Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family and two-family dwelling construction in the City of Eloy. Reviewed against the 2018 IRC, 2018 IBC (non-residential portions), and 2018 IECC as adopted and amended by the City under Chapter 5 of the Eloy City Code (Ordinance No. 20-900, effective December 14, 2020). Applications are submitted electronically through the City's iworq permit portal.
Verified 2026-07-07 · Source
Requirements
- Building permit required for new single-family and two-family dwelling construction within Eloy city limits
- Plans must comply with the 2018 IRC/IBC/IECC and City of Eloy amendments, including Climatic and Geographic Design Criteria (115 mph wind; Seismic Design Category B; 34°F winter design temperature; heavy termite potential; 12-inch minimum foundation/footing depth; 0-inch frost line depth)
- Construction documents (cover sheet, site plan, foundation plan, floor plan, framing plans, elevations, sections, mechanical/electrical/plumbing plans, structural calculations) must be sealed by an Arizona-registered engineer or architect where required and submitted as flattened PDFs (50 MB max per file)
- Water Availability Letter required from Public Works prior to submittal; Right-of-Way/On-Site Civil Permit required separately if within 400 feet of a public water/wastewater line
- Pinal County Dust Control Permit required for earthmoving activity disturbing more than approximately 1,690 sq ft (City of Eloy is in the West Pinal Nonattainment Area)
- Copy of approved Eloy Fire District Permit required as part of the submittal
- 16 SEER minimum air conditioning efficiency and 78%/80% AFUE minimum gas heating efficiency (weatherized/non-weatherized) required per City-amended IECC criteria
- Solar-ready zone (minimum 300 sq ft / 10% of roof area) and electrical panel reserved space for future solar required on new construction
Required documents
- RequiredCity of Eloy Building Permit ApplicationSubmitted through the City's iworq electronic permit portal (eloypermits.portal.iworq.net); paper form also available (rev. 07/14/2025)
- Required2018 International Residential Code Minimum Submittal Checklist (One- and Two-Unit Residential Plans)City of Eloy checklist (rev. 01/22/2025-01/27/2025) detailing required design criteria, site plan, foundation/floor/framing plans, elevations, structural calculations, mechanical/electrical/plumbing plans, energy compliance (RES-check), and required plan notes
- OptionalProperty Owner AuthorizationRequired when the property owner is represented by an agent (lawyer, architect, contractor, engineer, etc.)
- RequiredWater Availability LetterObtained from Public Works (520-466-3082) prior to or with submittal
- RequiredSoils ReportRequired for a single-family custom home (non-Standard-Plan) submittal, or a signed owner soil waiver
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Residential Minimum ($1-$500 valuation) | $60.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule (effective 2/16/2026, Resolution 26-1643), Residential and Commercial Permit Fees Based on Total Valuation table |
| Building Permit Fee — $500.01 to $2,000 | $60.00 for the first $500.00 plus $4.45 for each additional $100.00 or fraction thereof, to and including $2,000.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Building Permit Fee — $2,000.01 to $40,000 | $126.75 for the first $2,000.00 plus $15.00 for each additional $1,000.00 or fraction thereof, to and including $40,000.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Building Permit Fee — $40,000.01 to $100,000 | $696.75 for the first $40,000.00 plus $12.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Building Permit Fee — $100,000.01 to $500,000 | $1,416.75 for the first $100,000.00 plus $7.85 for each additional $1,000.00 or fraction thereof, to and including $500,000.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Building Permit Fee — $500,000.01 to $1,000,000 | $4,556.75 for the first $500,000.00 plus $6.60 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Building Permit Fee — over $1,000,000 | $7,856.75 for the first $1,000,000.00 plus $5.10 for each additional $1,000.00 to $5,000,000.00; $27,614.41 for the first $5,000,000.00 plus $4.00 per additional $1,000.00 above that | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Residential Standard Plan Review (Standard Plans valid only while the City uses the same building code under which the plan was approved) | $1,200.00 plus the Building Permit Plan Review Fee | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Plan Review Fee (general) | 65% of the calculated Building Permit Fee | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Basic Plan Review Services section |
| Certificate of Occupancy — R-3 single-family | $30.00 per building | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
Residential Addition / Remodel Permit
VerifiedRequired for room additions, remodels, and alterations to existing one- and two-family dwellings in Eloy. Reviewed against the 2018 IRC as adopted and amended by the City, using the dedicated Residential Addition or Remodel Minimum Submittal Checklist.
