What changed — page 24
Older changes to PermitBase’s verified permit dataset, newest first. The most recent changes are on the first page.
July 2, 2026
- Fee updated
Las Vegas, Nevada — Rooftop Solar PV Permit fee record added: Solar PV electrical permit (photovoltaic system, by kW) ($259 inspection fee (covers up to 10 kW) + $5.30 per kW above 10 kW + $102 plan check + $55 admin)
- Fee updated
Las Vegas, Nevada — Rooftop Solar PV Permit fee record removed: Solar PV electrical permit (per kW)
- Fee updated
Reno, Nevada — Swimming Pool and Spa Permit fee record updated: Varies — valuation-based (construction cost); application $45.00 + valuation-based permit fee + plan review (65%) + permit issuance $45.00 → Varies — valuation-based (construction cost); application $45.00 + valuation-based permit fee + plan review fee (valuation-based per the Permit Fee Table Schedule) + permit issuance $45.00
July 1, 2026
- Fee updated
Salt Lake City, Utah — Demolition Permit fee record added: Demolition Permit — Building Floor Area 5–2,000 sq. ft. ($98)
- Fee updated
Salt Lake City, Utah — Demolition Permit fee record added: Demolition Permit — Building Floor Area, additional tiers ($114 (2,001–4,000 sq ft); $131 (4,001–6,000); $179 (6,001–8,000); $196 (8,001–10,000); $244 (10,001–12,000); $293 (12,001–14,000); $342 (14,001–16,000); $391 (16,001–18,000); $432 (18,001–20,000); $489 (20,001–22,000); $554 (22,001–24,000); $603 (24,001–26,000); $668 (26,001–28,000); $733 (28,001–30,000); $790 (30,001–32,000); $16 per each additional 500 sq. ft. unit over 32,000)
- Fee updated
Salt Lake City, Utah — Demolition Permit fee record added: Pre-Demolition Salvage Permit (20% of the demolition fee)
- Fee updated
Salt Lake City, Utah — Deck Permit fee record updated: Valuation-based per the SLC Building Permit fee schedule (see residential building permit fees above) → Assessed on project valuation per SLC's building permit fee schedule (Ord. 2025-34, SLC Code § 18.32.035): $54.55 for $0.01–$500 valuation, scaling to $8,124.55 plus $5 per each additional $1,000 over $1,000,000 — same published table as the Residential Building Permit (see above)
- Fee updated
Salt Lake City, Utah — Basement Finish Permit fee record updated: Valuation-based per the SLC Building Permit fee schedule (see residential building permit fees above) → Assessed on project valuation per SLC's building permit fee schedule (Ord. 2025-34, SLC Code § 18.32.035): $54.55 for $0.01–$500 valuation, scaling to $8,124.55 plus $5 per each additional $1,000 over $1,000,000 — same published table as the Residential Building Permit (see above)
- Fee updated
Salt Lake City, Utah — Demolition Permit fee record removed: Demolition Permit Application Fee
- Fee updated
Taylorsville, Utah — Solar Panel Permit fee record updated: Valuation-based — see residential building permit fee schedule; valuation calculated from project cost or square-footage rates → Valuation-based — see residential building permit fee schedule; valuation is based on the proposal/bid/contract value of the P.V. installation, per the required 'Valuation' submittal document
- Fee updated
West Valley City, Utah — Basement Finish Permit fee record added: Basement remodel (interior finish — based on square footage / project valuation) (Assessed as a standard building permit under the codified valuation-based fee table (WVC Municipal Code § 1-2-103(1)(a)(i)): $0–$500 value = $26; $501–$2,000 = $25 for the first $500 plus $4 per additional $100 (min $50); $2,001–$25,000 = $76 for the first $2,000 plus $16 per additional $1,000 (scaling upward per the same table for larger remodels). WVC's counter-facing quote is a $53 minimum with a square-footage example chart available in person.)
