Skip to main content
PermitBase

This is PermitBase’s published record for Clarkdale as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Clarkdale building permits

Verified

Clarkdale, Arizona — as published 2026-07-06.

Verified 2026-07-06 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Clarkdale independently created and administers its own Community Development Department / Building Safety Unit under Town Code Chapter 7 (Building), which adopts and amends its own construction codes; it does not defer permitting to Yavapai County. Source: Town of Clarkdale Building Division page (clarkdale.az.gov/179/Building-Division) and Town of Clarkdale Building Permit Application (communitydevelopment@clarkdale.az.gov, PO Box 308, Clarkdale, AZ 86324), which names a dedicated Building Official (Bob Pipkin, bob.pipkin@clarkdale.az.gov) and a Town-specific permit fee/valuation structure.2024 International Building Code (IBC), including Appendices B, C, D, E, F, G, H, I, J, K, N, O and P as published by the International Code Council, adopted by reference as Town Code Article 7-1, with Town of Clarkdale amendments. The Building Division's own page (as of this review) still describes the 2018 ICC codes/2017 NEC as the 'recently adopted' set, but the Town's own current Article 7-1 ordinance text (retrieved directly, Town of Clarkdale Ordinance amending Chapter 7) confirms the 2024 IBC is now the adopted and currently governing edition — a June 1, 2026 Building and Fire Code update was separately reported in Town news channels. Source: Town of Clarkdale Town Code Article 7-1, International Building Code (IBC), official PDF (clarkdale.az.gov/DocumentCenter/View/2516).2024 International Residential Code (IRC) for One- and Two-Family Dwellings, adopted by reference as Town Code Article 7-2, with Town of Clarkdale amendments (e.g., Section R105.2 exempt-work list; Seismic Design Category C per amended R301.2.2.1). Source: Town of Clarkdale Town Code Article 7-2, International Residential Code (IRC), official PDF (clarkdale.az.gov/DocumentCenter/View/2517).2024 International Plumbing Code (IPC), including Appendices B, C, D, E and F, adopted by reference as Town Code Article 7-3, with Town of Clarkdale amendments. Source: Town of Clarkdale Town Code Article 7-3, official PDF (clarkdale.az.gov/DocumentCenter/View/2518).2024 International Mechanical Code (IMC), including Appendices A, C, D, and E, adopted by reference as Town Code Article 7-4, with Town of Clarkdale amendments. Source: Town of Clarkdale Town Code Article 7-4, official PDF (clarkdale.az.gov/DocumentCenter/View/2519).2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference as Town Code Article 7-5 (one edition behind the 2024 ICC set, consistent with typical Arizona NEC adoption lag); Article 90.1(E)(1) cross-references Chapter 1 of the 2024 IRC/IBC for permit administration and fee collection procedures. Source: Town of Clarkdale Town Code Article 7-5, official PDF (clarkdale.az.gov/DocumentCenter/View/2509).2024 International Fuel Gas Code (IFGC), including Appendices A, B, C and D, adopted by reference as Town Code Article 7-6, with Town of Clarkdale amendments. Source: Town of Clarkdale Town Code Article 7-6, official PDF (clarkdale.az.gov/DocumentCenter/View/2510).International Fire Code, 2012 Edition plus Appendix D, adopted as part of Town Code Chapter 7 (Building); the Verde Valley Fire District administers this code on behalf of the Town rather than the Building Division directly. Source: Town of Clarkdale Building Division page (clarkdale.az.gov/179/Building-Division).2024 International Existing Building Code (IEBC), including Appendices A, B, C, D and E, adopted by reference as Town Code Article 7-8, with Town of Clarkdale amendments (governs repair, alteration, change of occupancy, addition, relocation, and demolition of existing buildings — one- and two-family dwellings and townhouses up to 3 stories may alternatively comply with the IRC). Source: Town of Clarkdale Town Code Article 7-8, official PDF (clarkdale.az.gov/DocumentCenter/View/2512).2018 International Energy Conservation Code (IECC), adopted by reference in Town Code Article 7-9 and cross-referenced throughout the IBC/IRC amendments (e.g., Section 110.3.9/R109.1.6 energy-efficiency inspections cite 'Chapter 13 of the 2018 IECC') — NOT advanced to the 2024 edition alongside the other ICC codes, mirroring the same one-edition-behind pattern seen in neighboring Yavapai County jurisdictions (e.g., Cottonwood). Source: Town of Clarkdale Town Code Article 7-1 (IBC) Section 101.4.6 and Article 7-2 (IRC) energy-inspection sections, official PDFs.2012 International Property Maintenance Code (IPMC), adopted as Town Code Article 7-20. Source: Town of Clarkdale Building Division page (clarkdale.az.gov/179/Building-Division).International Swimming Pool and Spa Code (ISPSC), adopted as Town Code Article 7-22 (edition not independently confirmed in this review). Source: Town of Clarkdale Community Development page document list (clarkdale.az.gov/178/Community-Development).2017 ICC A117.1 Accessible and Usable Buildings and Facilities standard, plus the 2010 ADA Standards (Title II regulations at 28 CFR 35.15 and Title III regulations at 28 CFR 36 subpart D, both referencing the 2004 ADAAG at 36 CFR part 1191, Appendices B and D), adopted as an amendment to IBC Chapter 11 / Section 1102.1 (Design). A separate IRC Chapter 11 (Accessibility) amendment in Article 7-1 deletes that chapter in its entirety for one- and two-family work. Source: Town of Clarkdale Town Code Article 7-1 (IBC), Section 1101/1102 amendments, official PDF.Manufactured housing is separately regulated under Town Code Article 7-13 (Manufactured Housing Standards), which includes its own Manufactured Home Building Permit section (7-13-2); the Building Permit Application lists 'Manufactured Home' as a distinct project type. The full text of Article 7-13 could not be retrieved in this review (it is not mirrored on the Town's ordinances/DocumentCenter page alongside the ICC-code articles, and the third-party town.codes mirror blocked automated access) — treated as a confirmed gap rather than an assumption. Source: Town of Clarkdale Building Permit Application (clarkdale.az.gov/DocumentCenter/View/1154); Town Code table of contents (Article 7-13).

