel work or a signed contract, whichever is less. Per the fee schedule's Building Permit Fees section: permits for existing R-3 buildings (except pools), including interior alterations, detached garages, carports, storage sheds over 200 sq ft, patio covers and gazebos, use the same Table 1-A-style valuation fee with a plan review fee not to exceed $35.00; habitable room additions are billed on the full valuation table

Plan Review Fee — Interior alterations, detached garages/carports/sheds over 200 sq ft, patio covers, gazebos (capped)Not to exceed $35.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Building Permit Fees section
Site/plot plan review (or revision) for a residential lot using a standard plan$60.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Minor Revisions of Plans after Permit Issuance — Residential (1-hour minimum)$135.00 per hour, plus $30.00 per additional reviewCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in Eloy, governed by the 2017 National Electrical Code (NEC) as adopted by the City. Billed per a detailed unit/system fee schedule covering fixtures, services, and appliance circuits, in addition to a flat permit-issuance fee.

Verified 2026-07-07 · Source

Requirements

  • Electrical permit required for repair/replacement, added circuits/outlets, new service entrances/upgrades, and new electric meters
  • Governed by the 2017 NEC as adopted by the City of Eloy
  • Correct ROC (Registrar of Contractors) license class must be listed for the specific electrical work being performed
  • Electrical schematic/floor plan required showing circuit locations, GFCI/AFCI requirements, and appliance requirements for specialized equipment (spas, pumps, etc.)
  • Load calculations required for EV chargers, hot tubs, HVAC equipment, workshop equipment, and subpanels
  • One-line diagram required for service entrance sections (SES) and subpanels on new service/upgrade work; electrical services over 400 amps require an Arizona-engineer-sealed plan review

Required documents

  • RequiredCity of Eloy Building Permit Application (Electrical)Submitted through the iworq electronic permit portal
  • RequiredMinimal Electrical Only Permit ChecklistCity of Eloy checklist (rev. 05/25/2026) covering repair/replacement, added circuits, new service/upgrades, and new meters

Fee schedule

Fee typeAmountNotes
Issuance of each electrical permit$30.00 plus additional fee per item constructed/installedCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Electrical Permit Fees
Supplemental permit (original not expired/cancelled/finaled)$9.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Receptacle/Switch/Light Outlets, first 20 fixtures, each$1.10City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule (additional fixtures $0.73 each)
For services of 600 volts or less, up to 200 amperes$30.50City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule
For services of 600 volts or less, over 200 to 1,000 amperes$62.15City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule
For services over 600 volts and over 1,000 amperes$124.30City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule
Electrical services of 400 amperes or larger (plan review, engineer-sealed plans required)$100.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Temporary Electrical Service or Panel Upgrade, per panel$90.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in Eloy, including gas piping and water heater work, governed by the 2018 IRC plumbing provisions as adopted by the City.

Verified 2026-07-07 · Source

Requirements

  • Plumbing permit required for interior plumbing repair/replacement, new/replacement gas yard lines, new gas appliances, water heater fuel-type changes, and water/sewer yard line repair or replacement
  • Governed by the 2018 IRC plumbing provisions as adopted by the City of Eloy
  • Correct ROC license class must be listed for the specific plumbing work being performed
  • Gas repairs require BTU ratings and total developed length of piping at all gas appliances; gas yard line work requires dielectric union and house-side shutoff details
  • Water heater replacement includes a processing fee; storage-tank water heaters require a drain pan and drain line except where no drain is readily available for a replacement unit

Required documents

  • RequiredCity of Eloy Building Permit Application (Plumbing)Submitted through the iworq electronic permit portal
  • RequiredMinimal Plumbing Permit Only ChecklistCity of Eloy checklist (rev. 05/25/2026) covering interior plumbing repair/replace, gas yard lines, new gas appliances, water heater changes, and water/sewer yard line repair

Fee schedule

Fee typeAmountNotes
Issuance of each plumbing permit$24.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Plumbing Permit Fees — Table 1-D
Supplemental permit (original not expired/cancelled/finaled)$7.25City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Water Heater Replacement per Unit (includes processing fee) — Residential (R-3)$45.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Water Heater Replacement per Unit (includes processing fee) — All others$50.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Each plumbing fixture or trap (or set of fixtures on one trap)$9.80City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Fixtures and Vents
Each building sewer / trailer park sewer (including repairs)$24.65City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Sewers/Disposal Systems
Gas piping system, 1-5 outlets$6.15 (plus $1.10 per additional outlet over 5)City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Gas Piping Systems
Gas service permit, hook up to existing gas line$30.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations in Eloy, governed by the 2018 International Mechanical Code (IMC) as adopted by the City. New/replacement HVAC must meet the City's amended minimum efficiency thresholds (16 SEER, 78%/80% AFUE).

