Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-07-07.

Clarkdale building permits

Verified

Clarkdale, Arizona — as published 2026-07-07.

Verified 2026-07-06 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Clarkdale independently created and administers its own Community Development Department / Building Safety Unit under Town Code Chapter 7 (Building), which adopts and amends its own construction codes; it does not defer permitting to Yavapai County. Source: Town of Clarkdale Building Division page (clarkdale.az.gov/179/Building-Division) and Town of Clarkdale Building Permit Application (communitydevelopment@clarkdale.az.gov, PO Box 308, Clarkdale, AZ 86324), which names a dedicated Building Official (Bob Pipkin, bob.pipkin@clarkdale.az.gov) and a Town-specific permit fee/valuation structure.2024 International Building Code (IBC), including Appendices B, C, D, E, F, G, H, I, J, K, N, O and P as published by the International Code Council, adopted by reference as Town Code Article 7-1, with Town of Clarkdale amendments. The Building Division's own page (as of this review) still describes the 2018 ICC codes/2017 NEC as the 'recently adopted' set, but the Town's own current Article 7-1 ordinance text (retrieved directly, Town of Clarkdale Ordinance amending Chapter 7) confirms the 2024 IBC is now the adopted and currently governing edition — a June 1, 2026 Building and Fire Code update was separately reported in Town news channels. Source: Town of Clarkdale Town Code Article 7-1, International Building Code (IBC), official PDF (clarkdale.az.gov/DocumentCenter/View/2516).2024 International Residential Code (IRC) for One- and Two-Family Dwellings, adopted by reference as Town Code Article 7-2, with Town of Clarkdale amendments (e.g., Section R105.2 exempt-work list; Seismic Design Category C per amended R301.2.2.1). Source: Town of Clarkdale Town Code Article 7-2, International Residential Code (IRC), official PDF (clarkdale.az.gov/DocumentCenter/View/2517).2024 International Plumbing Code (IPC), including Appendices B, C, D, E and F, adopted by reference as Town Code Article 7-3, with Town of Clarkdale amendments. Source: Town of Clarkdale Town Code Article 7-3, official PDF (clarkdale.az.gov/DocumentCenter/View/2518).2024 International Mechanical Code (IMC), including Appendices A, C, D, and E, adopted by reference as Town Code Article 7-4, with Town of Clarkdale amendments. Source: Town of Clarkdale Town Code Article 7-4, official PDF (clarkdale.az.gov/DocumentCenter/View/2519).2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference as Town Code Article 7-5 (one edition behind the 2024 ICC set, consistent with typical Arizona NEC adoption lag); Article 90.1(E)(1) cross-references Chapter 1 of the 2024 IRC/IBC for permit administration and fee collection procedures. Source: Town of Clarkdale Town Code Article 7-5, official PDF (clarkdale.az.gov/DocumentCenter/View/2509).2024 International Fuel Gas Code (IFGC), including Appendices A, B, C and D, adopted by reference as Town Code Article 7-6, with Town of Clarkdale amendments. Source: Town of Clarkdale Town Code Article 7-6, official PDF (clarkdale.az.gov/DocumentCenter/View/2510).International Fire Code, 2012 Edition plus Appendix D, adopted as part of Town Code Chapter 7 (Building); the Verde Valley Fire District administers this code on behalf of the Town rather than the Building Division directly. Source: Town of Clarkdale Building Division page (clarkdale.az.gov/179/Building-Division).2024 International Existing Building Code (IEBC), including Appendices A, B, C, D and E, adopted by reference as Town Code Article 7-8, with Town of Clarkdale amendments (governs repair, alteration, change of occupancy, addition, relocation, and demolition of existing buildings — one- and two-family dwellings and townhouses up to 3 stories may alternatively comply with the IRC). Source: Town of Clarkdale Town Code Article 7-8, official PDF (clarkdale.az.gov/DocumentCenter/View/2512).2018 International Energy Conservation Code (IECC), adopted by reference in Town Code Article 7-9 and cross-referenced throughout the IBC/IRC amendments (e.g., Section 110.3.9/R109.1.6 energy-efficiency inspections cite 'Chapter 13 of the 2018 IECC') — NOT advanced to the 2024 edition alongside the other ICC codes, mirroring the same one-edition-behind pattern seen in neighboring Yavapai County jurisdictions (e.g., Cottonwood). Source: Town of Clarkdale Town Code Article 7-1 (IBC) Section 101.4.6 and Article 7-2 (IRC) energy-inspection sections, official PDFs.2012 International Property Maintenance Code (IPMC), adopted as Town Code Article 7-20. Source: Town of Clarkdale Building Division page (clarkdale.az.gov/179/Building-Division).International Swimming Pool and Spa Code (ISPSC), adopted as Town Code Article 7-22 (edition not independently confirmed in this review). Source: Town of Clarkdale Community Development page document list (clarkdale.az.gov/178/Community-Development).2017 ICC A117.1 Accessible and Usable Buildings and Facilities standard, plus the 2010 ADA Standards (Title II regulations at 28 CFR 35.15 and Title III regulations at 28 CFR 36 subpart D, both referencing the 2004 ADAAG at 36 CFR part 1191, Appendices B and D), adopted as an amendment to IBC Chapter 11 / Section 1102.1 (Design). A separate IRC Chapter 11 (Accessibility) amendment in Article 7-1 deletes that chapter in its entirety for one- and two-family work. Source: Town of Clarkdale Town Code Article 7-1 (IBC), Section 1101/1102 amendments, official PDF.Manufactured housing is separately regulated under Town Code Article 7-13 (Manufactured Housing Standards), which includes its own Manufactured Home Building Permit section (7-13-2); the Building Permit Application lists 'Manufactured Home' as a distinct project type. The full text of Article 7-13 could not be retrieved in this review (it is not mirrored on the Town's ordinances/DocumentCenter page alongside the ICC-code articles, and the third-party town.codes mirror blocked automated access) — treated as a confirmed gap rather than an assumption. Source: Town of Clarkdale Building Permit Application (clarkdale.az.gov/DocumentCenter/View/1154); Town Code table of contents (Article 7-13).