Verified 2026-07-07 · Source
Requirements
- Building permit required for room additions, remodels, and alterations to existing single- and two-family residences
- Detached accessory structures 200 sq ft or less with no electrical, plumbing, or mechanical connections do not require a building permit, but Planning and Zoning approval of location is still required
- Cover sheet, site plan, and construction plans (floor plan, foundation plan, framing/deck plan, cross-section, elevations, energy code compliance, electrical/mechanical/plumbing plans as applicable) required per the Residential Addition or Remodel checklist
- Structural plan and calculations, truss calculations/layout, soils report, ResCheck, and Manual J/S/D load calculations required based on project scope
- Demolition plans required separately from new-construction plans when the scope includes demolition; existing, new, and remodeled areas must be clearly identified on the plans
Required documents
- RequiredCity of Eloy Building Permit ApplicationSubmitted through the iworq electronic permit portal
- RequiredResidential Addition or Remodel Building Permit ChecklistCity of Eloy checklist (rev. 05/25/2026) detailing cover sheet, site plan, construction plans, and supporting-document requirements for additions and remodels
- RequiredSite PlanParcel lot lines/address, setbacks, existing structures/fences/retaining walls, existing utilities/easements, location/size of proposed structure, flood table
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Addition/Remodel, Based on Valuation) | Per the Residential and Commercial Permit Fees valuation table (Residential Minimum $60.00 for $1-$500; scaling tiers as published) | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule — same valuation table as new construction, per the value of the addition/remodel work or a signed contract, whichever is less. Per the fee schedule's Building Permit Fees section: permits for existing R-3 buildings (except pools), including interior alterations, detached garages, carports, storage sheds over 200 sq ft, patio covers and gazebos, use the same Table 1-A-style valuation fee with a plan review fee not to exceed $35.00; habitable room additions are billed on the full valuation table |
| Plan Review Fee — Interior alterations, detached garages/carports/sheds over 200 sq ft, patio covers, gazebos (capped) | Not to exceed $35.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Building Permit Fees section |
| Site/plot plan review (or revision) for a residential lot using a standard plan | $60.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Minor Revisions of Plans after Permit Issuance — Residential (1-hour minimum) | $135.00 per hour, plus $30.00 per additional review | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in Eloy, governed by the 2017 National Electrical Code (NEC) as adopted by the City. Billed per a detailed unit/system fee schedule covering fixtures, services, and appliance circuits, in addition to a flat permit-issuance fee.
Verified 2026-07-07 · Source
Requirements
- Electrical permit required for repair/replacement, added circuits/outlets, new service entrances/upgrades, and new electric meters
- Governed by the 2017 NEC as adopted by the City of Eloy
- Correct ROC (Registrar of Contractors) license class must be listed for the specific electrical work being performed
- Electrical schematic/floor plan required showing circuit locations, GFCI/AFCI requirements, and appliance requirements for specialized equipment (spas, pumps, etc.)
- Load calculations required for EV chargers, hot tubs, HVAC equipment, workshop equipment, and subpanels
- One-line diagram required for service entrance sections (SES) and subpanels on new service/upgrade work; electrical services over 400 amps require an Arizona-engineer-sealed plan review
Required documents
- RequiredCity of Eloy Building Permit Application (Electrical)Submitted through the iworq electronic permit portal
- RequiredMinimal Electrical Only Permit ChecklistCity of Eloy checklist (rev. 05/25/2026) covering repair/replacement, added circuits, new service/upgrades, and new meters
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Issuance of each electrical permit | $30.00 plus additional fee per item constructed/installed | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Electrical Permit Fees |
| Supplemental permit (original not expired/cancelled/finaled) | $9.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Receptacle/Switch/Light Outlets, first 20 fixtures, each | $1.10 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule (additional fixtures $0.73 each) |
| For services of 600 volts or less, up to 200 amperes | $30.50 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule |
| For services of 600 volts or less, over 200 to 1,000 amperes | $62.15 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule |
| For services over 600 volts and over 1,000 amperes | $124.30 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule |
| Electrical services of 400 amperes or larger (plan review, engineer-sealed plans required) | $100.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Temporary Electrical Service or Panel Upgrade, per panel | $90.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in Eloy, including gas piping and water heater work, governed by the 2018 IRC plumbing provisions as adopted by the City.