- Fee updated
West Valley City, Utah — Residential Building Permit fee record updated: Valuation-based — contact WVC Building Inspections at (801) 963-3283 for the current fee table; minimum $53 for small remodels → Valuation-based per the codified fee table: $0–$500 value = $26; $501–$2,000 = $25 for the first $500 plus $4 per additional $100 (min $50); $2,001–$25,000 = $76 for the first $2,000 plus $16 per additional $1,000; $25,001–$50,000 = $430 for the first $25,000 plus $12.50 per additional $1,000; $50,001–$100,000 = $708 for the first $50,000 plus $9.50 per additional $1,000; $100,001–$500,000 = $1,094 for the first $100,000 plus $7.50 per additional $1,000; $500,001–$1,000,000 = $3,600 for the first $500,000 plus $6.50 per additional $1,000; over $1,000,000 = $6,000 for the first $1,000,000 plus $5.50 per additional $1,000. Plus a 1% state surcharge and 5% technology surcharge per building permit.
- Fee updated
West Valley City, Utah — Basement Finish Permit fee record removed: Basement remodel (interior finish — based on square footage)
- Fee updated
Orem, Utah — Fence Permit fee record added: Building permit fee for a standard fence (None — a standard fence does not require a building permit in Orem, so no building permit fee applies)
- Fee updated
Orem, Utah — Fence Permit fee record removed: Standard Fence Permit
- New jurisdictions
7 new Wyoming jurisdictions: Evanston, Gillette, Green River, Jackson, Laramie, Riverton, Rock Springs
- New jurisdictions
1 new Colorado jurisdictions: Thornton
- Fee updated
South Jordan, Utah — Fence Permit fee record added: Standalone fence permit fee (None — South Jordan's adopted Fee Schedule lists no separate fence permit fee)
- Fee updated
South Jordan, Utah — Fence Permit fee record added: City Council Review — Fence Height (only if fence exceeds the zone height limit) (Cost-based retainer (deposit) — the applicant pays the City's actual review cost; any unused retainer is refunded, and additional cost beyond the retainer is billed)
- Fee updated
South Jordan, Utah — Fence Permit fee record removed: Fence permit fee
- Fee updated
Bountiful, Utah — Demolition Permit fee record added: Demolition permit (issued as a building permit) (Assessed on project valuation using Bountiful's building-permit fee schedule (ICC valuation by floor area); no separate flat demolition fee)
- Fee updated
Bountiful, Utah — Demolition Permit fee record removed: Demolition Permit
- Fee updated
Riverton, Utah — Electrical Permit fee record updated: Fees based on the 1994 Modified UBC 1-A Fee Table (same table as building permit); valuation estimated from scope of work → Assessed on project valuation per the 1994 Modified UBC 1-A Fee Table (same table as the building permit); valuation estimated from scope of work per February 2020 ICC BVD Table
- Fee updated
Riverton, Utah — Plumbing Permit fee record updated: Fees based on the 1994 Modified UBC 1-A Fee Table (same table as building permit); valuation estimated from scope of work → Assessed on project valuation per the 1994 Modified UBC 1-A Fee Table (same table as the building permit); valuation estimated from scope of work per February 2020 ICC BVD Table
- Fee updated
Riverton, Utah — Mechanical / HVAC Permit fee record updated: Fees based on the 1994 Modified UBC 1-A Fee Table (same table as building permit); valuation estimated from scope of work → Assessed on project valuation per the 1994 Modified UBC 1-A Fee Table (same table as the building permit); valuation estimated from scope of work per February 2020 ICC BVD Table
- Fee updated
Riverton, Utah — Accessory Dwelling Unit (ADU) fee record updated: Fees based on the 1994 Modified UBC 1-A Fee Table; valuation per February 2020 ICC BVD Table → Assessed on project valuation per the 1994 Modified UBC 1-A Fee Table; valuation per February 2020 ICC BVD Table
- Fee schedule re-verified
South Jordan, Utah — fee schedule re-verified across 4 permit types
- Fee updated
Unincorporated Weber County, Utah — Solar Panel Permit fee record updated: Valuation-based per Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020). The flat $150 electrical fee explicitly excludes solar installations per § 12-3-8(1). → Valuation-based per Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020), using Building Valuation Data per § 12-3-7. The flat $150 electrical fee explicitly excludes solar installations per § 12-3-8(1); Title 12 publishes no separate flat solar fee, so the structural/installation permit is assessed on project valuation per the standard building-permit fee schedule.
