This is PermitBase’s published record for Clarkdale as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Clarkdale building permits
VerifiedClarkdale, Arizona — as published 2026-07-06.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family and two-family dwelling construction in the Town of Clarkdale. Reviewed against the 2024 IRC and Town of Clarkdale amendments (Town Code Article 7-2). Applications are submitted by mail, email, or in person to the Community Development Department.
Verified 2026-07-06 · Source
Requirements
- Building permit required for new single-family and two-family dwelling construction within Clarkdale town limits
- Plans must comply with the 2024 IRC and Town of Clarkdale amendments, including Seismic Design Category C (amended R301.2.2.1)
- Construction must start within 180 days of the permit issue date; construction hours are limited to 6:00 a.m. to 9:00 p.m.
- Site plan required, drawn to a defined scale, showing size/location of new construction and existing structures, lot-line distances, grading/drainage, and utility line locations
- Application submitted via mail (PO Box 308, Clarkdale, AZ 86324), email (communitydevelopment@clarkdale.az.gov), or in person at 890 Main Street; application is reviewed for completeness prior to acceptance
- Applicant must disclose contractor licensing status (ROC license number and class) or claim an A.R.S. §32-1121A owner/builder or owner/developer exemption from contractor licensing
Required documents
- RequiredBuilding Permit ApplicationTown of Clarkdale Community Development Department Building Permit Application; includes applicant/owner/contractor information, project description, valuation, and office-use fee calculation fields
- RequiredSite/Plot PlanDrawn to a defined scale, showing lot dimensions, easements, setbacks, existing/proposed grading and drainage, utility line locations, and structure locations
- RequiredConstruction Drawings and Structural CalculationsConstruction documents prepared to Town-adopted code and design-criteria standards; special inspection reports (geotechnical, retaining wall, electrical/mechanical/plumbing per amended IBC 1705.21-23) required where applicable
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation | Calculated from ICC Building Safety Journal square-foot construction-cost tables (currently the AUGUST 2007 cost table) applied against Table 1-A, Building Permit Fees | Town of Clarkdale 'Notice of Intention to Amend the Townwide Fee Schedule' (posted 07/06/2026) confirms the August 2007 ICC valuation basis is the CURRENTLY adopted figure; a proposed update to the 2018 cost table is scheduled for Town Council action September 8, 2026 and is not yet in effect. Exact current Table 1-A dollar-bracket schedule (the fee-per-valuation-bracket table itself, as opposed to the underlying per-square-foot cost inputs) was not independently located in this review — confirmed gap, not an assumption. |
| Plan Review Fee | 65% of the calculated Building Permit Fee | Town of Clarkdale 'Notice of Intention to Amend the Townwide Fee Schedule' (confirmed unchanged between the current and proposed fee schedule versions); plan review fees are non-refundable per the Building Permit Application |
| Revised/Resubmitted Plans Review Fee | 20% of the plan review fee (as applicable) | Building Permit Application: 'A twenty percent plan review fee may be applied to revised plans.' |
| Permit Renewal After Expiration / One-Time Extension | One-half the amount required for a new permit for such work | Town of Clarkdale Town Code Article 7-1 (IBC)/Article 7-2 (IRC), Section 105.5/105.5.1 amendments |
Residential Addition / Remodel / Accessory Structure Permit
VerifiedRequired for room additions, structural remodels, decks, and accessory structures to existing one- and two-family dwellings in the Town of Clarkdale, reviewed against the 2024 IRC as adopted and amended by the Town (Town Code Article 7-2). Non-structural cosmetic remodels with no added square footage or plumbing/electrical/mechanical scope are exempt.