Verified 2026-07-07 · Source
Requirements
- Plumbing permit required for interior plumbing repair/replacement, new/replacement gas yard lines, new gas appliances, water heater fuel-type changes, and water/sewer yard line repair or replacement
- Governed by the 2018 IRC plumbing provisions as adopted by the City of Eloy
- Correct ROC license class must be listed for the specific plumbing work being performed
- Gas repairs require BTU ratings and total developed length of piping at all gas appliances; gas yard line work requires dielectric union and house-side shutoff details
- Water heater replacement includes a processing fee; storage-tank water heaters require a drain pan and drain line except where no drain is readily available for a replacement unit
Required documents
- RequiredCity of Eloy Building Permit Application (Plumbing)Submitted through the iworq electronic permit portal
- RequiredMinimal Plumbing Permit Only ChecklistCity of Eloy checklist (rev. 05/25/2026) covering interior plumbing repair/replace, gas yard lines, new gas appliances, water heater changes, and water/sewer yard line repair
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Issuance of each plumbing permit | $24.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Plumbing Permit Fees — Table 1-D |
| Supplemental permit (original not expired/cancelled/finaled) | $7.25 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Water Heater Replacement per Unit (includes processing fee) — Residential (R-3) | $45.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Water Heater Replacement per Unit (includes processing fee) — All others | $50.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Each plumbing fixture or trap (or set of fixtures on one trap) | $9.80 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Fixtures and Vents |
| Each building sewer / trailer park sewer (including repairs) | $24.65 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Sewers/Disposal Systems |
| Gas piping system, 1-5 outlets | $6.15 (plus $1.10 per additional outlet over 5) | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Gas Piping Systems |
| Gas service permit, hook up to existing gas line | $30.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations in Eloy, governed by the 2018 International Mechanical Code (IMC) as adopted by the City. New/replacement HVAC must meet the City's amended minimum efficiency thresholds (16 SEER, 78%/80% AFUE).
Verified 2026-07-07 · Source
Requirements
- Mechanical permit required for new heating/AC units, new locations or ductwork/curbing, fireplace inserts/replacement, firepits/BBQs/outdoor kitchens with gas connections, and new or replacement wall/ground-mounted equipment
- Governed by the 2018 IMC as adopted by the City of Eloy
- New and replacement HVAC equipment must be sized per ACCA Manual J, S, and D (load calculation, equipment selection, duct design); minimum 16 SEER for air conditioning equipment; minimum 78% AFUE (weatherized) / 80% AFUE (non-weatherized) for gas heating equipment
- New rooftop or attic-space units require a Roof System Confirmation (sealed engineer letter or truss manufacturer verification letter) and RESCheck for all new mechanical units
- Correct ROC license class must be listed for the specific mechanical work being performed
Required documents
- RequiredCity of Eloy Building Permit Application (Mechanical)Submitted through the iworq electronic permit portal
- RequiredMinimal Mechanical Permit Only ChecklistCity of Eloy checklist (rev. 05/25/2026) covering new heating/AC units, fireplace inserts, firepits/outdoor kitchens with gas, and wall/ground-mounted equipment
- RequiredManual J, S, and D Load CalculationsRequired for sizing new or replacement HVAC equipment and duct design
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Issuance of Mechanical Permit | $30.00 plus additional fee per item constructed/installed | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Mechanical Permit Fees |
| Supplemental permit (original not expired/cancelled/finaled) | $9.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| HVAC Change-outs per unit excluding ductwork (includes plan review fee) — Residential (R-3) | $120.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| HVAC Change-outs per unit excluding ductwork (includes plan review fee) — All others | $90.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Combination units (heating and cooling) — Residential (R-3) | $150.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Combination units (heating and cooling) — All others | $135.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| If ductwork is being replaced (additional) | $180.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Air Conditioning, Single-Family (per unit, with or without ductwork including associated electrical work) | $25.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Air Conditioning unit fee |
| Installation/relocation of forced-air or gravity furnace/burner, up to 100,000 Btu/h | $14.80 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule (over 100,000 Btu/h is $18.20) |
Re-Roofing Permit
Required for residential re-roofing in Eloy only when 100% of the roof sheathing is being replaced; if 50% or less of the sheathing is replaced, no permit is required. Billed as a flat fee for one- and two-dwelling structures.