- Fee updated
Unincorporated Weber County, Utah — Deck Permit fee record updated: Valuation-based per Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020) — same tier table as Residential Building Permit above. Valuation based on ICC Building Valuation Data. → Valuation-based per Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020) — same tier table as Residential Building Permit above. Valuation based on ICC Building Valuation Data per § 12-3-7.
- Fee updated
Unincorporated Weber County, Utah — Demolition Permit fee record updated: Valuation-based per Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020). Contact the Building Inspection Department at (801) 399-8770 to confirm the assigned valuation for demolition projects. → Valuation-based per Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020). Per § 12-3-7, if a valuation is not otherwise specified for the work, the building official determines and assigns the per-square-foot valuation.
- Fee updated
Boise, Idaho — Accessory Dwelling Unit (ADU) Permit fee record added: Residential Plan Review (1- and 2-family dwellings, townhouses, and accessory structures) (20% of the building permit fee)
- Fee updated
Boise, Idaho — Accessory Dwelling Unit (ADU) Permit fee record updated: Same valuation-based schedule as new residential construction (Table 1-A); residential plan review is 20% of permit fee → Same valuation-based schedule as new residential construction (Table 1-A): $26.37 + $2.95/$100 (up to $2,000); $70.76 + $12.71/$1,000 ($2,001–$25,000); $362.80 + $9.30/$1,000 ($25,001–$50,000); $595.30 + $6.35/$1,000 ($50,001–$100,000); $913.09 + $5.17/$1,000 ($100,001+)
- Fee schedule re-verified
Caldwell, Idaho — fee schedule re-verified across 1 permit type
- Fee schedule re-verified
Spanish Fork, Utah — fee schedule re-verified across 12 permit types
- Fee updated
West Jordan, Utah — Fence Permit fee record added: Fence Permit (issued as a building permit; fences over 6 ft) (Assessed on project valuation using West Jordan's building permit fee (base fee plus rate by valuation), per the FY2026 Consolidated Fee Schedule)
- Fee updated
West Jordan, Utah — Fence Permit fee record removed: Fence Permit
- New jurisdictions
1 new Colorado jurisdictions: Westminster
- New jurisdictions
3 new Wyoming jurisdictions: Casper, Cheyenne, Sheridan
- Fee updated
Arvada, Colorado — Plumbing Permit fee record added: Plumbing Permit Fee — valuation-based (general/new plumbing work not on the Table 18-5 flat-rate list) (Assessed as the Table 18-1 valuation-based Building Permit Fee (same schedule as new construction; see Residential Building Permit fee tiers, $34 minimum up to $5,669.25 + $3.45/$1,000 over $1M) plus Use Tax)
- Fee updated
Arvada, Colorado — Accessory Dwelling Unit (ADU) Permit fee record updated: Varies by valuation — see Residential Building Permit fee tiers (Table 18-1) → Varies by valuation — see Residential Building Permit fee tiers (Table 18-1: $34 minimum up to $5,669.25 + $3.45/$1,000 over $1M)
- Fee updated
Arvada, Colorado — Plumbing Permit fee record removed: Plumbing Permit Fee
- Fee updated
Aurora, Colorado — Accessory Dwelling Unit (ADU) Permit fee record updated: Billed per square foot by occupancy group per the 2026 New Building Construction Fee Table, or via the Permit Fee Calculator → $1.30 per square foot (R-3 occupancy group rate)
- Fee updated
Denver, Colorado — Accessory Dwelling Unit (ADU) Permit fee record added: Use Tax (construction materials, supplies, tools, equipment) (4.81% consumer's use tax on the cost of construction materials, supplies, tools, and equipment used on the Denver job (credit given for sales tax already paid, up to Denver's combined 8.81% rate))