Verified 2026-07-06 · Source
Requirements
- Building permit required for room additions, decks over 200 sq ft or more than 30 inches above grade, structural remodels, and detached accessory structures exceeding the Town's small-shed exemption (50 sq ft / 12 ft height)
- Exempt: non-structural remodels with no increase in square footage or plumbing/electrical/mechanical work (painting, papering, tiling, carpeting, cabinets, countertops); uncovered decks ≤200 sq ft and ≤30 inches above grade not attached to the dwelling and not serving a required exit; one-story detached accessory structures ≤50 sq ft and ≤12 ft height at grade (separate permit still required for any plumbing/electrical/mechanical within an exempt accessory structure)
- Plans must comply with Town of Clarkdale Design Criteria, including Seismic Design Category C (amended R301.2.2.1)
- Site/plot plan showing existing structure, addition/accessory-structure footprint, and setbacks required with application
Required documents
- RequiredBuilding Permit ApplicationSubmitted by mail (PO Box 308), email (communitydevelopment@clarkdale.az.gov), or in person at 890 Main Street; select 'Accessory Structure,' 'Deck,' or 'Remodel' project type as applicable
- RequiredSite/Plot PlanShowing existing structure, addition/accessory-structure footprint, and setbacks
- RequiredConstruction DrawingsStructural details for the addition/remodel/accessory-structure scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation | Calculated from ICC Building Safety Journal square-foot construction-cost tables (currently August 2007 basis) applied against Table 1-A, Building Permit Fees | Same valuation methodology as new residential construction; see Notice of Intention to Amend the Townwide Fee Schedule for the pending 2018-basis update |
| Plan Review Fee | 65% of the calculated Building Permit Fee | Non-refundable; a 20% surcharge may apply to revised/resubmitted plans |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in the Town of Clarkdale, governed by the 2023 National Electrical Code (NEC) as adopted by the Town (Town Code Article 7-5), with narrow exemptions for minor/like-for-like work.
Verified 2026-07-06 · Source
Requirements
- Electrical permit required for wiring, panel work, service changes, and other hard-wired electrical work not falling under the Town's exemption list
- Governed by the 2023 NEC as adopted by the Town of Clarkdale (Town Code Article 7-5); Article 90.1(E)(1) cross-references the 2024 IRC/IBC Chapter 1 for permit administration and fee procedures
- Exempt from permit: listed cord-and-plug temporary decorative lighting; reinstallation of attachment plug receptacles; repair/replacement of fixed motors, transformers, or approved appliances of the same type/rating in the same location; branch-circuit overcurrent device replacement of the required capacity; wiring operating under 25 volts / 50 watts; minor repairs (lamp replacement, connecting approved portable equipment to approved receptacles); low-energy Class II/III power/control/signal circuits; and electric water heater replacement of the same type and rating
- Special inspections required for equipment/systems ≥1,000A or >600V, transformers ≥100kVA (1-phase)/≥300kVA (3-phase), and health-care (NEC Article 517) or hazardous-location electrical systems (amended IBC Sections 1705.21)
Required documents
- RequiredBuilding/Electrical Permit ApplicationSubmitted by mail, email, or in person; select 'Electrical' project type
- RequiredElectrical Plan / Load CalculationPanel size/rating, circuit layout, and grounding details for service changes or new circuits
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee — Based on Valuation | Calculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodology, or itemized per the Town's fee schedule | The Town's underlying itemized electrical fee schedule (per-fixture/per-service dollar amounts, analogous to Cottonwood's itemized electrical fee table) was not independently located in this review beyond the general valuation-based methodology confirmed in the Notice of Intention to Amend the Townwide Fee Schedule — confirmed gap, not an assumption. |
| Plan Review Fee | 65% of the calculated Building Permit Fee | Per the Town's general fee-schedule methodology; applies where plan review is required beyond a straightforward permit |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in the Town of Clarkdale, governed by the 2024 International Plumbing Code (IPC) as adopted by the Town (Town Code Article 7-3).
Verified 2026-07-06 · Source
Requirements
- Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping not falling under the Town's exemption list
- Governed by the 2024 IPC as adopted by the Town of Clarkdale (Town Code Article 7-3), including Appendices B, C, D, E and F
- Exempt from permit: stopping leaks in drains/water/soil/waste/vent pipe WITHOUT replacing concealed piping; clearing stoppages or repairing leaks in pipes/valves/fixtures not requiring replacement/rearrangement of valves, pipes, or fixtures
- Private sewage disposal (septic) systems are NOT permitted by the Town's Building Division — referred to Yavapai County Environmental Services (928-639-8136)
- Special inspections required for medical gas/vacuum systems (amended IBC Section 1705.23)
Required documents
- RequiredBuilding/Plumbing Permit ApplicationSubmitted by mail, email, or in person; select 'Plumbing' project type
- RequiredPlumbing PlanFixture counts, water/sewer line sizing, and gas piping schematic where applicable
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Fee — Based on Valuation | Calculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodology, or itemized per the Town's fee schedule | The Town's itemized plumbing fee schedule (per-fixture dollar amounts) was not independently located in this review — confirmed gap, not an assumption |
| Plan Review Fee | 65% of the calculated Building Permit Fee | Per the Town's general fee-schedule methodology |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations in the Town of Clarkdale, governed by the 2024 International Mechanical Code (IMC) as adopted by the Town (Town Code Article 7-4).
