Unincorporated Washington County building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Washington County, Colorado.
Last verified 2026-07-06 · Source · Embed this page’s badge · Version history
Building department
- Address
- Washington County Courthouse, 150 Ash Avenue, 2nd Floor, Akron, CO 80720
- Phone
- (970) 345-2701 ext. 234 (fax (970) 514-7710, per the department's live webpage — resolved as current: a 2020 Wayback capture of the same page shows fax 345-2702 with then-Zoning-Official Denise Chavez named, while the live page today shows no named official ('temporary') and the new fax, indicating the webpage was updated since 2020 and the number changed; the Building Permit Application form (Rev. 06-14, unrevised since 2014) still carries the older 345-2702 and is treated as stale on this one field)
- Office hours
- Not published as specific hours for this department; the County's website states only that proposed regulations are available for inspection 'during normal business hours' at 150 Ash Avenue. The Planning Commission's regular meeting is the third Monday of each month at 7:00 p.m. in the old courtroom at the Courthouse (date subject to change).
- Website
- Official site
Inspection guide
See how inspections work in Unincorporated Washington County — sequence, scheduling & re-inspection fees.
Codes adopted
Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.
- No model building code (IBC/IRC/NEC) found published online — see the FAQ below for what governs instead
- Manufactured/mobile homes: Colorado Division of Housing state standards apply, not a county-adopted code
- County Zoning Resolution is in force but not published online — full scope on this point unconfirmed
HB22-1362 (2022), Colorado's statewide model energy and low-carbon code law, exempts jurisdictions under 2,500 residents. Show full textShow less
HB22-1362 (2022), Colorado's statewide model energy and low-carbon code law, exempts jurisdictions under 2,500 residents. Unincorporated Washington County is roughly 3,060 people -- county total 4,817 per the 2020 Census, minus Akron's 1,757, Akron being the county's only incorporated municipality -- so the population exemption does not apply on its own. The law's model-code mandate attaches only when a jurisdiction adopts or updates a building code, and no affirmatively adopted county building code, energy or otherwise, is published anywhere findable, so there is no trigger event on record. The County's Zoning Resolution is not published online, so treat this as nothing found rather than a certainty that nothing exists. If the County adopts or updates any code, the Model Low Energy and Carbon Code requirement binds any update after July 1, 2026. Confirm current requirements with the County before designing to an energy code.
Permit types & fees
Building Permit (New Construction, Addition, Remodel, Accessory Structures)
Washington County's general Building Permit Application covers new construction, additions, and remodels for residences (including manufactured homes checked as a class of work on this same form) plus accessory structures — out buildings (barns, shops, machine sheds), grain bins, garages, room additions, and decks with attached roofs or screened porches. Reviewed and approved by the County Commissioner Chairman via the Land Use Office. Review focuses on zoning and placement compliance (legal description, road access, construction materials, foundation type, size, sewer/water source) rather than a technical model-code plan review — see the FAQ below for a note on the County's separate, not-online-published Zoning Resolution.
From$100.00Commercial Building Permit (Use by Special Review)
Washington County issues commercial building permits through the same general Building Permit Application (Rev. 06-14) used for residential construction, rather than a separate commercial form — but the application's own fee grid carries a distinct, higher fee tier for a commercial-use building approved under Use by Special Review (USBR): $150.00, versus $100.00 for other buildings. Commercial, mixed-use, and industrial USE of the property is a separate zoning gate from the building permit itself: it requires a USBR application, a public-hearing process through the Planning Commission and then the Board of County Commissioners, adopted by Resolution 2004-68 (April 20, 2004), with CMRS/wind-tower uses added by Resolution 2004-142 (September 21, 2004) and site-plan amendments added by Resolution 2004-181 (December 30, 2004), all per the USBR application form's own citation of its adopting resolutions. The USBR form's enumerated 'Principal Permitted Uses' for Community Business, Mixed Use Development, and Industrial Uses establish that commercial and industrial use categories exist in the county's zoning scheme, even though the County has not published its underlying Zoning Resolution online.
From$150.00Mobile or Manufactured Home Permit (with Foundation Permit if applicable)
A separate application (distinct from the general Building Permit) for placing a mobile or manufactured home in unincorporated Washington County. Installation and inspection standards are set by the Colorado Division of Housing (state), not a county-adopted code; the County collects its own permit fee and the state's inspection/insignia fee, arranges the state-required inspection, and — if the unit will sit on a permanent foundation or basement — requires a separate Foundation Permit using the same County-designated inspector.
From$100.00Small Solar Energy Conversion System (SECS) Permit — Rooftop/Accessory Solar
Washington County's Solar Power Production Facilities Zoning Regulations define a 'Small Solar Energy Conversion System' (small SECS) as a solar energy conversion system occupying less than 7 acres of total land that is an accessory use (i.e., primarily energy production by the property owner where it is sited) — this covers ordinary residential rooftop and small ground-mount solar. Per the regulations: 'All small SECS require a building permit from the County' and small SECS are explicitly EXEMPT from the county's Solar Power Production Facility (SPPF) regulations, which instead require a Use by Special Review plus a building permit for larger, non-accessory, or 7+ acre commercial solar farms. A small SECS therefore uses the same general Building Permit Application as other construction (see residential-building-permit) — there is no dedicated solar application form or published flat fee, but Colorado's statewide fee cap on active solar energy system permits applies regardless of any locally calculated valuation-based fee.