Reviewed 2026-07-07 · Source
Requirements
- A roofing permit is required only if 100% of the roof sheathing is being replaced; if 50% or less of the sheathing is being replaced, no permit is required (a narrow middle ground between 50% and 100% sheathing replacement is not explicitly addressed in the published fee-schedule language)
- Applies to one- and two-dwelling (residential) structures per the published flat-fee category
- Governed by 2018 IBC/IRC roofing provisions as adopted by the City of Eloy
Required documents
- RequiredCity of Eloy Building Permit Application (Re-Roof)Submitted through the iworq electronic permit portal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-Roof (One- and Two-Dwelling Structures Only) — roofing permit when 100% of roof sheathing is being replaced | $180.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule; no permit required if 50% or less of the roof sheathing is being replaced |
Residential Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of rooftop residential solar photovoltaic systems on existing residential (R-3) buildings in Eloy. Governed by the 2018 IRC/IECC solar-ready provisions and the 2017 NEC as adopted by the City, with a dedicated Solar System Minimum Submittal Checklist.
Verified 2026-07-07 · Source
Requirements
- Governed by the 2018 IRC (Appendix RA103, Solar-Ready Provisions) and 2017 NEC as adopted by the City of Eloy
- Cover sheet, site plan, solar plans (roof layout with fire pathways, roof support/racking detail, placard/label locations, one-line diagram), and electrical plan (battery install information, equipment specs) required, sealed by an Arizona-registered engineer or architect
- Structural design analysis for panel modules and mounting system required for residential systems built prior to 2021; all commercial systems require a sealed structural analysis regardless of build date
- Correct ROC license class must be listed on the application for the work being performed
- Fee is calculated per system, up to and including 10kW, for residential (R-3) buildings
Required documents
- RequiredCity of Eloy Building Permit Application (Solar)Submitted through the iworq electronic permit portal
- RequiredResidential Solar System Permit ChecklistCity of Eloy checklist (rev. 05/25/2026) covering cover sheet, site plan, solar plans, and electrical plan requirements, all sealed by an Arizona-registered engineer or architect
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Photovoltaic Systems on Existing Residential (R-3) Buildings, per system 10kW or less — Building Permit | $135.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule (Resolution No. 26-1643, eff. 2/16/2026), 'FY 2025-2026 Rates and Fees' column, no override in 'Amended' column. Corrected 2026-07-20: re-fetched the raw PDF directly (WebFetch's summarizer had misreported it as corrupted) and visually confirmed $135.00 per system, not the previously transcribed $60.00. |
| Residential Photovoltaic Systems on Existing Residential (R-3) Buildings, per system 10kW or less — Plan Review | $60.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule. Corrected 2026-07-20 (see Building Permit line note) — $60.00, not the previously transcribed $30.00. |
EV Charger / EVSE Permit (Dedicated Fee Category — Amount Unpublished)
VerifiedRequired for installation of a Level 2 (or higher) electric vehicle charger/EVSE in Eloy, governed by the 2017 NEC (Article 625) as adopted by the City. Eloy is one of the few jurisdictions in this corpus with a NAMED, dedicated fee-schedule line item for EV chargers: 'Electrical Vehicle Charging Stations (Residential) - per station' appears as its own row in the City's Consolidated Rate and Fee Schedule, immediately alongside the dedicated Residential Photovoltaic Systems line items. However, unlike the PV rows (which carry published $60.00/$30.00 figures), the EV Charging Stations row's fee amount cell is genuinely BLANK/unpublished in both the January 12, 2026 and the February 16, 2026 amended versions of the schedule (independently checked both PDFs; identical blank cell in both). Separately, the City's own Minimal Electrical Only Permit Checklist (rev. 05/25/2026) explicitly lists 'EV charger' among the equipment types requiring Load Calculations under the general 'Adding Circuits or Outlets' electrical-permit submittal category, confirming EV chargers are permitted work but do not (yet) have a published dollar figure of their own. Re-chased 2026-07-20: downloaded the live PDF directly and rendered the exact table page (p.4 of the Amended Consolidated Rates and Fees, dated November 12, 2025) as an image for direct visual inspection (not just automated text extraction, which can misalign multi-column PDF tables) -- independently re-confirmed the 'Electrical Vehicle Charging Stations (Residential) -per station' row has a genuinely empty rate cell in both the FY 2025-2026 and Amended FY 2025-2026 columns, while every neighboring row (Photovoltaic, Demolition, Temporary Trailers, Generators, Mobile Home hook-up) carries a populated dollar figure. This is a confirmed, real gap in the City's own document, not an extraction artifact.