- Fee updated
Denver, Colorado — Electrical Permit fee record updated: Per ADMIN 125/138 Table 1 valuation-based schedule (same table used for building permits); quick permits carry $0 plan review fee → Assessed on the electrical work's valuation using Denver's Building Permit and Plan Review Fee Schedule (ADMIN 125/138 Table 1) — e.g. $35 for $501–$2,000 valuation, $35 for the first $2,000 plus $8/each additional $1,000 up to $25,000, scaling up through the table's brackets to $5,385 for the first $1,000,000 plus $3.65/each additional $1,000 over that; quick permits carry $0 plan review fee (Table 2 valuation applies if higher than the applicant-submitted valuation)
- Fee updated
Denver, Colorado — Plumbing Permit fee record updated: Per ADMIN 125/138 Table 1 valuation-based schedule; quick permits carry $0 plan review fee → Assessed on the plumbing work's valuation using Denver's Building Permit and Plan Review Fee Schedule (ADMIN 125/138 Table 1) — e.g. $35 for $501–$2,000 valuation, $35 for the first $2,000 plus $8/each additional $1,000 up to $25,000, scaling up through the table's brackets to $5,385 for the first $1,000,000 plus $3.65/each additional $1,000 over that; quick permits carry $0 plan review fee (Table 2 valuation applies if higher than the applicant-submitted valuation)
- Fee updated
Denver, Colorado — Mechanical / HVAC Permit fee record updated: Per ADMIN 125/138 Table 1 valuation-based schedule; quick permits carry $0 plan review fee → Assessed on the mechanical/HVAC work's valuation using Denver's Building Permit and Plan Review Fee Schedule (ADMIN 125/138 Table 1) — e.g. $35 for $501–$2,000 valuation, $35 for the first $2,000 plus $8/each additional $1,000 up to $25,000, scaling up through the table's brackets to $5,385 for the first $1,000,000 plus $3.65/each additional $1,000 over that; quick permits carry $0 plan review fee (Table 2 valuation applies if higher than the applicant-submitted valuation)
- Fee updated
Denver, Colorado — Accessory Dwelling Unit (ADU) Permit fee record updated: Varies by valuation — see Residential Building Permit fee tiers (ADMIN 125/138 Table 1) → Assessed on total ADU construction valuation using ADMIN 125/138 Table 1 — e.g. $35 for $501–$2,000, $35 for the first $2,000 plus $8/each additional $1,000 up to $25,000, scaling up through the table's brackets to $5,385 for the first $1,000,000 plus $3.65/each additional $1,000 over that
- Fee updated
Denver, Colorado — Accessory Dwelling Unit (ADU) Permit fee record updated: 50% of the Building Permit Fee (valuation over $2,000) → 50% of the Building Permit Fee (for valuation tiers above $25,000; Table 1's 0%/50% column applies by valuation bracket)
- Fee updated
Lakewood, Colorado — Electrical Permit fee record added: Electrical Permit Fee — valuation-based (standard Building Permit Fee table) (Assessed on the electrical work's valuation (labor + materials) using Lakewood's standard Building Permit Fee table — $26.00 minimum (valuation $1.00-$500.00) scaling up to $5,570.15 for the first $1,000,000.00 plus $3.45 per additional $1,000.00)
- Fee updated
Lakewood, Colorado — Plumbing Permit fee record added: General Plumbing Permit Fee — valuation-based (standard Building Permit Fee table) (Assessed on the plumbing work's valuation (labor + materials) using Lakewood's standard Building Permit Fee table — $26.00 minimum (valuation $1.00-$500.00) scaling up to $5,570.15 for the first $1,000,000.00 plus $3.45 per additional $1,000.00)