Verified 2026-07-06 · Source
Requirements
- Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems not falling under the Town's exemption list
- Governed by the 2024 IMC as adopted by the Town of Clarkdale (Town Code Article 7-4), including Appendices A, C, D, and E
- Exempt from permit: portable heating/ventilation/cooling appliances and evaporative coolers; minor-parts replacement not affecting equipment approval/safety; self-contained refrigeration systems ≤10 lbs refrigerant or ≤1 hp motor; portable fuel cell appliances not connected to fixed piping or the power grid; gas water heater replacement with no flue/connection alteration
- Energy-efficiency inspections required per 2018 IECC Chapter 13 (envelope R/U-values, fenestration U-value, duct system R-value, HVAC/water-heating equipment efficiency)
Required documents
- RequiredBuilding/Mechanical Permit ApplicationSubmitted by mail, email, or in person; select 'Mechanical' project type
- RequiredMechanical PlanEquipment locations, combustion air provisions, and ducting layout
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Fee — Based on Valuation | Calculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodology, or itemized per the Town's fee schedule | The Town's itemized mechanical fee schedule (per-unit dollar amounts) was not independently located in this review — confirmed gap, not an assumption |
| Plan Review Fee | 65% of the calculated Building Permit Fee | Per the Town's general fee-schedule methodology |
Re-Roofing Permit
VerifiedRequired for residential and commercial re-roofing in the Town of Clarkdale when not covered by the Town's narrow like-for-like permit exemption. Governed by the 2024 IRC/IBC roofing provisions and Town of Clarkdale amendments; the Building Division's own page separately notes that permits ARE required for 'roofing... of any size.'
Verified 2026-07-06 · Source
Requirements
- Building permit required for re-roofing, EXCEPT the narrow residential exemption: like-for-like material re-roof, maximum 100 sq ft of sheathing replacement, and no more than two layers total (amended IRC Section R105.2, item 14)
- The Building Division's own webpage separately states that permits are 'also required... for roofing... of any size,' which appears broader/stricter than the itemized 100-sq-ft IRC exemption text — applicants should confirm scope with the Building Official before assuming any exemption applies, since the two Town sources are not perfectly reconciled
- This exemption applies to residential (IRC) work only; the IRC exemption list explicitly states these exemptions 'do not apply to commercial projects'
- Roof plan/material listing typically required showing existing framing, square footage, existing/proposed material and weight, sheathing, flashing, and underlayment
Required documents
- RequiredBuilding Permit Application (Re-Roofing)Submitted by mail, email, or in person; select 'Re-Roof' project type
- RequiredRoof Plan / Material ListingExisting framing, square footage, existing and proposed material/weight, sheathing, flashing, and underlayment
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation | Calculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodology | No separately itemized flat roofing fee was located in this review; roofing permits appear billed on the general valuation-based methodology used for other building-permit types — confirmed gap on the itemized dollar figure, not an assumption |
| Plan Review Fee | 65% of the calculated Building Permit Fee | Per the Town's general fee-schedule methodology |
Demolition Permit
VerifiedRequired for demolition of any residential or commercial structure in the Town of Clarkdale, governed by the 2024 International Existing Building Code (IEBC) as adopted by the Town (Town Code Article 7-8).
Verified 2026-07-06 · Source
Requirements
- Building permit required before demolishing a residential or commercial structure within Clarkdale town limits, per the IEBC's scope over demolition (amended Section 101.2)
- An 8½" x 11" plot plan is required showing the structure(s) to be demolished and the location/size of any existing structure(s) remaining on the property (amended IEBC Section R106.2.6)
- The Building Official may waive or modify the site-plan requirement for alteration/repair work or when otherwise warranted, but demolition specifically requires the plot plan format above
- Utilities must be properly terminated and other department/agency approvals obtained prior to a final inspection
Required documents
- RequiredBuilding Permit Application (Demolition)Submitted by mail, email, or in person; select 'Demolition' project type
- RequiredDemolition Plot Plan (8½" x 11")Shows the structure(s) to be demolished and the location/size of existing structure(s) to remain on the property, per amended IEBC Section R106.2.6
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit Fee | Not independently confirmed as a flat or valuation-based figure in this review | The Town's specific demolition fee dollar amount was not located in the documents retrieved during this review (the general Building Permit Application shows a 'Demolition' checkbox but the office-use fee fields are blank template fields, not published rate figures) — confirmed gap, not an assumption |
| Plan Review Fee | 65% of the calculated Building Permit Fee | Per the Town's general fee-schedule methodology, applied where plan review is required |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clarkdale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.