Verified 2026-07-20 · Source
Requirements
- Electrical permit required for the EV charger circuit installation, filed via the City's iworq electronic permit portal
- Load Calculations required for the EV charger circuit, per the City's Minimal Electrical Only Permit Checklist (rev. 05/25/2026), 'Adding Circuits or Outlets' section
- Electrical schematic/floor plan showing new and existing circuit/outlet locations, circuit amperage, and GFCI/AFCI requirements
- Correct ROC (Registrar of Contractors) license class must be listed for the electrical work being performed
- Governed by the 2017 NEC as adopted by the City of Eloy, including Article 625 (Electric Vehicle Power Transfer System)
Required documents
- RequiredCity of Eloy Building Permit Application (Electrical)Submitted through the iworq electronic permit portal
- RequiredMinimal Electrical Only Permit ChecklistCity of Eloy checklist (rev. 05/25/2026) explicitly listing 'EV charger' as requiring Load Calculations under 'Adding Circuits or Outlets'
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Vehicle Charging Stations (Residential) — per station | Not published (blank fee cell) | City of Eloy Amended Consolidated Rate and Fee Schedule — this named line item appears in its own row (immediately adjacent to the Residential Photovoltaic Systems rows) in BOTH the January 12, 2026 and the February 16, 2026 amended versions of the schedule, but the dollar-amount cell for this specific row is empty in both, unlike every neighboring row. This is a genuine documented gap in the City's own published schedule, not an inferred or omitted figure by this corpus. |
| Issuance of each electrical permit | $30.00 plus additional fee per item constructed/installed | City of Eloy Amended Consolidated Rate and Fee Schedule, Electrical Permit Fees — the general issuance fee would apply in addition to whatever the (currently unpublished) EV-station fee turns out to be |
Demolition Permit
VerifiedRequired for demolition of residential and other structures in Eloy. Billed as a flat fee tiered by structure type (accessory/garage, single-family residence, or other), per the City's Consolidated Rate and Fee Schedule.
Verified 2026-07-07 · Source
Requirements
- Building permit required before demolishing a structure within Eloy city limits
- Fee is tiered by structure category: residential accessory building/garage, single-family residence, or structures other than residential single-family
- Pinal County Dust Control Permit coordination expected given the City's location in the West Pinal Nonattainment Area
- Project is not legally complete until an approved final inspection has occurred
Required documents
- RequiredCity of Eloy Building Permit Application (Demolition)Submitted through the iworq electronic permit portal
- RequiredSite PlanShowing the structure(s) to be demolished and other existing structures on the parcel
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition of Buildings — Residential accessory building or garage, per structure | $90.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Demolition of Buildings — Single-family residence, per structure | $90.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
| Demolition of Buildings — Structures other than residential single-family, per structure | $540.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule |
Sign Permit
VerifiedRequired for permanent and temporary commercial/business signage in Eloy, administered by the Community Development Department using a dedicated Sign Permit Application separate from the general Building Permit Application. Plan review is billed at 65% of the calculated building permit fee and the permit fee itself is based on total sign(s)/installation valuation using the same Building Permit Fee valuation table used for building permits.