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family and two-family dwelling construction in the Town of Clarkdale. Reviewed against the 2024 IRC and Town of Clarkdale amendments (Town Code Article 7-2). Applications are submitted by mail, email, or in person to the Community Development Department.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new single-family and two-family dwelling construction within Clarkdale town limits
  • Plans must comply with the 2024 IRC and Town of Clarkdale amendments, including Seismic Design Category C (amended R301.2.2.1)
  • Construction must start within 180 days of the permit issue date; construction hours are limited to 6:00 a.m. to 9:00 p.m.
  • Site plan required, drawn to a defined scale, showing size/location of new construction and existing structures, lot-line distances, grading/drainage, and utility line locations
  • Application submitted via mail (PO Box 308, Clarkdale, AZ 86324), email (communitydevelopment@clarkdale.az.gov), or in person at 890 Main Street; application is reviewed for completeness prior to acceptance
  • Applicant must disclose contractor licensing status (ROC license number and class) or claim an A.R.S. §32-1121A owner/builder or owner/developer exemption from contractor licensing

Required documents

  • RequiredBuilding Permit ApplicationTown of Clarkdale Community Development Department Building Permit Application; includes applicant/owner/contractor information, project description, valuation, and office-use fee calculation fields
  • RequiredSite/Plot PlanDrawn to a defined scale, showing lot dimensions, easements, setbacks, existing/proposed grading and drainage, utility line locations, and structure locations
  • RequiredConstruction Drawings and Structural CalculationsConstruction documents prepared to Town-adopted code and design-criteria standards; special inspection reports (geotechnical, retaining wall, electrical/mechanical/plumbing per amended IBC 1705.21-23) required where applicable

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables (currently the AUGUST 2007 cost table) applied against Table 1-A, Building Permit FeesTown of Clarkdale 'Notice of Intention to Amend the Townwide Fee Schedule' (posted 07/06/2026) confirms the August 2007 ICC valuation basis is the CURRENTLY adopted figure; a proposed update to the 2018 cost table is scheduled for Town Council action September 8, 2026 and is not yet in effect. Exact current Table 1-A dollar-bracket schedule (the fee-per-valuation-bracket table itself, as opposed to the underlying per-square-foot cost inputs) was not independently located in this review — confirmed gap, not an assumption.
Plan Review Fee65% of the calculated Building Permit FeeTown of Clarkdale 'Notice of Intention to Amend the Townwide Fee Schedule' (confirmed unchanged between the current and proposed fee schedule versions); plan review fees are non-refundable per the Building Permit Application
Revised/Resubmitted Plans Review Fee20% of the plan review fee (as applicable)Building Permit Application: 'A twenty percent plan review fee may be applied to revised plans.'
Permit Renewal After Expiration / One-Time ExtensionOne-half the amount required for a new permit for such workTown of Clarkdale Town Code Article 7-1 (IBC)/Article 7-2 (IRC), Section 105.5/105.5.1 amendments