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family and two-family dwelling construction in the Town of Clarkdale. Reviewed against the 2024 IRC and Town of Clarkdale amendments (Town Code Article 7-2). Applications are submitted by mail, email, or in person to the Community Development Department.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new single-family and two-family dwelling construction within Clarkdale town limits
  • Plans must comply with the 2024 IRC and Town of Clarkdale amendments, including Seismic Design Category C (amended R301.2.2.1)
  • Construction must start within 180 days of the permit issue date; construction hours are limited to 6:00 a.m. to 9:00 p.m.
  • Site plan required, drawn to a defined scale, showing size/location of new construction and existing structures, lot-line distances, grading/drainage, and utility line locations
  • Application submitted via mail (PO Box 308, Clarkdale, AZ 86324), email (communitydevelopment@clarkdale.az.gov), or in person at 890 Main Street; application is reviewed for completeness prior to acceptance
  • Applicant must disclose contractor licensing status (ROC license number and class) or claim an A.R.S. §32-1121A owner/builder or owner/developer exemption from contractor licensing

Required documents

  • RequiredBuilding Permit ApplicationTown of Clarkdale Community Development Department Building Permit Application; includes applicant/owner/contractor information, project description, valuation, and office-use fee calculation fields
  • RequiredSite/Plot PlanDrawn to a defined scale, showing lot dimensions, easements, setbacks, existing/proposed grading and drainage, utility line locations, and structure locations
  • RequiredConstruction Drawings and Structural CalculationsConstruction documents prepared to Town-adopted code and design-criteria standards; special inspection reports (geotechnical, retaining wall, electrical/mechanical/plumbing per amended IBC 1705.21-23) required where applicable