- Fee updated
Lakewood, Colorado — Solar PV Permit fee record added: Solar PV / Alternative Energy Permit Fee — valuation-based (standard Building Permit Fee table) (Assessed on the solar installation's valuation (labor + materials for panels, racking, inverter, and grid-interconnection electrical work) using Lakewood's standard Building Permit Fee table — $26.00 minimum (valuation $1.00-$500.00) scaling up to $5,570.15 for the first $1,000,000.00 plus $3.45 per additional $1,000.00)
- Fee updated
Lakewood, Colorado — Solar PV Permit fee record removed: Solar PV / Alternative Energy Permit Fee
- Fee updated
Lakewood, Colorado — Electrical Permit fee record removed: Electrical Permit Fee
- Fee updated
Lakewood, Colorado — Plumbing Permit fee record removed: Other Plumbing Permit Fee (non-flat-fee scopes)
- Fee updated
Longmont, Colorado — Roofing Permit (Reroof) fee record added: Roofing Permit — valuation/contract-based (Primary Fee Schedule) (Assessed on the actual contract amount of the roofing work, applied against the Primary Fee Schedule's valuation-based Building Permit Fee table (from $27.00 minimum up to $6,448.55 + $4.20 per additional $1,000 over $1,000,000))
- Fee updated
Longmont, Colorado — Roofing Permit (Reroof) fee record added: Plan Review Fee (50% of the Building Permit Fee)
- Fee updated
Longmont, Colorado — Deck / Covered Patio Permit fee record updated: Per the Primary Fee Schedule, based on project valuation → Assessed on project valuation (gross floor area/scope of work × ICC Building Valuation Data or RS Means Building Construction Cost Data) applied to the Primary Fee Schedule's Building Permit Fee table: $27.00 minimum (valuation $1-$500), scaling up to $6,448.55 for the first $1,000,000 plus $4.20 per additional $1,000
- Fee updated
Longmont, Colorado — Roofing Permit (Reroof) fee record removed: Roofing Permit (not separately listed in flat-fee table)
- New jurisdictions
9 new Wyoming jurisdictions: Unincorporated Albany County, Unincorporated Campbell County, Unincorporated Fremont County, Unincorporated Laramie County, Unincorporated Natrona County, Unincorporated Sheridan County, Unincorporated Sweetwater County, Unincorporated Teton County, and 1 more
- Fee updated
Unincorporated Davis County, Utah — Electrical Permit fee record updated: Approximately $202 minimum → $202.00 minimum
- Fee updated
Unincorporated Davis County, Utah — Plumbing Permit fee record updated: Approximately $202 minimum → $202.00 minimum
- Fee updated
Unincorporated Davis County, Utah — Mechanical / HVAC Permit fee record updated: Approximately $202 minimum → $202.00 minimum
- Fee updated
Unincorporated Davis County, Utah — Solar Panel Permit fee record updated: Valuation-based per Davis County Code § 2.48.050(A), Ord. No. 4-2017 (minimum $200) → Valuation-based per Davis County Code § 2.48.050(A), Ord. No. 4-2017 (minimum $200.00)
- Fee updated
Unincorporated Davis County, Utah — Accessory Dwelling Unit (ADU) fee record updated: Per the Davis County Building Permit Fee Schedule (§ 2.48.050(A), Ord. No. 4-2017): minimum $200, scaling with project valuation → Per the Davis County Building Permit Fee Schedule (§ 2.48.050(A), Ord. No. 4-2017): minimum $200.00, scaling with project valuation
- Fee updated
Lakewood, Colorado — Roofing Permit (Reroof) fee record updated: $110.00 → $80.00
- Fee updated
Westminster, Colorado — Roofing Permit (Reroof) fee record updated: $100.00 → $80.00
June 30, 2026
- New jurisdictions
1 new Nevada jurisdictions: Las Vegas
- Fee updated
