This is PermitBase’s published record for Eloy as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Eloy building permits
VerifiedEloy, Arizona — as published 2026-07-07.
Verified 2026-07-07 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family and two-family dwelling construction in the City of Eloy. Reviewed against the 2018 IRC, 2018 IBC (non-residential portions), and 2018 IECC as adopted and amended by the City under Chapter 5 of the Eloy City Code (Ordinance No. 20-900, effective December 14, 2020). Applications are submitted electronically through the City's iworq permit portal.
Verified 2026-07-07 · Source
Requirements
- Building permit required for new single-family and two-family dwelling construction within Eloy city limits
- Plans must comply with the 2018 IRC/IBC/IECC and City of Eloy amendments, including Climatic and Geographic Design Criteria (115 mph wind; Seismic Design Category B; 34°F winter design temperature; heavy termite potential; 12-inch minimum foundation/footing depth; 0-inch frost line depth)
- Construction documents (cover sheet, site plan, foundation plan, floor plan, framing plans, elevations, sections, mechanical/electrical/plumbing plans, structural calculations) must be sealed by an Arizona-registered engineer or architect where required and submitted as flattened PDFs (50 MB max per file)
- Water Availability Letter required from Public Works prior to submittal; Right-of-Way/On-Site Civil Permit required separately if within 400 feet of a public water/wastewater line
- Pinal County Dust Control Permit required for earthmoving activity disturbing more than approximately 1,690 sq ft (City of Eloy is in the West Pinal Nonattainment Area)
- Copy of approved Eloy Fire District Permit required as part of the submittal
- 16 SEER minimum air conditioning efficiency and 78%/80% AFUE minimum gas heating efficiency (weatherized/non-weatherized) required per City-amended IECC criteria
- Solar-ready zone (minimum 300 sq ft / 10% of roof area) and electrical panel reserved space for future solar required on new construction
Required documents
- RequiredCity of Eloy Building Permit ApplicationSubmitted through the City's iworq electronic permit portal (eloypermits.portal.iworq.net); paper form also available (rev. 07/14/2025)
- Required2018 International Residential Code Minimum Submittal Checklist (One- and Two-Unit Residential Plans)City of Eloy checklist (rev. 01/22/2025-01/27/2025) detailing required design criteria, site plan, foundation/floor/framing plans, elevations, structural calculations, mechanical/electrical/plumbing plans, energy compliance (RES-check), and required plan notes
- OptionalProperty Owner AuthorizationRequired when the property owner is represented by an agent (lawyer, architect, contractor, engineer, etc.)
- RequiredWater Availability LetterObtained from Public Works (520-466-3082) prior to or with submittal
- RequiredSoils ReportRequired for a single-family custom home (non-Standard-Plan) submittal, or a signed owner soil waiver
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Residential Minimum ($1-$500 valuation) | $60.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule (effective 2/16/2026, Resolution 26-1643), Residential and Commercial Permit Fees Based on Total Valuation table |
| Building Permit Fee — $500.01 to $2,000 | $60.00 for the first $500.00 plus $4.45 for each additional $100.00 or fraction thereof, to and including $2,000.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Building Permit Fee — $2,000.01 to $40,000 | $126.75 for the first $2,000.00 plus $15.00 for each additional $1,000.00 or fraction thereof, to and including $40,000.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Building Permit Fee — $40,000.01 to $100,000 | $696.75 for the first $40,000.00 plus $12.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Building Permit Fee — $100,000.01 to $500,000 | $1,416.75 for the first $100,000.00 plus $7.85 for each additional $1,000.00 or fraction thereof, to and including $500,000.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Building Permit Fee — $500,000.01 to $1,000,000 | $4,556.75 for the first $500,000.00 plus $6.60 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Building Permit Fee — over $1,000,000 | $7,856.75 for the first $1,000,000.00 plus $5.10 for each additional $1,000.00 to $5,000,000.00; $27,614.41 for the first $5,000,000.00 plus $4.00 per additional $1,000.00 above that | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Residential Standard Plan Review (Standard Plans valid only while the City uses the same building code under which the plan was approved) | $1,200.00 plus the Building Permit Plan Review Fee | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Plan Review Fee (general) | 65% of the calculated Building Permit Fee | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Basic Plan Review Services section |
| Certificate of Occupancy — R-3 single-family | $30.00 per building | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
Residential Addition / Remodel Permit
VerifiedRequired for room additions, remodels, and alterations to existing one- and two-family dwellings in Eloy. Reviewed against the 2018 IRC as adopted and amended by the City, using the dedicated Residential Addition or Remodel Minimum Submittal Checklist.