Residential Addition / Remodel / Accessory Structure Permit

Verified

Required for room additions, structural remodels, decks, and accessory structures to existing one- and two-family dwellings in the Town of Clarkdale, reviewed against the 2024 IRC as adopted and amended by the Town (Town Code Article 7-2). Non-structural cosmetic remodels with no added square footage or plumbing/electrical/mechanical scope are exempt.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for room additions, decks over 200 sq ft or more than 30 inches above grade, structural remodels, and detached accessory structures exceeding the Town's small-shed exemption (50 sq ft / 12 ft height)
  • Exempt: non-structural remodels with no increase in square footage or plumbing/electrical/mechanical work (painting, papering, tiling, carpeting, cabinets, countertops); uncovered decks ≤200 sq ft and ≤30 inches above grade not attached to the dwelling and not serving a required exit; one-story detached accessory structures ≤50 sq ft and ≤12 ft height at grade (separate permit still required for any plumbing/electrical/mechanical within an exempt accessory structure)
  • Plans must comply with Town of Clarkdale Design Criteria, including Seismic Design Category C (amended R301.2.2.1)
  • Site/plot plan showing existing structure, addition/accessory-structure footprint, and setbacks required with application

Required documents

  • RequiredBuilding Permit ApplicationSubmitted by mail (PO Box 308), email (communitydevelopment@clarkdale.az.gov), or in person at 890 Main Street; select 'Accessory Structure,' 'Deck,' or 'Remodel' project type as applicable
  • RequiredSite/Plot PlanShowing existing structure, addition/accessory-structure footprint, and setbacks
  • RequiredConstruction DrawingsStructural details for the addition/remodel/accessory-structure scope

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables (currently August 2007 basis) applied against Table 1-A, Building Permit FeesSame valuation methodology as new residential construction; see Notice of Intention to Amend the Townwide Fee Schedule for the pending 2018-basis update
Plan Review Fee65% of the calculated Building Permit FeeNon-refundable; a 20% surcharge may apply to revised/resubmitted plans

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in the Town of Clarkdale, governed by the 2023 National Electrical Code (NEC) as adopted by the Town (Town Code Article 7-5), with narrow exemptions for minor/like-for-like work.

Verified 2026-07-06 · Source

Requirements

  • Electrical permit required for wiring, panel work, service changes, and other hard-wired electrical work not falling under the Town's exemption list
  • Governed by the 2023 NEC as adopted by the Town of Clarkdale (Town Code Article 7-5); Article 90.1(E)(1) cross-references the 2024 IRC/IBC Chapter 1 for permit administration and fee procedures
  • Exempt from permit: listed cord-and-plug temporary decorative lighting; reinstallation of attachment plug receptacles; repair/replacement of fixed motors, transformers, or approved appliances of the same type/rating in the same location; branch-circuit overcurrent device replacement of the required capacity; wiring operating under 25 volts / 50 watts; minor repairs (lamp replacement, connecting approved portable equipment to approved receptacles); low-energy Class II/III power/control/signal circuits; and electric water heater replacement of the same type and rating
  • Special inspections required for equipment/systems ≥1,000A or >600V, transformers ≥100kVA (1-phase)/≥300kVA (3-phase), and health-care (NEC Article 517) or hazardous-location electrical systems (amended IBC Sections 1705.21)

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSubmitted by mail, email, or in person; select 'Electrical' project type
  • RequiredElectrical Plan / Load CalculationPanel size/rating, circuit layout, and grounding details for service changes or new circuits

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee — Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodology, or itemized per the Town's fee scheduleThe Town's underlying itemized electrical fee schedule (per-fixture/per-service dollar amounts, analogous to Cottonwood's itemized electrical fee table) was not independently located in this review beyond the general valuation-based methodology confirmed in the Notice of Intention to Amend the Townwide Fee Schedule — confirmed gap, not an assumption.
Plan Review Fee65% of the calculated Building Permit FeePer the Town's general fee-schedule methodology; applies where plan review is required beyond a straightforward permit

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in the Town of Clarkdale, governed by the 2024 International Plumbing Code (IPC) as adopted by the Town (Town Code Article 7-3).

Verified 2026-07-06 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping not falling under the Town's exemption list
  • Governed by the 2024 IPC as adopted by the Town of Clarkdale (Town Code Article 7-3), including Appendices B, C, D, E and F
  • Exempt from permit: stopping leaks in drains/water/soil/waste/vent pipe WITHOUT replacing concealed piping; clearing stoppages or repairing leaks in pipes/valves/fixtures not requiring replacement/rearrangement of valves, pipes, or fixtures
  • Private sewage disposal (septic) systems are NOT permitted by the Town's Building Division — referred to Yavapai County Environmental Services (928-639-8136)
  • Special inspections required for medical gas/vacuum systems (amended IBC Section 1705.23)

Required documents

  • RequiredBuilding/Plumbing Permit ApplicationSubmitted by mail, email, or in person; select 'Plumbing' project type
  • RequiredPlumbing PlanFixture counts, water/sewer line sizing, and gas piping schematic where applicable

Fee schedule

Fee typeAmountNotes
Plumbing Permit Fee — Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodology, or itemized per the Town's fee scheduleThe Town's itemized plumbing fee schedule (per-fixture dollar amounts) was not independently located in this review — confirmed gap, not an assumption
Plan Review Fee65% of the calculated Building Permit FeePer the Town's general fee-schedule methodology

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations in the Town of Clarkdale, governed by the 2024 International Mechanical Code (IMC) as adopted by the Town (Town Code Article 7-4).