Carson City, Nevada — Residential Building Permit (New Construction) fee record updated: 1.5% of the total project value (per CCMC 15.05.020, Section 109.2) → 1.5% of the total project value, $65.00 minimum (per CCMC 15.05.020, Section 109.2)
- Fee updated
Carson City, Nevada — Residential Addition / Remodel Permit fee record updated: 1.5% of the total project value (per CCMC 15.05.020, Section 109.2) → 1.5% of the total project value, $65.00 minimum (per CCMC 15.05.020, Section 109.2)
- Fee updated
Carson City, Nevada — Plumbing Permit fee record updated: Water Service Lines: $95.00 + $25.00 each; Sewer Laterals: $95.00 + $25.00 each → $95.00 + $25.00 each
- Fee updated
Douglas County, Nevada — Residential Building Permit (New Construction) fee record updated: Varies — valuation-based using ICC Building Valuation Data Table × county area multiplier (1.19× valley standard; 1.42×–3.32× Tahoe); flat-fee items include Re-Roof $310.93, Solar $315.58, HVAC furnace/AC $167.93, Water Heater replacement $89.93, Pool in-ground $1,004.82 → Varies — valuation-based (ICC Building Valuation Data Table × county area multiplier: 1.19× valley standard, 1.42×–3.32× Tahoe)
- Fee updated
Douglas County, Nevada — Commercial Tenant Improvement Permit fee record updated: Varies — Commercial TI deducts 50% from IBC valuation table base rate; Group B Business base $263.16/sq ft (Type IIIB); apply 50% deduction = ~$131.58/sq ft, then × area multiplier (Valley Commercial 1.06×, Tahoe Commercial 1.20×) → Varies — valuation-based (Commercial TI deducts 50% from IBC table, then × area multiplier)
- Fee updated
Henderson, Nevada — Accessory Dwelling Unit (ADU) Permit fee record updated: Plan check from $2,945 (400 sf) to $4,040 (2,000 sf); Inspection from $796 (400 sf) to $2,877 (2,000 sf) → Varies by sq ft — plan check $2,945–$4,040; inspection $796–$2,877
- Fee updated
Henderson, Nevada — Accessory Dwelling Unit (ADU) Permit fee record updated: Plan check from $1,398 (200 sf) to $1,761 (2,000 sf); Inspection from $389 (200 sf) to $1,943 (2,000 sf) → Varies by sq ft — plan check $1,398–$1,761; inspection $389–$1,943
- Fee updated
Mesquite, Nevada — Commercial Tenant Improvement Permit fee record updated: Varies — valuation-based; cost factors from Table 3-J by construction type and use: e.g., Retail Type VB = $18.90/sq ft; Office Type VB = $23.60/sq ft; Restaurant Type VA/VB = $33.60/sq ft → Varies — valuation-based (Table 3-J cost factors), then per Table 3-A
- Fee schedule re-verified
North Las Vegas, Nevada — fee schedule re-verified across 8 permit types
- Fee updated
Reno, Nevada — Residential Addition / Remodel Permit fee record updated: Varies — valuation-based (see Permit Fee Table). For remodels/additions, valuation is based on overall construction cost of the project. → Varies — valuation-based (see Permit Fee Table)
- Fee updated
Sparks, Nevada — Roofing Permit fee record updated: Varies — valuation-based (see Sparks tiered permit fee table; typical residential re-roof is low valuation in the $23.50–$100 range) → Varies — valuation-based (see Sparks tiered permit fee table)
- Fee updated
Sparks, Nevada — Residential Addition / Remodel Permit fee record updated: Varies — valuation-based (see Sparks tiered permit fee table: $23.50 base up to $500; $69.25 + $14/$1,000 for $2,001–$25,000; etc.) → Varies — valuation-based (see Sparks tiered permit fee table)
- Fee updated
Unincorporated Washoe County, Nevada — Residential Addition / Remodel Permit fee record updated: Same tiered table as new construction: $45 minimum (≤$500); up to $3,469.62 + $5.07/$1,000 ($500k–$1M). Decks value at $15.00/sf; fences at $8.00/lf; carports at $20.00/sf; retaining walls at $15.00/lf. → Varies — valuation-based (same tiered table as new construction, $45 min)
