This is PermitBase’s published record for Camp Verde as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Camp Verde building permits
VerifiedCamp Verde, Arizona — as published 2026-07-06.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Single-Family Home)
VerifiedRequired for new one- and two-family dwelling construction in the Town of Camp Verde. Reviewed against the 2024 IRC as adopted and amended by the Town via Ordinance 2026-A512 (effective February 26, 2026). Applications are submitted through the GovWell One-Stop Permitting Portal.
Verified 2026-07-06 · Source
Requirements
- Building permit required for new single-family and two-family dwelling construction within Camp Verde town limits, following a required Residential Zoning Clearance ($190, includes manufactured/factory-built/modular homes)
- Plans must comply with the 2024 IRC and Town of Camp Verde amendments, including the reduced 100 mph wind-speed design criteria (Risk Category I) adopted under Ordinance 2026-A512
- Valuation for new single/multi-family residences (excluding mobile/manufactured homes) is the applicant's valuation or the ICC Building Valuation Data (BVD) Table figure, whichever is greater
- A deposit equal to the Building Plan Review Fee is due at submittal ($250 of the deposit is non-refundable if the application is cancelled/withdrawn before plan review begins)
- Submittal via the GovWell One-Stop Online Permitting Portal (app.govwelltech.com/camp-verde)
Required documents
- RequiredBuilding Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredSite/Plot PlanLot dimensions, easements, setbacks, and structure locations
- RequiredConstruction Drawings and Structural CalculationsComplete construction document set referencing the Town's adopted 2024 IRC/IBC design criteria
- OptionalGeotechnical/Soils ReportRequired where site conditions (e.g., expansive soil) warrant per Building Official discretion
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation | $47.00 ($1-$500); $47.00 + $4.25 per additional $100 to $2,000; $108.00 + $16.50 per additional $1,000 to $25,000; $476.00 + $12.50 per additional $1,000 to $50,000; $784.00 + $9.25 per additional $1,000 to $100,000; $1,217.00 + $7.25 per additional $1,000 to $500,000; $3,997.00 + $6.25 per additional $1,000 to $1,000,000; $6,982.00 + $5.25 per additional $1,000 above $1,000,000 | Town of Camp Verde FY26 Fee Schedule, Community Development section, Building Permit Fees (Total Valuation table), effective 7/1/25 |
| Building Plan Review Fee (First Floorplan Review) | 65% of the calculated Building Permit Fee | Town of Camp Verde FY26 Fee Schedule, Other Building Fees; due at submittal as part of the required deposit |
| Master Building Plan Review Fee (Each additional floorplan review under same approved plan) | $180.00 | Town of Camp Verde FY26 Fee Schedule, Other Building Fees |
| Residential Zoning Clearance (single family, incl. Manufactured/Factory-Built/Modular) | $190.00 | Town of Camp Verde FY26 Fee Schedule, Community Development section, Zoning Clearance for Building Permits — prerequisite to the building permit |
| Deposit (New Single/Multi-Family Residence) | Equal to the Building Plan Review Fee ($250 non-refundable if cancelled/withdrawn before plan review) | Town of Camp Verde FY26 Fee Schedule, Deposits for Building Permit Applications; due at submittal, non-refundable |
Residential Addition / Remodel / Accessory Structure Permit
VerifiedRequired for room additions, remodels, and non-habitable accessory structures on existing one- and two-family dwellings in the Town of Camp Verde, reviewed against the 2024 IRC as adopted and amended (Ordinance 2026-A512, effective February 26, 2026).