Verified 2026-07-07 · Source

Requirements

  • Mechanical permit required for new heating/AC units, new locations or ductwork/curbing, fireplace inserts/replacement, firepits/BBQs/outdoor kitchens with gas connections, and new or replacement wall/ground-mounted equipment
  • Governed by the 2018 IMC as adopted by the City of Eloy
  • New and replacement HVAC equipment must be sized per ACCA Manual J, S, and D (load calculation, equipment selection, duct design); minimum 16 SEER for air conditioning equipment; minimum 78% AFUE (weatherized) / 80% AFUE (non-weatherized) for gas heating equipment
  • New rooftop or attic-space units require a Roof System Confirmation (sealed engineer letter or truss manufacturer verification letter) and RESCheck for all new mechanical units
  • Correct ROC license class must be listed for the specific mechanical work being performed

Required documents

  • RequiredCity of Eloy Building Permit Application (Mechanical)Submitted through the iworq electronic permit portal
  • RequiredMinimal Mechanical Permit Only ChecklistCity of Eloy checklist (rev. 05/25/2026) covering new heating/AC units, fireplace inserts, firepits/outdoor kitchens with gas, and wall/ground-mounted equipment
  • RequiredManual J, S, and D Load CalculationsRequired for sizing new or replacement HVAC equipment and duct design

Fee schedule

Fee typeAmountNotes
Issuance of Mechanical Permit$30.00 plus additional fee per item constructed/installedCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Mechanical Permit Fees
Supplemental permit (original not expired/cancelled/finaled)$9.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
HVAC Change-outs per unit excluding ductwork (includes plan review fee) — Residential (R-3)$120.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
HVAC Change-outs per unit excluding ductwork (includes plan review fee) — All others$90.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Combination units (heating and cooling) — Residential (R-3)$150.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Combination units (heating and cooling) — All others$135.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
If ductwork is being replaced (additional)$180.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Air Conditioning, Single-Family (per unit, with or without ductwork including associated electrical work)$25.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Air Conditioning unit fee
Installation/relocation of forced-air or gravity furnace/burner, up to 100,000 Btu/h$14.80City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule (over 100,000 Btu/h is $18.20)

Re-Roofing Permit

Required for residential re-roofing in Eloy only when 100% of the roof sheathing is being replaced; if 50% or less of the sheathing is replaced, no permit is required. Billed as a flat fee for one- and two-dwelling structures.

Reviewed 2026-07-07 · Source

Requirements

  • A roofing permit is required only if 100% of the roof sheathing is being replaced; if 50% or less of the sheathing is being replaced, no permit is required (a narrow middle ground between 50% and 100% sheathing replacement is not explicitly addressed in the published fee-schedule language)
  • Applies to one- and two-dwelling (residential) structures per the published flat-fee category
  • Governed by 2018 IBC/IRC roofing provisions as adopted by the City of Eloy

Required documents

  • RequiredCity of Eloy Building Permit Application (Re-Roof)Submitted through the iworq electronic permit portal

Fee schedule

Fee typeAmountNotes
Re-Roof (One- and Two-Dwelling Structures Only) — roofing permit when 100% of roof sheathing is being replaced$180.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule; no permit required if 50% or less of the roof sheathing is being replaced

Residential Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop residential solar photovoltaic systems on existing residential (R-3) buildings in Eloy. Governed by the 2018 IRC/IECC solar-ready provisions and the 2017 NEC as adopted by the City, with a dedicated Solar System Minimum Submittal Checklist.

Verified 2026-07-07 · Source

Requirements

  • Governed by the 2018 IRC (Appendix RA103, Solar-Ready Provisions) and 2017 NEC as adopted by the City of Eloy
  • Cover sheet, site plan, solar plans (roof layout with fire pathways, roof support/racking detail, placard/label locations, one-line diagram), and electrical plan (battery install information, equipment specs) required, sealed by an Arizona-registered engineer or architect
  • Structural design analysis for panel modules and mounting system required for residential systems built prior to 2021; all commercial systems require a sealed structural analysis regardless of build date
  • Correct ROC license class must be listed on the application for the work being performed
  • Fee is calculated per system, up to and including 10kW, for residential (R-3) buildings

Required documents

  • RequiredCity of Eloy Building Permit Application (Solar)Submitted through the iworq electronic permit portal
  • RequiredResidential Solar System Permit ChecklistCity of Eloy checklist (rev. 05/25/2026) covering cover sheet, site plan, solar plans, and electrical plan requirements, all sealed by an Arizona-registered engineer or architect

Fee schedule

Fee typeAmountNotes
Residential Photovoltaic Systems on Existing Residential (R-3) Buildings, per system 10kW or less — Building Permit$60.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule (fee listed under the Miscellaneous fee grouping; per-system flat fee for 10kW-or-less R-3 systems)
Residential Photovoltaic Systems on Existing Residential (R-3) Buildings, per system 10kW or less — Plan Review$30.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule

Demolition Permit

Verified

Required for demolition of residential and other structures in Eloy. Billed as a flat fee tiered by structure type (accessory/garage, single-family residence, or other), per the City's Consolidated Rate and Fee Schedule.

Verified 2026-07-07 · Source

Requirements

  • Building permit required before demolishing a structure within Eloy city limits
  • Fee is tiered by structure category: residential accessory building/garage, single-family residence, or structures other than residential single-family
  • Pinal County Dust Control Permit coordination expected given the City's location in the West Pinal Nonattainment Area
  • Project is not legally complete until an approved final inspection has occurred

Required documents

  • RequiredCity of Eloy Building Permit Application (Demolition)Submitted through the iworq electronic permit portal
  • RequiredSite PlanShowing the structure(s) to be demolished and other existing structures on the parcel

Fee schedule

Fee typeAmountNotes
Demolition of Buildings — Residential accessory building or garage, per structure$90.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Demolition of Buildings — Single-family residence, per structure$90.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
Demolition of Buildings — Structures other than residential single-family, per structure$540.00City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eloy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-20) →View current record →All versions →

Permalink: /arizona/pinal-county/eloy/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 4bca8d1

Reproducible from PermitBase’s version-controlled dataset, commit 4bca8d1.