Verified 2026-07-07 · Source
Requirements
- Building permit required for room additions, remodels, and alterations to existing single- and two-family residences
- Detached accessory structures 200 sq ft or less with no electrical, plumbing, or mechanical connections do not require a building permit, but Planning and Zoning approval of location is still required
- Cover sheet, site plan, and construction plans (floor plan, foundation plan, framing/deck plan, cross-section, elevations, energy code compliance, electrical/mechanical/plumbing plans as applicable) required per the Residential Addition or Remodel checklist
- Structural plan and calculations, truss calculations/layout, soils report, ResCheck, and Manual J/S/D load calculations required based on project scope
- Demolition plans required separately from new-construction plans when the scope includes demolition; existing, new, and remodeled areas must be clearly identified on the plans
Required documents
- RequiredCity of Eloy Building Permit ApplicationSubmitted through the iworq electronic permit portal
- RequiredResidential Addition or Remodel Building Permit ChecklistCity of Eloy checklist (rev. 05/25/2026) detailing cover sheet, site plan, construction plans, and supporting-document requirements for additions and remodels
- RequiredSite PlanParcel lot lines/address, setbacks, existing structures/fences/retaining walls, existing utilities/easements, location/size of proposed structure, flood table
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Addition/Remodel, Based on Valuation) | Per the Residential and Commercial Permit Fees valuation table (Residential Minimum $60.00 for $1-$500; scaling tiers as published) | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule — same valuation table as new construction, per the value of the addition/remodel work or a signed contract, whichever is less. Show full citationHideCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule — same valuation table as new construction, per the value of the addition/remodel work or a signed contract, whichever is less. Per the fee schedule's Building Permit Fees section: permits for existing R-3 buildings (except pools), including interior alterations, detached garages, carports, storage sheds over 200 sq ft, patio covers and gazebos, use the same Table 1-A-style valuation fee with a plan review fee not to exceed $35.00; habitable room additions are billed on the full valuation table |
| Plan Review Fee — Interior alterations, detached garages/carports/sheds over 200 sq ft, patio covers, gazebos (capped) | Not to exceed $35.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Building Permit Fees section |
| Site/plot plan review (or revision) for a residential lot using a standard plan | $60.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Minor Revisions of Plans after Permit Issuance — Residential (1-hour minimum) | $135.00 per hour, plus $30.00 per additional review | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in Eloy, governed by the 2017 National Electrical Code (NEC) as adopted by the City. Billed per a detailed unit/system fee schedule covering fixtures, services, and appliance circuits, in addition to a flat permit-issuance fee.
Verified 2026-07-07 · Source
Requirements
- Electrical permit required for repair/replacement, added circuits/outlets, new service entrances/upgrades, and new electric meters
- Governed by the 2017 NEC as adopted by the City of Eloy
- Correct ROC (Registrar of Contractors) license class must be listed for the specific electrical work being performed
- Electrical schematic/floor plan required showing circuit locations, GFCI/AFCI requirements, and appliance requirements for specialized equipment (spas, pumps, etc.)
- Load calculations required for EV chargers, hot tubs, HVAC equipment, workshop equipment, and subpanels
- One-line diagram required for service entrance sections (SES) and subpanels on new service/upgrade work; electrical services over 400 amps require an Arizona-engineer-sealed plan review
Required documents
- RequiredCity of Eloy Building Permit Application (Electrical)Submitted through the iworq electronic permit portal
- RequiredMinimal Electrical Only Permit ChecklistCity of Eloy checklist (rev. 05/25/2026) covering repair/replacement, added circuits, new service/upgrades, and new meters
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Issuance of each electrical permit | $30.00 plus additional fee per item constructed/installed | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Electrical Permit Fees |
| Supplemental permit (original not expired/cancelled/finaled) | $9.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Receptacle/Switch/Light Outlets, first 20 fixtures, each | $1.10 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule (additional fixtures $0.73 each) |
| For services of 600 volts or less, up to 200 amperes | $30.50 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule |
| For services of 600 volts or less, over 200 to 1,000 amperes | $62.15 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule |
| For services over 600 volts and over 1,000 amperes | $124.30 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule |
| Electrical services of 400 amperes or larger (plan review, engineer-sealed plans required) | $100.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Temporary Electrical Service or Panel Upgrade, per panel | $90.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in Eloy, including gas piping and water heater work, governed by the 2018 IRC plumbing provisions as adopted by the City.