Verified 2026-07-06 · Source

Requirements

  • Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems not falling under the Town's exemption list
  • Governed by the 2024 IMC as adopted by the Town of Clarkdale (Town Code Article 7-4), including Appendices A, C, D, and E
  • Exempt from permit: portable heating/ventilation/cooling appliances and evaporative coolers; minor-parts replacement not affecting equipment approval/safety; self-contained refrigeration systems ≤10 lbs refrigerant or ≤1 hp motor; portable fuel cell appliances not connected to fixed piping or the power grid; gas water heater replacement with no flue/connection alteration
  • Energy-efficiency inspections required per 2018 IECC Chapter 13 (envelope R/U-values, fenestration U-value, duct system R-value, HVAC/water-heating equipment efficiency)

Required documents

  • RequiredBuilding/Mechanical Permit ApplicationSubmitted by mail, email, or in person; select 'Mechanical' project type
  • RequiredMechanical PlanEquipment locations, combustion air provisions, and ducting layout

Fee schedule

Fee typeAmountNotes
Mechanical Permit Fee — Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodology, or itemized per the Town's fee scheduleThe Town's itemized mechanical fee schedule (per-unit dollar amounts) was not independently located in this review — confirmed gap, not an assumption
Plan Review Fee65% of the calculated Building Permit FeePer the Town's general fee-schedule methodology

Re-Roofing Permit

Verified

Required for residential and commercial re-roofing in the Town of Clarkdale when not covered by the Town's narrow like-for-like permit exemption. Governed by the 2024 IRC/IBC roofing provisions and Town of Clarkdale amendments; the Building Division's own page separately notes that permits ARE required for 'roofing... of any size.'

Verified 2026-07-06 · Source

Requirements

  • Building permit required for re-roofing, EXCEPT the narrow residential exemption: like-for-like material re-roof, maximum 100 sq ft of sheathing replacement, and no more than two layers total (amended IRC Section R105.2, item 14)
  • The Building Division's own webpage separately states that permits are 'also required... for roofing... of any size,' which appears broader/stricter than the itemized 100-sq-ft IRC exemption text — applicants should confirm scope with the Building Official before assuming any exemption applies, since the two Town sources are not perfectly reconciled
  • This exemption applies to residential (IRC) work only; the IRC exemption list explicitly states these exemptions 'do not apply to commercial projects'
  • Roof plan/material listing typically required showing existing framing, square footage, existing/proposed material and weight, sheathing, flashing, and underlayment

Required documents

  • RequiredBuilding Permit Application (Re-Roofing)Submitted by mail, email, or in person; select 'Re-Roof' project type
  • RequiredRoof Plan / Material ListingExisting framing, square footage, existing and proposed material/weight, sheathing, flashing, and underlayment

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodologyNo separately itemized flat roofing fee was located in this review; roofing permits appear billed on the general valuation-based methodology used for other building-permit types — confirmed gap on the itemized dollar figure, not an assumption
Plan Review Fee65% of the calculated Building Permit FeePer the Town's general fee-schedule methodology

Solar Photovoltaic (PV) Permit

Verified

The Town of Clarkdale does have solar-specific permitting materials -- its own Forms page lists a 'Solar Permit Checklist' (alongside other 01.01.26-dated building checklists) as a live document title, and the Town's Community Development Department separately publishes a 'Solar Usage for Water and Electric and Geothermal Usage' GIS map (updated 8/29/2023) showing 413 parcels with solar electric, 4 with solar heated water, 15 with both, and 3 geothermal parcels -- clear evidence solar PV is a routinely permitted use in Clarkdale. However, the actual Solar Permit Checklist document itself could not be retrieved: it returned HTTP 404 from the Town's own document-hosting CDN during the prior full-file review (2026-07-06, flagged as a confirmed access gap in tipsAndGotchas) and was independently re-attempted on 2026-07-20 (both a direct WebFetch and a browser-header curl against the current Forms/Apply-For page) without locating a working link. Absent that checklist's content, a solar PV installation in Clarkdale is documented here as processed across the Town's general Building Permit (racking/structural, valuation-based per Table 1-A) and Electrical Permit (interconnection, governed by the 2023 NEC) -- the same two-permit pattern already documented for every other trade in this file, none of which publish an itemized dollar fee schedule beyond the ICC valuation methodology.