Verified 2026-07-06 · Source
Requirements
- Building permit required for room additions, structural remodels, and detached/attached accessory structures over the Town's zoning-clearance-only threshold (residential zoning clearances alone cover structures under 200 sq ft and fences under 6 ft)
- Requires a Residential Remodel/Accessory Structure Zoning Clearance ($90 for up to 2 structures, plus $30 per additional structure) before the building permit is issued
- Valuation for accessory buildings/structures and alterations/remodels of existing structures is the applicant's valuation or the calculated valuation using the itemized per-square-foot values in the FY26 Fee Schedule (barn, shed, carport, gazebo, deck, enclosed porch, etc.), whichever is greater
- Where no additional floor area or roof coverage is created (e.g., converting a patio/garage to habitable space), valuation is the difference in valuation between the two occupancies plus utilities
- Plans must comply with Town of Camp Verde Design Criteria (100 mph wind, Risk Category I, per Ordinance 2026-A512)
Required documents
- RequiredBuilding Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredSite/Plot PlanShowing existing structure, addition/accessory-structure footprint, and setbacks
- RequiredConstruction DrawingsStructural details for the addition/remodel/accessory-structure scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Detached Residential Accessory Structures (per sq ft, by type) | Barn $25.00; Shade/Mare Motel $30.00; Greenhouse $21.00; Storage Shed (over 200 sq ft) $25.00; Carport $19.00; Gazebo/Ramada $32.00; Covered/Open Elevated Deck $30.00; Enclosed Porch (habitable) $100.00; Stairs $14.00 | Town of Camp Verde FY26 Fee Schedule, Valuation Data — Detached Residential Accessory Buildings/Structures |
| Attached Residential Accessory Structures (per sq ft, by type) | Greenhouse $21.00; Storage Shed $25.00; Carport $19.00; Balcony $25.00; Covered Patio at Grade $25.00; Covered/Open Elevated Deck $30.00; Screened Porch $10.00; Enclosed Porch (habitable) $80.00; Pre-Fab Canvas/Metal Awning $8.00; Stairs $14.00 | Town of Camp Verde FY26 Fee Schedule, Valuation Data — Attached Residential Accessory Buildings/Structures |
| Residential Alteration/Remodel (per sq ft, by scope) | Enclose Exterior Wall Opening $20.00; Add/Remove Interior Partition $30.00; Install Window/Sliding Glass Door $12.00; Install Exterior Siding $9.00; Plaster/Stucco (no structural change) $9.00; Add Stone/Brick Veneer $18.00 | Town of Camp Verde FY26 Fee Schedule, Valuation Data — Residential Alteration/Remodel |
| Residential Remodel / Accessory Structure Zoning Clearance | $90.00 (up to 2 structures) + $30.00 per additional structure | Town of Camp Verde FY26 Fee Schedule, Zoning Clearance for Building Permits |
| Building Plan Review Fee | 65% of the calculated Building Permit Fee | Town of Camp Verde FY26 Fee Schedule, Other Building Fees |
Residential Over-the-Counter (OTC) Permit — Electrical / Mechanical / Plumbing / Building
VerifiedFor minor residential building, electrical, mechanical, or plumbing projects (e.g., electrical service upgrades, yard gas lines, water heater installations) in the Town of Camp Verde, issued on a fast-track, minimal-plan-review basis relative to standard building permits.
Verified 2026-07-06 · Source
Requirements
- Available for minor residential building, electrical, mechanical, or plumbing projects such as electrical service upgrades, yard gas lines, and hot water heater installations
- Governed by the 2023 NEC, 2024 IPC, 2024 IMC, and 2024 IFGC as adopted by the Town of Camp Verde (Ordinance 2026-A512, effective 02-26-2026)
- Combo permits (any combination of electrical/mechanical/plumbing/building OTC scopes) are available under a single application
- Apply via the GovWell One-Stop Permitting Portal
Required documents
- RequiredOver-the-Counter Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredManufacturer Specifications / Cut SheetsRequired for equipment being installed (e.g., water heater, HVAC unit)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| OTC Electrical | $90.00 | Town of Camp Verde FY26 Fee Schedule, Community Development section, Residential Over the Counter Permits |
| OTC Mechanical | $90.00 | Town of Camp Verde FY26 Fee Schedule, Community Development section |
| OTC Plumbing | $90.00 | Town of Camp Verde FY26 Fee Schedule, Community Development section |
| OTC Building | $90.00 | Town of Camp Verde FY26 Fee Schedule, Community Development section |
| OTC Combo (any combination of the above) | $90.00 flat fee plus $30.00 for each added OTC permit (includes 2 inspections) | Town of Camp Verde FY26 Fee Schedule, Community Development section |
Residential Solar Photovoltaic (PV) / BESS / Wind Turbine / Generator Permit
VerifiedRequired for installation of rooftop or ground-mounted residential solar photovoltaic systems, Battery Energy Storage Systems (BESS), wind turbines, and generators in the Town of Camp Verde. Governed by the 2018 IFC Solar Photovoltaic Requirements referenced by the Town and the 2023 NEC as adopted (Ordinance 2026-A512).