- Fee updated
Unincorporated Washoe County, Nevada — Accessory Dwelling Unit (ADU) Permit fee record updated: Same tiered valuation table as new residential construction; a 500 sq ft minor ADU (Type VB, utility/misc. occupancy at $36.91–$64.30/sf) would typically fall in the $25,000–$50,000 valuation range: $443.62 + $10.90 per $1,000 over $25,000 → Varies — valuation-based (same tiered table as new residential construction)
- Fee updated
Unincorporated Washoe County, Nevada — Commercial Tenant Improvement Permit fee record updated: Same valuation table as residential; commercial occupancy costs per sf (Business group B, Type VB: ~$109.35/sf) used for valuation → Varies — valuation-based (same tiered table as residential)
- Fee updated
Unincorporated Washoe County, Nevada — Block / Screen Wall / Fence Permit fee record updated: Calculated using $8.00/lf valuation, then Table 1 tiered fee — e.g., 100 lf fence = $800 valuation = $45.00 + $3.36/additional $100 = ~$55.50 → Varies — valuation-based ($8.00/lf valuation, then Table 1 tiered fee)
- New jurisdictions
1 new Nevada jurisdictions: Mesquite
- New jurisdictions
1 new Colorado jurisdictions: Aurora
- New jurisdictions
1 new Nevada jurisdictions: Douglas County
- New jurisdictions
1 new Nevada jurisdictions: Unincorporated Clark County
- Codes updated
Unincorporated Salt Lake County, Utah — adopted-codes record updated
- + 2023 National Electrical Code (NEC) — adopted statewide and in force under Utah Code § 15A-2-103(1)(g); NOTE: MSD's own Codes and Design Criteria page still displays the 2020 NEC (not updated to the statewide edition) — the statewide 2023 NEC controls; confirm the enforced edition with MSD before starting electrical work
- − 2020 National Electrical Code (NEC) — as stated by MSD Codes and Design Criteria page; NOTE: statewide Utah Code § 15A-2-103(1)(g) adopts 2023 NEC, but MSD's own codes page explicitly lists 2020 NEC; confirm with MSD before starting electrical work
- Fee schedule re-verified
Unincorporated Weber County, Utah — fee schedule re-verified across 10 permit types
- Records updated
Unincorporated Weber County, Utah — permit-type records re-verified (24 updates)
- New jurisdictions
1 new Nevada jurisdictions: North Las Vegas
- Fee updated
Henderson, Nevada — Residential Reroof Permit fee record added: Reroof — Plan Check (100 sf) ($129)
- Fee updated
Henderson, Nevada — Residential Reroof Permit fee record added: Reroof — Inspection (100 sf) ($440)
- Fee updated
Henderson, Nevada — Residential Reroof Permit fee record removed: Residential roof replacement — building permit fee
- Fee schedule re-verified
Taylorsville, Utah — fee schedule re-verified across 9 permit types
- Records updated
Taylorsville, Utah — permit-type records re-verified (26 updates)
- Codes updated
Provo, Utah — adopted-codes record updated
- + 2021 International Fire Code (IFC) — per Provo City Building FAQ (provo.gov/Faq.aspx?QID=88) listing codes adopted as of July 1, 2021.
- + 2021 International Energy Conservation Code (IECC), commercial and residential editions — per Provo City Building FAQ (provo.gov/Faq.aspx?QID=88); effective through June 30, 2026; 2024 IECC takes effect July 1, 2026 per Utah Code § 15A-2-103.
- + 2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g). NOTE: Provo's own Building FAQ (provo.gov/Faq.aspx?QID=88) lists 'National Electric Code 2020 Edition' — this is STALE; the Utah statewide statute mandates the 2023 NEC, which supersedes the city FAQ.