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables (currently the AUGUST 2007 cost table) applied against Table 1-A, Building Permit FeesTown of Clarkdale 'Notice of Intention to Amend the Townwide Fee Schedule' (posted 07/06/2026) confirms the August 2007 ICC valuation basis is the CURRENTLY adopted figure; a proposed update to the 2018 cost table is scheduled for Town Council action September 8, 2026 and is not yet in effect. Exact current Table 1-A dollar-bracket schedule (the fee-per-valuation-bracket table itself, as opposed to the underlying per-square-foot cost inputs) was not independently located in this review — confirmed gap, not an assumption.
Plan Review Fee65% of the calculated Building Permit FeeTown of Clarkdale 'Notice of Intention to Amend the Townwide Fee Schedule' (confirmed unchanged between the current and proposed fee schedule versions); plan review fees are non-refundable per the Building Permit Application
Revised/Resubmitted Plans Review Fee20% of the plan review fee (as applicable)Building Permit Application: 'A twenty percent plan review fee may be applied to revised plans.'
Permit Renewal After Expiration / One-Time ExtensionOne-half the amount required for a new permit for such workTown of Clarkdale Town Code Article 7-1 (IBC)/Article 7-2 (IRC), Section 105.5/105.5.1 amendments

Residential Addition / Remodel / Accessory Structure Permit

Verified

Required for room additions, structural remodels, decks, and accessory structures to existing one- and two-family dwellings in the Town of Clarkdale, reviewed against the 2024 IRC as adopted and amended by the Town (Town Code Article 7-2). Non-structural cosmetic remodels with no added square footage or plumbing/electrical/mechanical scope are exempt.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for room additions, decks over 200 sq ft or more than 30 inches above grade, structural remodels, and detached accessory structures exceeding the Town's small-shed exemption (50 sq ft / 12 ft height)
  • Exempt: non-structural remodels with no increase in square footage or plumbing/electrical/mechanical work (painting, papering, tiling, carpeting, cabinets, countertops); uncovered decks ≤200 sq ft and ≤30 inches above grade not attached to the dwelling and not serving a required exit; one-story detached accessory structures ≤50 sq ft and ≤12 ft height at grade (separate permit still required for any plumbing/electrical/mechanical within an exempt accessory structure)
  • Plans must comply with Town of Clarkdale Design Criteria, including Seismic Design Category C (amended R301.2.2.1)
  • Site/plot plan showing existing structure, addition/accessory-structure footprint, and setbacks required with application

Required documents

  • RequiredBuilding Permit ApplicationSubmitted by mail (PO Box 308), email (communitydevelopment@clarkdale.az.gov), or in person at 890 Main Street; select 'Accessory Structure,' 'Deck,' or 'Remodel' project type as applicable
  • RequiredSite/Plot PlanShowing existing structure, addition/accessory-structure footprint, and setbacks
  • RequiredConstruction DrawingsStructural details for the addition/remodel/accessory-structure scope

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables (currently August 2007 basis) applied against Table 1-A, Building Permit FeesSame valuation methodology as new residential construction; see Notice of Intention to Amend the Townwide Fee Schedule for the pending 2018-basis update
Plan Review Fee65% of the calculated Building Permit FeeNon-refundable; a 20% surcharge may apply to revised/resubmitted plans

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in the Town of Clarkdale, governed by the 2023 National Electrical Code (NEC) as adopted by the Town (Town Code Article 7-5), with narrow exemptions for minor/like-for-like work.

