Version history — Eloy, Arizona
This is PermitBase’s own verified record for Eloy, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Eloy’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-21Current record
- Eloy, Arizona — adopted-codes record updated
- Eloy, Arizona — fee schedule re-verified across 12 permit types
- 2026-07-29Superseded
- Eloy, Arizona — Commercial Building Permit record added
- 2026-07-23Superseded
- Eloy, Arizona — Sign Permit record added
- Eloy, Arizona — Fire Sprinkler & Fire Alarm Permit (Eloy Fire District) record added
- Eloy, Arizona — Certificate of Occupancy / Change of Occupancy record added
- 2026-07-20Superseded
- Eloy, Arizona — Residential Solar Photovoltaic (PV) Permit fee record updated: $60.00 → $135.00
- Eloy, Arizona — Residential Solar Photovoltaic (PV) Permit fee record updated: $30.00 → $60.00
- Eloy, Arizona — EV Charger / EVSE Permit (Dedicated Fee Category — Amount Unpublished) record added
- 2026-07-07Initial record — coverage of Eloy began