Verified 2026-07-20 · Source

Requirements

  • Building Permit required for the racking/structural mounting portion, reviewed against the 2024 IBC/IRC and Town of Clarkdale amendments
  • Electrical Permit required separately for grid interconnection, governed by the 2023 NEC as adopted by the Town (Town Code Article 7-5)
  • A Town-published 'Solar Permit Checklist' is referenced on the Forms page listing but its specific content (document-specific requirements beyond the general Building/Electrical permit process) could not be retrieved as of 2026-07-20 -- confirmed access gap, not assumed to be absent
  • Construction must start within 180 days of permit issuance; construction hours limited to 6:00 a.m.-9:00 p.m., same as any other Clarkdale building permit
  • Site/plot plan required showing panel/array location, per the Town's general site-plan requirements

Required documents

  • RequiredBuilding Permit Application (racking/structural)Town of Clarkdale Community Development Department Building Permit Application, covering the mounting/structural scope
  • RequiredBuilding/Electrical Permit Application (interconnection)Same application form, 'Electrical' project type selected for the interconnection scope
  • RequiredSolar Permit ChecklistReferenced as a live document title on the Town's Forms page (01.01.26-dated series) but not independently retrievable as of 2026-07-20 (HTTP 404 from the Town's document-hosting CDN on repeated attempts); contact Community Development at 928-639-2500 for a current copy

Fee schedule

Fee typeAmountNotes
Building Permit Fee (racking/structural, valuation-based)Calculated from ICC Building Safety Journal square-foot construction-cost tables (currently the August 2007 cost table) applied against Table 1-A, Building Permit FeesSame general valuation methodology as other Clarkdale building-permit types; no standalone flat solar-structural fee line was located
Electrical Permit Fee (interconnection)Calculated from the same ICC valuation methodology, or itemized per the Town's fee scheduleThe Town's underlying itemized electrical fee schedule (if any exists for solar specifically) was not independently located, consistent with the same gap already documented in this file's electrical-permit entry
Plan Review Fee65% of the calculated Building Permit FeePer the Town's general fee-schedule methodology, applies to both the Building and Electrical components

Demolition Permit

Verified

Required for demolition of any residential or commercial structure in the Town of Clarkdale, governed by the 2024 International Existing Building Code (IEBC) as adopted by the Town (Town Code Article 7-8).

Verified 2026-07-06 · Source

Requirements

  • Building permit required before demolishing a residential or commercial structure within Clarkdale town limits, per the IEBC's scope over demolition (amended Section 101.2)
  • An 8½" x 11" plot plan is required showing the structure(s) to be demolished and the location/size of any existing structure(s) remaining on the property (amended IEBC Section R106.2.6)
  • The Building Official may waive or modify the site-plan requirement for alteration/repair work or when otherwise warranted, but demolition specifically requires the plot plan format above
  • Utilities must be properly terminated and other department/agency approvals obtained prior to a final inspection

Required documents

  • RequiredBuilding Permit Application (Demolition)Submitted by mail, email, or in person; select 'Demolition' project type
  • RequiredDemolition Plot Plan (8½" x 11")Shows the structure(s) to be demolished and the location/size of existing structure(s) to remain on the property, per amended IEBC Section R106.2.6

Fee schedule

Fee typeAmountNotes
Demolition Permit FeeNot independently confirmed as a flat or valuation-based figure in this reviewThe Town's specific demolition fee dollar amount was not located in the documents retrieved during this review (the general Building Permit Application shows a 'Demolition' checkbox but the office-use fee fields are blank template fields, not published rate figures) — confirmed gap, not an assumption
Plan Review Fee65% of the calculated Building Permit FeePer the Town's general fee-schedule methodology, applied where plan review is required

Electric Vehicle (EV) Charger / EVSE Permit

The Town of Clarkdale has no dedicated EV charger/EVSE permit type -- confirmed against the Town's Building Division page and Forms page, which lists a 'Solar Permit Checklist' as a live document title (per the sibling solar-pv-permit entry in this file) but no corresponding EV/EVSE checklist or line item. An EVSE circuit installation is required to be permitted as standard electrical work, governed by the 2023 National Electrical Code (NEC) as adopted by the Town (Town Code Article 7-5).

Reviewed 2026-07-20 · Source

Requirements

  • Electrical permit required for EVSE circuit installation, alteration, or repair work in the Town of Clarkdale
  • Governed by the 2023 National Electrical Code (NEC) as adopted by the Town (Town Code Article 7-5), with narrow exemptions for minor/like-for-like work
  • No EV-charger-specific checklist, application, or fee line item was located, unlike the Town's published 'Solar Permit Checklist'

Required documents

  • RequiredElectrical Permit ApplicationTown of Clarkdale Building Division electrical permit application; EVSE circuit work would be submitted under this application type