Verified 2026-07-07 · Source
Requirements
- Plumbing permit required for interior plumbing repair/replacement, new/replacement gas yard lines, new gas appliances, water heater fuel-type changes, and water/sewer yard line repair or replacement
- Governed by the 2018 IRC plumbing provisions as adopted by the City of Eloy
- Correct ROC license class must be listed for the specific plumbing work being performed
- Gas repairs require BTU ratings and total developed length of piping at all gas appliances; gas yard line work requires dielectric union and house-side shutoff details
- Water heater replacement includes a processing fee; storage-tank water heaters require a drain pan and drain line except where no drain is readily available for a replacement unit
Required documents
- RequiredCity of Eloy Building Permit Application (Plumbing)Submitted through the iworq electronic permit portal
- RequiredMinimal Plumbing Permit Only ChecklistCity of Eloy checklist (rev. 05/25/2026) covering interior plumbing repair/replace, gas yard lines, new gas appliances, water heater changes, and water/sewer yard line repair
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Issuance of each plumbing permit | $24.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Plumbing Permit Fees — Table 1-D |
| Supplemental permit (original not expired/cancelled/finaled) | $7.25 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Water Heater Replacement per Unit (includes processing fee) — Residential (R-3) | $45.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Water Heater Replacement per Unit (includes processing fee) — All others | $50.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Each plumbing fixture or trap (or set of fixtures on one trap) | $9.80 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Fixtures and Vents |
| Each building sewer / trailer park sewer (including repairs) | $24.65 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Sewers/Disposal Systems |
| Gas piping system, 1-5 outlets | $6.15 (plus $1.10 per additional outlet over 5) | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Gas Piping Systems |
| Gas service permit, hook up to existing gas line | $30.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations in Eloy, governed by the 2018 International Mechanical Code (IMC) as adopted by the City. New/replacement HVAC must meet the City's amended minimum efficiency thresholds (16 SEER, 78%/80% AFUE).
Verified 2026-07-07 · Source
Requirements
- Mechanical permit required for new heating/AC units, new locations or ductwork/curbing, fireplace inserts/replacement, firepits/BBQs/outdoor kitchens with gas connections, and new or replacement wall/ground-mounted equipment
- Governed by the 2018 IMC as adopted by the City of Eloy
- New and replacement HVAC equipment must be sized per ACCA Manual J, S, and D (load calculation, equipment selection, duct design); minimum 16 SEER for air conditioning equipment; minimum 78% AFUE (weatherized) / 80% AFUE (non-weatherized) for gas heating equipment
- New rooftop or attic-space units require a Roof System Confirmation (sealed engineer letter or truss manufacturer verification letter) and RESCheck for all new mechanical units
- Correct ROC license class must be listed for the specific mechanical work being performed
Required documents
- RequiredCity of Eloy Building Permit Application (Mechanical)Submitted through the iworq electronic permit portal
- RequiredMinimal Mechanical Permit Only ChecklistCity of Eloy checklist (rev. 05/25/2026) covering new heating/AC units, fireplace inserts, firepits/outdoor kitchens with gas, and wall/ground-mounted equipment
- RequiredManual J, S, and D Load CalculationsRequired for sizing new or replacement HVAC equipment and duct design
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Issuance of Mechanical Permit | $30.00 plus additional fee per item constructed/installed | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Mechanical Permit Fees |
| Supplemental permit (original not expired/cancelled/finaled) | $9.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| HVAC Change-outs per unit excluding ductwork (includes plan review fee) — Residential (R-3) | $120.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| HVAC Change-outs per unit excluding ductwork (includes plan review fee) — All others | $90.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Combination units (heating and cooling) — Residential (R-3) | $150.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Combination units (heating and cooling) — All others | $135.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| If ductwork is being replaced (additional) | $180.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Air Conditioning, Single-Family (per unit, with or without ductwork including associated electrical work) | $25.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Air Conditioning unit fee |
| Installation/relocation of forced-air or gravity furnace/burner, up to 100,000 Btu/h | $14.80 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule (over 100,000 Btu/h is $18.20) |
Re-Roofing Permit
Required for residential re-roofing in Eloy only when 100% of the roof sheathing is being replaced; if 50% or less of the sheathing is replaced, no permit is required. Billed as a flat fee for one- and two-dwelling structures.
