Version history — Prescott, Arizona
This is PermitBase’s own verified record for Prescott, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Prescott’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-20Current record
- 2026-08-16Superseded
- Prescott, Arizona — adopted-codes record updated
- 2026-08-01Superseded
- Prescott, Arizona — Commercial Building Permit (New Commercial & Multi-Family Construction) record added
- Prescott, Arizona — Commercial Tenant Improvement Permit record added
- 2026-07-20Superseded
- Prescott, Arizona — EV Charger / EVSE Permit record added
- Prescott, Arizona — EV Charger / EVSE Permit fee record added: Electrical Only Permit -- E/M/P Permit Residential Electrical (minimum/issue fee) ($66.00 minimum (FY26), plus $0.0396 per square foot of affected floor area for larger scopes)
- Prescott, Arizona — EV Charger / EVSE Permit fee record removed: Electrical Only permit fee for a retrofit circuit addition (no EV-specific or standalone-retrofit fee schedule found)
- 2026-07-06Initial record — coverage of Prescott began