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee -- Based on ValuationCalculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodology, or itemized per the Town's fee scheduleThe Town's underlying itemized electrical fee schedule (per-fixture/per-service dollar amounts) was not independently located in this review beyond the general valuation-based methodology confirmed in the Notice of Intention to Amend the Townwide Fee Schedule -- confirmed gap, not an assumption. No EV/EVSE-specific fee line was found. Re-chased exhaustively on 2026-07-20: confirmed via news coverage (Signals AZ, 'Townwide Fee Changes in Clarkdale') that the Town DID publish proposed Townwide Fee Schedule adjustments via a Civic Alert, but the Town's own DocumentCenter, Forms page, Codes & Plans page, Civic Alert detail page, and Building Permit Application PDF all returned HTTP 403 to direct fetch on this pass (a domain-wide bot-blocking pattern, not a missing-document gap); a Wayback Machine lookup for the same pages was also blocked. Confirmed the fee schedule document exists and is real, but the specific dollar figures could not be independently extracted in this pass -- contact Community Development at 928-639-2500 or visit 890 Main Street for the current itemized amount.

Sign Permit

Clarkdale's only distinctly-named, separately-fee'd sign permit product is the Banner Sign Permit for temporary banner signs. Permanent/commercial signage (freestanding monument, projecting, awning, off-premise, neon, animated, etc.) is substantively regulated by Zoning Code Chapter 7 (Signs) -- sized per a linear-street-frontage formula and, per Section 7-090, subject to mandatory Design Review Board review and approval for all non-temporary commercial signs -- but no separate, itemized 'Sign Permit' application or fee distinct from that Design Review Board process was found published by the Town after an exhaustive chase (see gap note below).

Reviewed 2026-07-23 · Source

Requirements

  • Temporary banner signs require a Banner Sign Permit: maximum sign size 32 square feet, wind slits required, removal date must be written on the banner, banner must be removed on or before the 30th day from initial installation, and no banner may be hung across a public right-of-way without Town Manager (or designee) approval. Source: Banner Sign Permit Application (PDF).
  • Permanent/commercial signage is governed by Clarkdale Zoning Code Chapter 7 (Signs), Ordinance #348/Resolution #1421 (1/22/13), current through Ordinance #430 (8/13/24): Section 7-080 lists permitted sign types (Animated, Awning/Canopy, Freestanding Monument, Off-Premise Commercial, On-Site Commercial Information, Neon, Political, Portable, Projecting, Public Information, Real Estate, Sign Walkers, Special Event) each with its own size/height/placement standards.
  • Section 7-090 (Maximum Sign Square Footage for Commercial Uses): maximum cumulative signage for a commercial building is calculated at 1.5 square feet per linear foot of street frontage (e.g., 100 linear ft = 150 sq ft max), available separately for each frontage with a public entrance; ALL commercial signs except temporary signs are subject to review and approval by the Design Review Board under the Section 11-040 design-review criteria.
  • Section 7-040 lists categories exempt from the sign ordinance AND its fees entirely (official court/public-body notices; government-authorized directional/warning signs; memorial plaques/building-identification signs integral to the structure; flags of government/non-commercial institutions; religious symbols/seasonal decorations; ideological signs; community/public-information signs) -- implying non-exempt signs are subject to both the ordinance and a fee, though the Town does not appear to publish that fee as a distinct, itemized 'Sign Permit' line separate from the Design Review Board review process.
  • On-Site Commercial Information signage (Section 7-080.E) is explicitly reviewed and approved by staff and the Design Review Board during review of a 'master sign plan application' -- the closest named application mechanism found for permanent signage, though no such application form was located on the Town's Forms page or DocumentCenter listing during this review.
  • CONFIRMED GAP: The Town's Forms page (clarkdale.az.gov/289/Forms) lists a Banner Sign Permit Application but no general/permanent 'Sign Permit Application' or itemized sign-permit fee schedule. Clarkdale Zoning Code Sections 7-010 (Purpose and Intent) and 7-020 (General Provisions) -- the sections most likely to state the actual permit-application/fee mechanism for permanent signage -- returned HTTP 403 on direct fetch and have ZERO Wayback Machine captures (confirmed via the Internet Archive CDX API, which lists captures for every other Chapter 7 section from 2019-2022 but none at all for 7-010 or 7-020). This is a genuine, exhaustively-chased access gap, not an assumption that no fee exists.

Required documents

  • RequiredBanner Sign Permit Application (PDF)Required for temporary banner signs; submitted by mail or email to Community Development, PO Box 308, Clarkdale, AZ 86324 / CommunityDevelopment@Clarkdale.AZ.gov

Fee schedule

Fee typeAmountNotes
Banner Sign Permit Fee$10.00 per banner, or a $50.00 flat fee covering a maximum of 10 banners per yearVerified directly from the Banner Sign Permit Application (PDF). Applies only to temporary banner signage.
Permanent/Commercial Sign Permit FeeNo itemized fee for permanent commercial signage was found published separately from the Design Review Board review process, despite an exhaustive chase (Town Forms page, DocumentCenter listing, Building Division page, Zoning Code Chapter 7 sections 7-040/7-080/7-090/7-130, and the Townwide Fee Schedule amendment notice, none of which itemize a sign-specific fee). Confirmed gap -- omitted rather than invented. Contact Community Development at 928-639-2500 to confirm the current fee.