Verified 2026-07-23 · Source
Requirements
- A Sign Permit Application is required before installing permanent signage: attached/wall-mounted, projecting, awning/canopy, freeway pylon, window, electronic message center, or gas-filled signs (building signs), and freestanding/monument signs
- Temporary signage (banner signs, A-frame signs, yard signs, sign walkers) also requires identifying sign type, quantity, and location on the same Sign Permit Application
- Site Plan/Suite Layout Plan showing sign locations, dimensions, aggregate sign area, and street frontage widths required for all applications; freestanding/monument signs additionally require property lines, easements, and sight visibility triangles shown
- Freestanding/monument sign structural and footing details, and any new electrical circuitry plans to accommodate the sign, must be sealed by an Arizona-registered engineer/architect; if existing electrical circuitry will be used instead, the cover sheet must state 'No new electrical circuitry is required or will be provided for the sign(s)'
- Fascia modification or exterior color changes to a building or a fuel/gas/energy station canopy are NOT allowed, approved, or permitted through a Sign Permit — these require a separate Minor Site Plan Application, and building elevations submitted with a sign application must match previously-approved Site Plan elevations
- 'Sign' is defined per Zoning Ordinance Section 21-9-1 to include any visual element or device designed to attract attention or convey information for a business/service/product/organization, including logos, banners, balloons, streamers, inflatable structures, projected picture signs, and holographic projection signs
- Property Owner Authorization (or a notarized Property Owner's Permission Form) is required when the applicant is an agent (lawyer, planner, architect, landscape architect, etc.) rather than the property owner
- Sign Permit Application expires 180 days after the last plan submittal
Required documents
- RequiredSign Permit ApplicationCity of Eloy Community Development Department application (525 North C Street, Suite 102); includes an attached notarized Property Owner's Permission Form for use when an agent applies on the owner's behalf
- RequiredSign Permit Application ChecklistCity of Eloy checklist (rev. 12/21/2024) covering Part I (general requirements: application, fees, property owner authorization) and Part II (site plan, building elevations, color renderings, section details, sign structure/footing details, electrical plans, sign type/quantity for both permanent and temporary signage)
- RequiredSite Plan / Suite Layout PlanLocation, dimensions, and aggregate area of all proposed and existing signs; property lines/easements/sight visibility triangles for freestanding signs
- RequiredColor Sign Elevations and RenderingsRendering/photo rendering of the sign on the building/suite frontage or as a freestanding structure, with materials, paint colors, and illumination methods called out
- OptionalSign Structure and Footing Details / Electrical PlansStructural and footing calculations for freestanding/monument signs, and electrical plans for any new circuitry — both sealed by an Arizona Registrant
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Review Fee | 65% of the calculated building permit fee | City of Eloy Sign Permit Application Checklist (rev. 12/21/2024); submittals requiring three or more reviews are charged at the hourly rate and administrative fee specified in the City's Consolidated Rate and Fee Schedule ($135/hour, 1-hour minimum, plus $35 per additional review, per the general Plan Review Fee provisions) |
| Permit Fee (Permanent Signs) | Based on total sign(s) and installation valuation, calculated and charged at time of permit issuance | City of Eloy Sign Permit Application Checklist (rev. 12/21/2024); uses the same Residential and Commercial Permit Fees valuation table published in the City's Amended 2025-2026 Consolidated Rate and Fee Schedule (e.g., $60.00 minimum for $1-$500 valuation, scaling thereafter), not a separate sign-specific fee table |
Fire Sprinkler & Fire Alarm Permit (Eloy Fire District)
VerifiedEloy is served by the independent Eloy Fire District (formed August 19, 1946, predating the City of Eloy's own incorporation; serves over 10,300 residents across 55+ square miles), which conducts its own plan review, permitting, invoicing, and inspections for fire protection systems directly through its Fire Marshal's office — a separate process from the City of Eloy Community Development Building Safety Division. A single 'Operational/Special Use Permit' application covers fire alarm systems and automatic fire sprinkler systems (along with kitchen hood suppression, standpipes, and other fire protection systems), but the Fire District publishes genuinely distinct fee line items for each: a flat fee for fire alarm systems and a plan-review-plus-head-count fee structure for sprinkler systems. Governed by the 2018 International Codes and referenced NFPA standards as adopted by the Eloy Fire District.