- − 2021 International Fire Code (IFC) — per Provo City FAQ (provo.gov/Faq.aspx?TID=22) listing codes adopted as of July 1, 2021.
- − 2021 International Energy Conservation Code (IECC), commercial and residential editions — per Provo City FAQ (provo.gov/Faq.aspx?TID=22); effective through June 30, 2026; 2024 IECC takes effect July 1, 2026 per Utah Code § 15A-2-103.
- − 2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g). NOTE: Provo's own FAQ page (last updated 2021) lists 2020 NEC; the Utah statewide statute requires 2023 NEC, which supersedes the city FAQ.
- Fee schedule re-verified
Provo, Utah — fee schedule re-verified across 10 permit types
- Fee updated
Las Vegas, Nevada — Accessory Dwelling Unit (ADU / Guest House — Class I Accessory Structure) fee record added: ADU building permit (Class I accessory structure — same fee schedule as new residential construction, based on square footage) (Varies — same valuation/sqft schedule as new residential construction)
- Fee updated
Las Vegas, Nevada — Accessory Dwelling Unit (ADU / Guest House — Class I Accessory Structure) fee record added: Special Use Permit (Planning Department) (Varies)
- Fee updated
Las Vegas, Nevada — Accessory Dwelling Unit (ADU / Guest House — Class I Accessory Structure) fee record removed: ADU construction (treated as new residential construction — fee based on square footage)
- Timeline updated
Las Vegas, Nevada — plan-review timeline record updated: 10–14 business days
- Timeline updated
Las Vegas, Nevada — plan-review timeline record updated: 10–21 business days
- Fee schedule re-verified
Draper, Utah — fee schedule re-verified across 12 permit types
- Records updated
Draper, Utah — permit-type records re-verified (21 updates)
- Fee schedule re-verified
Unincorporated Cache County, Utah — fee schedule re-verified across 13 permit types
- Records updated
Unincorporated Cache County, Utah — permit-type records re-verified (21 updates)
- Fee schedule re-verified
Eagle Mountain, Utah — fee schedule re-verified across 7 permit types
- Records updated
Eagle Mountain, Utah — permit-type records re-verified (28 updates)
- Permit type added
Eagle Mountain, Utah — Accessory Dwelling Unit (ADU) Permit record added
- New jurisdictions
1 new Colorado jurisdictions: Lakewood
- Fee schedule re-verified
South Jordan, Utah — fee schedule re-verified across 15 permit types
- Records updated
South Jordan, Utah — permit-type records re-verified (19 updates)
- Fee schedule re-verified
Unincorporated Salt Lake County, Utah — fee schedule re-verified across 11 permit types
- Records updated
Unincorporated Salt Lake County, Utah — permit-type records re-verified (22 updates)
- New jurisdictions
1 new Colorado jurisdictions: Boulder
- Fee updated
Unincorporated Washoe County, Nevada — Demolition Permit fee record updated: Valuation-based per Table 1 (minimum $45.00) → Valuation-based per WCC Table 1 — $45.00 minimum
- Fee updated
North Las Vegas, Nevada — Solar Photovoltaic (PV) Permit fee record updated: Varies — based on contract price or installed cost of the solar system; fee per Table 3-A → Varies — valuation-based on total installed cost (contract price) of the solar system; fee per Table 3-A
- Fee schedule re-verified
Orem, Utah — fee schedule re-verified across 8 permit types
- Records updated
Orem, Utah — permit-type records re-verified (29 updates)
- Fee schedule re-verified
Carson City, Nevada — fee schedule re-verified across 6 permit types
- Fee schedule re-verified
Layton, Utah — fee schedule re-verified across 13 permit types
- Records updated
Layton, Utah — permit-type records re-verified (20 updates)
- New jurisdictions
1 new Nevada jurisdictions: Henderson
- New jurisdictions
1 new Colorado jurisdictions: Fort Collins