Verified 2026-07-06 · Source
Requirements
- Governed by the 2023 NEC and the Town's referenced 2018 IFC Solar Photovoltaic Requirements
- Equipment cut sheets with UL Listing information and Manufacturer's Installation Instructions must be included with construction documents
- Systems up to 15kWh AC/DC (residential or commercial) are billed at a flat fee plus Zoning & Fire Marshal plan review fees
- Systems over 15kWh AC/DC are billed at 20% of applicant valuation or $2.75/watt (whichever is greater) plus Building, Zoning & Fire Marshal plan review fees
- Apply via the GovWell One-Stop Permitting Portal
Required documents
- RequiredSolar/BESS Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredEquipment Cut Sheets with UL ListingRequired for all PV panels, inverters, batteries (BESS), or generator equipment, with Manufacturer's Installation Instructions
- RequiredSite Plan / Roof or Ground-Mount LayoutShows array location, racking, and 3-line electrical diagram
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar/BESS/Wind Turbine/Generator, Residential or Commercial — Up to 15kWh AC/DC | $206.00 flat fee, plus Zoning & Fire Marshal plan review fees | Town of Camp Verde FY26 Fee Schedule, Community Development section, Solar Installation, Battery Energy Storage Systems (BESS), Wind Turbines, Generators |
| Solar/BESS, Residential or Commercial — Over 15kWh AC/DC | 20% of applicant valuation or $2.75/watt (whichever is greater), plus Building, Zoning & Fire Marshal plan review fees | Town of Camp Verde FY26 Fee Schedule, Community Development section |
Manufactured / Modular / Factory-Built Home Installation Permit
VerifiedRequired for placement of Factory Built Buildings, Manufactured Homes, and Mobile Homes within the incorporated area of the Town of Camp Verde. The Town enforces installation standards for these structures under an Intergovernmental Agreement (IGA) with the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (OMH).
Verified 2026-07-06 · Source
Requirements
- Installation permit required in the incorporated Town of Camp Verde for placement of Factory Built Buildings, Manufactured Homes, and Mobile Homes
- Enforced under an Intergovernmental Agreement (IGA) between the Town and the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (OMH), pursuant to A.A.C. §R4-34-501 and §R4-34-801
- A Residential Zoning Clearance is required (single-family dwelling category, $190, which explicitly includes Manufactured and Factory-Built/Modular Buildings)
- Manufactured Housing Skirting billed separately per linear foot
- Includes three (3) inspections in the base OMH-schedule fee for the home set/factory-built installation
Required documents
- RequiredManufactured/Modular Home Installation Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredFloor Plans and Foundation DetailsManufacturer-provided floor plan and Town/OMH-compliant foundation/tie-down details
- RequiredOMH Insignia / Installation DocumentationManufactured home rating and installation standards documentation per the Town-OMH intergovernmental agreement
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Manufactured Home Set (includes 3 inspections) | Per Arizona Office of Manufactured Housing (OMH) Fee Schedule | Town of Camp Verde FY26 Fee Schedule, Community Development section, Mobile/Manufactured Housing Permits — fee set by AZ OMH and adopted by the Town via IGA per A.A.C. §R4-34-501/§R4-34-801, not independently set by the Town |
| Residential Manufactured Home — Plan Review | $180.00 | Town of Camp Verde FY26 Fee Schedule, Community Development section |
| Residential/Commercial Factory Built/Modular Building (includes 3 inspections) | Per Arizona OMH Fee Schedule | Town of Camp Verde FY26 Fee Schedule, Community Development section |
| Residential/Commercial Factory Built/Modular — Plan Review | $180.00 | Town of Camp Verde FY26 Fee Schedule, Community Development section |
| Manufactured Housing Skirting (no retaining/surcharge) | $10.00 per every 10 linear feet | Town of Camp Verde FY26 Fee Schedule, Community Development section |
| Residential Zoning Clearance (single family dwelling, incl. Manufactured/Factory-Built) | $190.00 | Town of Camp Verde FY26 Fee Schedule, Community Development section, Zoning Clearance for Building Permits |
Demolition Permit
VerifiedRequired for demolition of any existing residential or commercial structure in the Town of Camp Verde, billed as a flat fee based on the number of structures on the same Assessor's Parcel Number.