Verified 2026-07-23 · Source
Requirements
- A dedicated Eloy Fire District permit (submitted to the Fire Marshal's office, separate from the City's iworq building-permit portal) is required before installing an automatic fire sprinkler system, a fire alarm system, a fire pump, standpipes, an automatic kitchen hood extinguishing system, or an above-ground fuel storage tank
- Submit the Eloy Fire District permit application, a one-page site plan, and a complete set of plans/drawings to the Fire Marshal (520-466-3544) — either one electronic set of plans or two paper sets; re-submittals of approved plans should include the plan name or number
- Commercial projects must include documentation for all required fire protection systems (sprinklers, standpipes, fire alarms, kitchen suppression) even if a system is deferred, including calculations and component cut sheets
- All necessary Eloy Fire District permits must be obtained BEFORE commencing construction; starting work without the required permit results in doubled permit and review fees
- A copy of the approved Eloy Fire District Permit is a required submittal item on the corresponding City of Eloy building permit application (confirmed on the City's 2018 IRC Minimum Submittal Checklist, Part III)
- Permits expire if work does not begin within 180 days, or if work is suspended for 180 consecutive days; written extension requests are accepted
- Ongoing fire & life safety system inspection/maintenance reports (for fire sprinkler systems, fire alarm systems, kitchen hood suppression, standpipes, fire pumps, and other tracked systems) must be submitted electronically via The Compliance Engine (contact Brycer, (630) 413-9511, for training/support)
Required documents
- RequiredEloy Fire District Operational/Special Use Permit ApplicationLists Fire Alarm, Fire Extinguishing System (cooking), Sprinkler Plan Review, Fire Suppression System (by head count), Site Plan/Plat Review, and Above Ground Fuel Storage Tank as separate fee line items on one shared form; requires construction address, parcel number, occupancy class/structure type, and owner/contractor information
- RequiredOne-Page Site PlanRequired with every Eloy Fire District permit application per the Fire Permit and Compliance Guide
- RequiredComplete Set of Plans/DrawingsOne electronic set or two paper sets; commercial projects must include calculations and component cut sheets for sprinkler, standpipe, fire alarm, and kitchen suppression systems, even if deferred
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Alarm System (Construction Permit) | $250.00 | Eloy Fire District Permit Fees (2024); includes system plans review and acceptance testing. Verified against both the Fire District's published fee schedule and its own Operational/Special Use Permit application form, which lists 'Fire Alarm' as a $250.00 line item. |
| Automatic Fire Sprinkler System — Plan Review | $100.00 per hour (2-hour minimum) | Eloy Fire District Permit Fees (2024) |
| Automatic Fire Sprinkler System — Permit Fee, up to 100 heads | $100.00 | Eloy Fire District Permit Fees (2024) |
| Automatic Fire Sprinkler System — Permit Fee, 101-500 heads | $250.00 | Eloy Fire District Permit Fees (2024); each additional 100 heads above 500 adds $100.00 |
| Automatic Hood Extinguishing System (Kitchen Suppression) | $250.00 | Eloy Fire District Permit Fees (2024); includes system plans review and acceptance testing |
| Site Plan Review (general, applies when required for the project) | $100.00 per hour (2-hour minimum) | Eloy Fire District Permit Fees (2024); Access Roads review is included within this Site Plan Review fee |
| Late-permit penalty | Permit and review fees are doubled | Eloy Fire District Permit Fees (2024) and Fire Permit and Compliance Guide — applies when construction begins before the required Fire District permit is obtained |
Certificate of Occupancy / Change of Occupancy
VerifiedCovers two related City of Eloy processes administered by the Community Development / Building Safety Division: (1) the standard Certificate of Occupancy (full, or temporary/partial/conditional) issued at completion of a building permit project, requiring sign-off from the City Engineer, Planning/Zoning, the Eloy Fire District, Water/Sewer, and the Water Department before the Building Inspector and Chief Building Official issue it; and (2) the standalone 'C of O / Occupancy Change' administrative process (also covering Home Occupation) for an existing building changing tenant, business name, or use where no work requiring a building permit (mechanical, plumbing, electrical, partitions, signs, etc.) is being performed.