Reviewed 2026-07-07 · Source
Requirements
- A roofing permit is required only if 100% of the roof sheathing is being replaced; if 50% or less of the sheathing is being replaced, no permit is required (a narrow middle ground between 50% and 100% sheathing replacement is not explicitly addressed in the published fee-schedule language)
- Applies to one- and two-dwelling (residential) structures per the published flat-fee category
- Governed by 2018 IBC/IRC roofing provisions as adopted by the City of Eloy
Required documents
- RequiredCity of Eloy Building Permit Application (Re-Roof)Submitted through the iworq electronic permit portal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-Roof (One- and Two-Dwelling Structures Only) — roofing permit when 100% of roof sheathing is being replaced | $180.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule; no permit required if 50% or less of the roof sheathing is being replaced |
Residential Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of rooftop residential solar photovoltaic systems on existing residential (R-3) buildings in Eloy. Governed by the 2018 IRC/IECC solar-ready provisions and the 2017 NEC as adopted by the City, with a dedicated Solar System Minimum Submittal Checklist.
Verified 2026-07-07 · Source
Requirements
- Governed by the 2018 IRC (Appendix RA103, Solar-Ready Provisions) and 2017 NEC as adopted by the City of Eloy
- Cover sheet, site plan, solar plans (roof layout with fire pathways, roof support/racking detail, placard/label locations, one-line diagram), and electrical plan (battery install information, equipment specs) required, sealed by an Arizona-registered engineer or architect
- Structural design analysis for panel modules and mounting system required for residential systems built prior to 2021; all commercial systems require a sealed structural analysis regardless of build date
- Correct ROC license class must be listed on the application for the work being performed
- Fee is calculated per system, up to and including 10kW, for residential (R-3) buildings
Required documents
- RequiredCity of Eloy Building Permit Application (Solar)Submitted through the iworq electronic permit portal
- RequiredResidential Solar System Permit ChecklistCity of Eloy checklist (rev. 05/25/2026) covering cover sheet, site plan, solar plans, and electrical plan requirements, all sealed by an Arizona-registered engineer or architect
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Photovoltaic Systems on Existing Residential (R-3) Buildings, per system 10kW or less — Building Permit | $60.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule (fee listed under the Miscellaneous fee grouping; per-system flat fee for 10kW-or-less R-3 systems) |
| Residential Photovoltaic Systems on Existing Residential (R-3) Buildings, per system 10kW or less — Plan Review | $30.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
Demolition Permit
VerifiedRequired for demolition of residential and other structures in Eloy. Billed as a flat fee tiered by structure type (accessory/garage, single-family residence, or other), per the City's Consolidated Rate and Fee Schedule.
Verified 2026-07-07 · Source
Requirements
- Building permit required before demolishing a structure within Eloy city limits
- Fee is tiered by structure category: residential accessory building/garage, single-family residence, or structures other than residential single-family
- Pinal County Dust Control Permit coordination expected given the City's location in the West Pinal Nonattainment Area
- Project is not legally complete until an approved final inspection has occurred
Required documents
- RequiredCity of Eloy Building Permit Application (Demolition)Submitted through the iworq electronic permit portal
- RequiredSite PlanShowing the structure(s) to be demolished and other existing structures on the parcel
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition of Buildings — Residential accessory building or garage, per structure | $90.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Demolition of Buildings — Single-family residence, per structure | $90.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Demolition of Buildings — Structures other than residential single-family, per structure | $540.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eloy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.