Verified 2026-07-06 · Source

Requirements

  • Electrical permit required for wiring, panel work, service changes, and other hard-wired electrical work not falling under the Town's exemption list
  • Governed by the 2023 NEC as adopted by the Town of Clarkdale (Town Code Article 7-5); Article 90.1(E)(1) cross-references the 2024 IRC/IBC Chapter 1 for permit administration and fee procedures
  • Exempt from permit: listed cord-and-plug temporary decorative lighting; reinstallation of attachment plug receptacles; repair/replacement of fixed motors, transformers, or approved appliances of the same type/rating in the same location; branch-circuit overcurrent device replacement of the required capacity; wiring operating under 25 volts / 50 watts; minor repairs (lamp replacement, connecting approved portable equipment to approved receptacles); low-energy Class II/III power/control/signal circuits; and electric water heater replacement of the same type and rating
  • Special inspections required for equipment/systems ≥1,000A or >600V, transformers ≥100kVA (1-phase)/≥300kVA (3-phase), and health-care (NEC Article 517) or hazardous-location electrical systems (amended IBC Sections 1705.21)

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSubmitted by mail, email, or in person; select 'Electrical' project type
  • RequiredElectrical Plan / Load CalculationPanel size/rating, circuit layout, and grounding details for service changes or new circuits

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee — Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodology, or itemized per the Town's fee scheduleThe Town's underlying itemized electrical fee schedule (per-fixture/per-service dollar amounts, analogous to Cottonwood's itemized electrical fee table) was not independently located in this review beyond the general valuation-based methodology confirmed in the Notice of Intention to Amend the Townwide Fee Schedule — confirmed gap, not an assumption.
Plan Review Fee65% of the calculated Building Permit FeePer the Town's general fee-schedule methodology; applies where plan review is required beyond a straightforward permit

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in the Town of Clarkdale, governed by the 2024 International Plumbing Code (IPC) as adopted by the Town (Town Code Article 7-3).

Verified 2026-07-06 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping not falling under the Town's exemption list
  • Governed by the 2024 IPC as adopted by the Town of Clarkdale (Town Code Article 7-3), including Appendices B, C, D, E and F
  • Exempt from permit: stopping leaks in drains/water/soil/waste/vent pipe WITHOUT replacing concealed piping; clearing stoppages or repairing leaks in pipes/valves/fixtures not requiring replacement/rearrangement of valves, pipes, or fixtures
  • Private sewage disposal (septic) systems are NOT permitted by the Town's Building Division — referred to Yavapai County Environmental Services (928-639-8136)
  • Special inspections required for medical gas/vacuum systems (amended IBC Section 1705.23)

Required documents

  • RequiredBuilding/Plumbing Permit ApplicationSubmitted by mail, email, or in person; select 'Plumbing' project type
  • RequiredPlumbing PlanFixture counts, water/sewer line sizing, and gas piping schematic where applicable

Fee schedule

Fee typeAmountNotes
Plumbing Permit Fee — Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodology, or itemized per the Town's fee scheduleThe Town's itemized plumbing fee schedule (per-fixture dollar amounts) was not independently located in this review — confirmed gap, not an assumption
Plan Review Fee65% of the calculated Building Permit FeePer the Town's general fee-schedule methodology

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations in the Town of Clarkdale, governed by the 2024 International Mechanical Code (IMC) as adopted by the Town (Town Code Article 7-4).

Verified 2026-07-06 · Source

Requirements

  • Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems not falling under the Town's exemption list
  • Governed by the 2024 IMC as adopted by the Town of Clarkdale (Town Code Article 7-4), including Appendices A, C, D, and E
  • Exempt from permit: portable heating/ventilation/cooling appliances and evaporative coolers; minor-parts replacement not affecting equipment approval/safety; self-contained refrigeration systems ≤10 lbs refrigerant or ≤1 hp motor; portable fuel cell appliances not connected to fixed piping or the power grid; gas water heater replacement with no flue/connection alteration
  • Energy-efficiency inspections required per 2018 IECC Chapter 13 (envelope R/U-values, fenestration U-value, duct system R-value, HVAC/water-heating equipment efficiency)

Required documents

  • RequiredBuilding/Mechanical Permit ApplicationSubmitted by mail, email, or in person; select 'Mechanical' project type
  • RequiredMechanical PlanEquipment locations, combustion air provisions, and ducting layout