Fire Sprinkler & Fire Alarm Permit

Verified

Fire sprinkler (automatic fire-extinguishing system) and fire alarm system permits within the Town of Clarkdale are NOT administered by the Town's Community Development Building Safety Unit -- they are issued and reviewed by the Verde Valley Fire District (VVFD), which maintains its own fire station (Station 36, 895 1st South Street) in Clarkdale and administers the International Fire Code (2012 Edition plus Appendix D, adopted as part of Town Code Chapter 7) on the Town's behalf. VVFD uses a single combined 'Permit Application Form' with checkboxes for system type (new automatic fire-extinguishing system / sprinkler, fire alarm system and related equipment, kitchen hood/fire systems, hot works, tents, etc.), so sprinkler and fire-alarm work are treated as ONE permit product with per-system-type fees rather than two separate permit products -- hence the combined slug.

Verified 2026-07-23 · Source

Requirements

  • Both sprinkler and fire-alarm permits are issued by the Verde Valley Fire District (VVFD), not the Town of Clarkdale -- confirmed directly on the Town's own Building Division page: 'Fire Suppression Code -- The Town adopted the International Fire Code, 2012 Edition plus Appendix D as part of Town Code, Chapter 7 Building. The Verde Valley Fire District administers this Code on behalf of the Town.'
  • A single VVFD 'Permit Application Form' covers new automatic fire-extinguishing systems (sprinklers, with a 'Number of heads' field), alteration/addition to an existing system, fire alarm systems and related equipment, kitchen hood/fire systems, hot works, and tents/canopies/temporary membrane structures -- selected via checkboxes on one form, not separate applications per system type.
  • The application requires the applicant to list any other jurisdiction(s) involved in the project (e.g., Office of the State Fire Marshal, Town of Clarkdale Community Development), reflecting that fire-system work is typically coordinated with a parallel Town of Clarkdale building permit.
  • Applications are rejected if requested information is not provided accurately and completely (per the application form's own notice); questions go to the Fire Inspector at 928-634-2578 ext. 4.
  • All plans and specifications for new commercial construction, remodeling, alterations, or operational permits within VVFD's district must be submitted for Fire District review and approval prior to any construction or operation.

Required documents

  • RequiredVerde Valley Fire District Permit Application Form (PDF)Single combined application; select project type (Residential/Commercial/Multi-Family/Government Facility) and permit type (new system, alteration/addition, fire alarm, kitchen hood, hot works, tent, other)

Fee schedule

Fee typeAmountNotes
NFPA 13D Sprinkler System -- New Install (plan review & 2 inspections)$460 up to 10,000 sq ft (base fee) + $0.03 per additional sq ft after 10,000 sq ftVerde Valley Fire District Fee Schedule, adopted 9/23/2025 (Resolution #2025-12), page 1. Visually verified against a 400dpi render of the source PDF because pdftotext -layout scrambled this table's columns. NOTE: the same fee schedule lists a SECOND 'NFPA 13D (plan review & 2 inspections)' line item with an identical description but a different figure -- $600 up to 10,000 sq ft (base fee) + $0.03/sq ft after 10,000 sq ft -- immediately below this one. This is a genuine apparent inconsistency in VVFD's own published document (confirmed via visual inspection, not an extraction artifact); confirm which figure applies with VVFD Fire Prevention before quoting.
Sprinkler System Modification -- 20 heads or less (over-the-counter permit, 1 inspection)$200Verde Valley Fire District Fee Schedule, adopted 9/23/2025.
Sprinkler System Modification -- 21 heads or greater (plan review & 2 inspections)$400Verde Valley Fire District Fee Schedule, adopted 9/23/2025.
NFPA 72 Fire Alarm System -- New Install (plan review, 1 rough-in inspection, 1 final inspection)$535, stated in the source as "over 10,000 sq ft base + $0.03 per sq ft"Quoted verbatim from VVFD's Fee Schedule, visually verified at 400dpi. The wording ('over' rather than 'up to') differs from the parallel sprinkler-fee phrasing and may be a drafting inconsistency in the source document itself; not corrected or reinterpreted here.
Fire Alarm System Modification (plan review, 1 rough-in inspection, 1 final inspection)$300Verde Valley Fire District Fee Schedule, adopted 9/23/2025.
Re-submittal fee (each re-submittal)$100 per hour, 1-hour minimumApplies to any VVFD plan review requiring re-submittal, including sprinkler/alarm plans.
Expedited Review (1 week or less)2.5x the original review feeAvailable for sprinkler/alarm plan reviews per VVFD's general Fire Prevention Fees table.