Verified 2026-07-06 · Source
Requirements
- Building permit required before demolishing a residential or commercial structure within Camp Verde town limits
- Site plan required showing the structure(s) to be demolished and remaining structures on the parcel
- Fee scales by number of structures on the same Assessor's Parcel Number, not by valuation
- Apply via the GovWell One-Stop Permitting Portal
Required documents
- RequiredDemolition Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredSite PlanShowing the structure(s) to be demolished and remaining structures on the parcel
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition — Up to 2 structures on same Assessor's Parcel Number | $90.00 | Town of Camp Verde FY26 Fee Schedule, Community Development section, Demolition of Any Existing Structure |
| Demolition — More than 2 structures on same Assessor's Parcel Number | $90.00 for the first 2 structures, plus $30.00 for each structure thereafter | Town of Camp Verde FY26 Fee Schedule, Community Development section |
Commercial Building Permit (New Building / Tenant Improvement)
VerifiedRequired for new commercial buildings, commercial accessory structures, tenant improvements, and multi-family buildings in the Town of Camp Verde. Reviewed against the 2024 IBC as adopted and amended by the Town via Ordinance 2026-A512 (effective February 26, 2026).
Verified 2026-07-06 · Source
Requirements
- Building permit required for new commercial construction, commercial accessory structures, tenant improvements, and multi-family buildings within Camp Verde town limits
- Requires a Commercial Zoning Clearance before permit issuance: $325 for new commercial (including Factory-Built/Modular) construction, or $110 (up to 2 structures, plus $30 each additional) for commercial remodel/accessory structures
- New commercial buildings and commercial accessory structures (new) are valued at the applicant's valuation or the ICC Building Valuation Data (BVD) Table, whichever is greater
- Commercial alteration/remodel of an existing structure (tenant improvements) is valued based on the bid price provided by a licensed commercial contractor, plus applicable plan review fees
- Commercial project deposits equal the sum of Building Plan Review, Engineer Plan Review, Fire Plan Review, and Sanitary Plan Review fees, plus the Zoning Clearance fee
- Contact the Community Development Department at (928) 554-0050 regarding whether a proposed commercial project may qualify for a Development Standards Review
Required documents
- RequiredCommercial Building Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredConstruction Drawings and Structural CalculationsComplete commercial construction document set referencing the Town's adopted 2024 IBC design criteria
- RequiredContractor Bid / Valuation DocumentationRequired for tenant improvement/remodel valuation basis
- OptionalSoils/Geotechnical ReportRequired for commercial grading or where expansive soil conditions apply
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation | Same Building Permit Fee table as new residential construction: $47.00 ($1-$500) scaling up to $6,982.00 + $5.25 per additional $1,000 above $1,000,000 | Town of Camp Verde FY26 Fee Schedule, Community Development section, Building Permit Fees (Total Valuation table) |
| Building Plan Review Fee | 65% of the calculated Building Permit Fee | Town of Camp Verde FY26 Fee Schedule, Other Building Fees |
| Commercial Zoning Clearance — New Commercial (incl. Factory-Built/Modular) | $325.00 | Town of Camp Verde FY26 Fee Schedule, Zoning Clearance for Building Permits |
| Commercial Zoning Clearance — Remodel/Accessory Structure | $110.00 (up to 2 structures) + $30.00 per additional structure | Town of Camp Verde FY26 Fee Schedule, Zoning Clearance for Building Permits |
| Development Standards Review — Commercial/Industrial | $2,500 plus $0.10/sq ft over 5,000 sq ft ($15,000 max), plus Fire Marshal Review Fee | Town of Camp Verde FY26 Fee Schedule, Community Development section (Land Use Applications) — applies where a commercial project qualifies for/requires this review track |
| Deposit (Commercial Projects) | Equal to Building Plan Review Fees + Engineer Plan Review Fees + Fire Plan Review Fees + Sanitary Plan Review Fees + Zoning Clearance Fees | Town of Camp Verde FY26 Fee Schedule, Deposits for Building Permit Applications; due at submittal, non-refundable |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Camp Verde building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.