Fee schedule

Fee typeAmountNotes
Mechanical Permit Fee — Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodology, or itemized per the Town's fee scheduleThe Town's itemized mechanical fee schedule (per-unit dollar amounts) was not independently located in this review — confirmed gap, not an assumption
Plan Review Fee65% of the calculated Building Permit FeePer the Town's general fee-schedule methodology

Re-Roofing Permit

Verified

Required for residential and commercial re-roofing in the Town of Clarkdale when not covered by the Town's narrow like-for-like permit exemption. Governed by the 2024 IRC/IBC roofing provisions and Town of Clarkdale amendments; the Building Division's own page separately notes that permits ARE required for 'roofing... of any size.'

Verified 2026-07-06 · Source

Requirements

  • Building permit required for re-roofing, EXCEPT the narrow residential exemption: like-for-like material re-roof, maximum 100 sq ft of sheathing replacement, and no more than two layers total (amended IRC Section R105.2, item 14)
  • The Building Division's own webpage separately states that permits are 'also required... for roofing... of any size,' which appears broader/stricter than the itemized 100-sq-ft IRC exemption text — applicants should confirm scope with the Building Official before assuming any exemption applies, since the two Town sources are not perfectly reconciled
  • This exemption applies to residential (IRC) work only; the IRC exemption list explicitly states these exemptions 'do not apply to commercial projects'
  • Roof plan/material listing typically required showing existing framing, square footage, existing/proposed material and weight, sheathing, flashing, and underlayment

Required documents

  • RequiredBuilding Permit Application (Re-Roofing)Submitted by mail, email, or in person; select 'Re-Roof' project type
  • RequiredRoof Plan / Material ListingExisting framing, square footage, existing and proposed material/weight, sheathing, flashing, and underlayment

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodologyNo separately itemized flat roofing fee was located in this review; roofing permits appear billed on the general valuation-based methodology used for other building-permit types — confirmed gap on the itemized dollar figure, not an assumption
Plan Review Fee65% of the calculated Building Permit FeePer the Town's general fee-schedule methodology

Demolition Permit

Verified

Required for demolition of any residential or commercial structure in the Town of Clarkdale, governed by the 2024 International Existing Building Code (IEBC) as adopted by the Town (Town Code Article 7-8).

Verified 2026-07-06 · Source

Requirements

  • Building permit required before demolishing a residential or commercial structure within Clarkdale town limits, per the IEBC's scope over demolition (amended Section 101.2)
  • An 8½" x 11" plot plan is required showing the structure(s) to be demolished and the location/size of any existing structure(s) remaining on the property (amended IEBC Section R106.2.6)
  • The Building Official may waive or modify the site-plan requirement for alteration/repair work or when otherwise warranted, but demolition specifically requires the plot plan format above
  • Utilities must be properly terminated and other department/agency approvals obtained prior to a final inspection

Required documents

  • RequiredBuilding Permit Application (Demolition)Submitted by mail, email, or in person; select 'Demolition' project type
  • RequiredDemolition Plot Plan (8½" x 11")Shows the structure(s) to be demolished and the location/size of existing structure(s) to remain on the property, per amended IEBC Section R106.2.6

Fee schedule

Fee typeAmountNotes
Demolition Permit FeeNot independently confirmed as a flat or valuation-based figure in this reviewThe Town's specific demolition fee dollar amount was not located in the documents retrieved during this review (the general Building Permit Application shows a 'Demolition' checkbox but the office-use fee fields are blank template fields, not published rate figures) — confirmed gap, not an assumption
Plan Review Fee65% of the calculated Building Permit FeePer the Town's general fee-schedule methodology, applied where plan review is required

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clarkdale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-07) →View current record →All versions →

Permalink: /arizona/yavapai-county/clarkdale/as-of/2026-07-06/

Snapshot date: 2026-07-06

Commit: 30b181b

Reproducible from PermitBase’s version-controlled dataset, commit 30b181b.