Verified 2026-07-23 · Source
Requirements
- A structure may not be used, occupied, or furnished in whole or in part prior to issuance of the Certificate of Occupancy
- A FULL Certificate of Occupancy requires the entire project to be completed with no conditions; a TEMPORARY Certificate of Occupancy may be issued once a published minimum item list is met (parking lots installed, roofing/siding complete, heating/cooling installed, electric outlets/panels/light fixtures installed, address visible from the street, water/plumbing fixtures in, smoke detectors and sprinklers operative, handrails/guardrails, emergency lights, fire-rated doors, fire alarms operative, exit signs lit, exit hardware installed, fire extinguishers if required, handicap items installed, and at least 85% of landscaping complete)
- All department approvals (City Engineer, Planning/Zoning, Eloy Fire District, Water/Sewer, Water Department) must be received before the Building Inspector can conduct the final inspection; utility clearance and the Certificate of Occupancy cannot be issued without all department approvals
- The 'C of O / Occupancy Change' form is used for a Certificate of Occupancy, a Home Occupation, or a Change of Occupancy (check one box); it requires property owner and renter/tenant information, square footage of floor area, prior use vs. proposed use, whether hazardous materials are stored on site, and whether an existing fire sprinkler system is present
- Signing the Change of Occupancy form certifies that no changes or alterations requiring a building permit (mechanical, plumbing, electrical, partitions, signs, etc.) are being made to the structure; any sign changes require separate approvals and permits regardless
- Two copies of a floor plan are required at time of Change of Occupancy application
Required documents
- RequiredCertificate of Occupancy ApplicationCity of Eloy form routing sign-off through City Engineer (520-466-3082), Planning/Zoning (520-466-2578), Fire District (520-466-3544), Water/Sewer (520-464-1392), and Water Dept. (520-466-9201) before Building Inspector and Chief Building Official final signatures
- RequiredC of O / Occupancy Change FormCity of Eloy Community Development Department / Building Safety form used for a Certificate of Occupancy, Home Occupation, or Change of Occupancy (existing building, new tenant/use, no permitted work) — includes prior/proposed use, hazardous materials disclosure, and existing fire sprinkler system disclosure
- RequiredFloor Plan (2 copies)Required at time of Change of Occupancy application submittal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Certificate of Occupancy — non-residential | $60.00 per building | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule (effective 2/16/2026); fee collected at time of permit issuance. Visually confirmed on the fee-schedule PDF page image (pdftotext -layout had bled an unrelated row's figure into this line; the source PDF page image itself clearly shows $60.00 per building for this row). |
| Certificate of Occupancy — non-residential tenant improvement | $30.00 per non-residential tenant | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule; fee collected at time of permit issuance. Visually confirmed on the fee-schedule PDF page image. |
| Certificate of Occupancy — R-3 single-family | $30.00 per building | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule; same figure documented on the residential-building-permit entry in this corpus |
| Temporary, Partial, or Conditional Certificate of Occupancy — refundable compliance deposit | Greater of $1,500.00 or the sum of all permit fees issued to the project (foundation, building, electrical, mechanical, and plumbing) | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule; deposit (cash or irrevocable letter of credit) paid to the City before staff conducts the related inspection, generally refunded within 30 days of Certificate of Occupancy issuance |
| Temporary, Partial, or Conditional Certificate of Occupancy — processing fee | $180.00 | City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule; charged in addition to the compliance deposit, at the time each certificate is applied for |
| Change of Occupancy (existing building, no permitted work) — administrative processing fee | Not found | Exhausted the City's Amended 2025-2026 Consolidated Rate and Fee Schedule (all 19 pages checked page-by-page), the Building Permits/checklists/forms page, and the Community Development page/site search — no dedicated fee line item for the standalone 'Change of Occupancy' or 'Home Occupation' form was found distinct from the Certificate of Occupancy fees above. This appears to be a no-fee administrative process when no building-permit-triggering work is involved, but that is not explicitly stated anywhere found; omitted rather than invented. Confirm directly with Community Development (520-466-2578). |
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eloy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.