Certificate of Occupancy / Change of Use

The Town of Clarkdale has no stand-alone 'Change of Use Permit' or 'Certificate of Occupancy' application or fee product separate from its standard Building Permit process -- confirmed by inspecting the Town's own Building Permit Application, whose project-type checkboxes (Residential, Commercial, Accessory Structure, Deck, Demolition, Electrical, Fence, Fence Masonry, Grading, Manufactured Home, Mechanical, New Construction, Plumbing, Re-Roof, Remodel, Solar Electric, Solar Water, Swimming Pool, Temp. Use, Other) include no 'Change of Use' or 'Certificate of Occupancy' option. A change of occupancy/use in an existing building is instead processed as a standard Building Permit (Commercial and/or Remodel) governed by the Town's adopted 2024 International Existing Building Code (IEBC, Town Code Article 7-8), with a Certificate of Occupancy issued under the Town's adopted-by-reference (and locally unamended) 2024 IBC Section 111 following a final inspection. Separately, the Verde Valley Fire District charges its own distinct, named fee for a commercial change-of-use scenario.

Reviewed 2026-07-23 · Source

Requirements

  • No standalone Change of Use or Certificate of Occupancy application/fee exists -- confirmed against the Town's Building Permit Application (DocumentCenter View 1154), whose 'TYPE OF PROJECT' section lists no such checkbox; a change of use is applied for as a Commercial and/or Remodel building permit.
  • Town Code Article 7-1 (IBC), Section 101.4.7 (amended): 'The provisions of the 2024 Edition of the International Existing Building Code, as amended and adopted by Town of Clarkdale, shall apply to the repair, change of occupancy, and relocation of existing buildings and structures.' The 2024 IEBC is separately adopted by reference as Town Code Article 7-8, which itself states it governs 'the repair, alteration, change of occupancy, addition and relocation of existing buildings, including historic buildings.'
  • Town Code Article 7-1, Section 110.3.17 (amended Final Inspection): 'Final inspection shall be made after all permitted work is completed and prior to occupancy. Final approvals from all other departments and agencies must be completed prior to scheduling a final inspection.' No amendment to IBC Section 111 (Certificate of Occupancy) itself was found in Article 7-1's amendment list, indicating the stock 2024 IBC Section 111 CO-issuance requirement applies as adopted by reference, without local modification.
  • A change of use/occupancy that the Fire Official determines creates a greater fire or life-safety hazard (per Table A) can trigger a sprinkler-retrofit requirement even in an existing building that would otherwise be exempt from sprinklers -- Town Code Article 7-1 amendments to IBC Chapter 9 (Fire Protection Systems).
  • The Verde Valley Fire District (VVFD), which independently administers fire-code review in Clarkdale, DOES charge a distinct, named fee for this exact scenario: 'Tenant Improvement w/Change of Use (Commercial) (plan review and 1 inspection) -- $250,' per VVFD's Fee Schedule (Resolution #2025-12, adopted 9/23/2025).
  • Occupancy classification and use code are recorded by the Building Official in the permit's office-use-only fields (PARCEL NUMBER, ZONING, OCCUPANCY, CONST. TYPE, USE CODE) on the standard Building Permit Application.
  • Certificate of Occupancy is a real, referenced gating mechanism elsewhere in Clarkdale's own Zoning Code -- e.g., the Manufactured Home Residential (R4) and Manufactured Home Residential Alternate (R4A) zoning district provisions state that 'no certificate of occupancy or business license shall be issued unless and until' specified district standards are met.

Required documents

  • RequiredBuilding Permit Application (PDF)Checked as Commercial and/or Remodel; same general-purpose form used Town-wide for all building permit types (no distinct Change of Use / CO form exists)
  • OptionalVerde Valley Fire District Permit Application Form (PDF)Required only if the change of use involves fire-system plan review (e.g., a commercial tenant improvement)

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based) + Plan Review FeeCalculated from the Town's ICC Building Safety Journal square-foot construction-cost tables, plus a 65% plan review feeThe Town's general fee methodology (same as used for other permit types in this file); no separate 'change of use' or 'certificate of occupancy' fee line was found published at the Town level despite an exhaustive chase of the Building Division page, Forms page, Building Permit Application, Article 7-1 (IBC) and Article 7-8 (IEBC) ordinance text, and the Townwide Fee Schedule amendment notice.
VVFD Tenant Improvement w/Change of Use (Commercial) -- fire plan review & 1 inspection$250Verde Valley Fire District Fee Schedule, adopted 9/23/2025 (Resolution #2025-12). This is the one distinctly-named, itemized 'change of use' fee found in this research -- charged by the Fire District, not the Town.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clarkdale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →

Permalink: /arizona/yavapai-county/clarkdale/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 0214041

Reproducible from PermitBase’s version-controlled dataset, commit 0214041.