From$500.00valuation-basedElectric Vehicle (EV) Charging Station / EVSE Permit
Unincorporated Washington County has no dedicated EV charger/EVSE permit application, fee, or process. Like the county's small solar (SECS) permit, an EV charging station installation would be handled through the county's single general Building Permit Application (Rev. 06-14), the same declared-value-based form used for all other construction and electrical work here, since the Land Use Office does not maintain a separate trade-specific electrical permit or in-house electrical inspector distinct from the general building permit. Because Washington County has not retained its own local electrical inspection program, the electrical/EVSE-circuit component of an EV charger installation instead falls under the Colorado State Electrical Board (DORA/DPO)'s statewide permit and fee schedule, per DORA's own published jurisdictional framework for unincorporated areas without a local electrical program. Washington County's population (approximately 4,700) is well below the 20,000-person threshold that triggers 'covered county' status under Colorado's HB24-1173 (Electric Vehicle Charging System Permits Act, effective 8/7/2024), so the statute's model-code/objective-standards adoption mandate and 3-business-day decision-notification requirement do not apply to this jurisdiction.
From$90valuation-basedSign Permit
Unincorporated Washington County publishes no dedicated local sign-permit application, sign ordinance, or sign fee schedule online. The current Planning & Zoning department webpage and the Planning and Zoning Forms page list only Building/Foundation/Mobile-Home permits, USBR (Use by Special Review) and its amendment/extinguishment forms, Subdivision Exemption, Temporary Use, Road Access/Road Cut, Petition for Vacation, Address Request, and similar land-use forms — no sign-specific document appears among them. The County's own Zoning Resolution is currently in force (see localAmendments) but is not published online anywhere reachable, so ask the County Land Use Office directly about any on-premise sign standard it may contain. The one sourced sign-permitting mechanism that reaches unincorporated Washington County is the Colorado Department of Transportation's (CDOT) statewide Outdoor Advertising Permit program, which regulates OFF-PREMISE advertising devices (billboards) within CDOT's 'control area' adjacent to the state highway system under the Colorado Outdoor Advertising Act (C.R.S. Title 43, Article 1, Part 4) — state highways cross the county's unincorporated area. That state permit application requires Part 3 to be completed and signed by 'the representative of the local jurisdiction' (i.e., Washington County) certifying the site's zoning classification and compliance with local ordinances, giving the County Land Use Office a real, sourced role even though CDOT itself issues the permit.
From$10.00Fire Sprinkler / Fire Alarm System Permit
Fire protection for unincorporated Washington County is split among small, geographically distinct rural fire protection districts rather than one countywide authority: Akron Rural Fire Protection District (around Akron), Otis Rural Fire Protection District (around Otis, ~65 sq mi), and Southwest Washington County Fire Protection District (Anton, Last Chance, Lindon, Cope, Woodrow, and other southern/western communities, ~980 sq mi), all dispatched through the shared Washington/Yuma Combined Communications Center. None of the three publishes an official department website carrying a permit, plan-review, or fee process — each is reachable only through third-party directory listings or, in one case, a Facebook page. For FIRE SPRINKLER / SUPPRESSION systems specifically, Colorado's statewide Fire Suppression Program rule, 8 CCR 1507-11 § 2.2, defines the default 'Authority Having Jurisdiction' (AHJ) as 'the Division [of Fire Prevention and Control, DFPC], unless delegated to a Local Authority Having Jurisdiction having Fire Suppression Systems Inspectors certified to the appropriate level' — none of the three local rural districts is listed as employing DFPC-certified Fire Suppression Systems Inspectors, so DFPC itself is the best-sourced default AHJ and permit issuer for a fire sprinkler/suppression system installed in unincorporated Washington County. FIRE ALARM systems are a separate, unresolved gap: DFPC's Fire Suppression Program rule (8 CCR 1507-11) governs suppression/sprinkler systems, not fire alarm systems, and Colorado does not operate a state-level fire alarm permitting program — alarm permits are established locally under each jurisdiction's adopted fire code. Washington County publishes no fire code adoption online, consistent with the absence of a published model building code noted in the code-adoption entry, and none of the three local fire districts publish an alarm-permitting process online, so no fire-alarm permit process can be documented for this jurisdiction.
From$800.00valuation-basedChange of Use Permit
Unincorporated Washington County has no distinct 'Change of Use Permit' application, procedure, or fee. Neither the current Planning & Zoning department webpage nor the Planning and Zoning Forms page lists any change-of-use-specific document among the County's full published set of land-use forms (Building Permit, Foundation Permit, Mobile/Manufactured Home Permit, USBR and its Amend/Extinguish forms, Subdivision Exemption, Temporary Use, Road Access, Road Cut, Petition for Vacation, Request for Address). A change of use is instead handled through one of two existing mechanisms, depending on what is actually changing: (1) a change to a commercial, mixed-use, or industrial USE of land (as distinct from the building itself) requires a 'Use by Special Review' (USBR) application — a public-hearing zoning-approval process under Resolution 2004-68 with its own $500.00 Administrative Review Fee, $150.00 Sign Posting Fee, and recording fees; or (2) a physical remodel/change tied to an existing building routes through the County's general Building Permit Application (Rev. 06-14), whose 'Class of work' options include 'Remodel' as one of only four checkboxes. Neither mechanism is labeled or fee-structured as a dedicated 'change of use permit' the way, for example, Northglenn's UDO Sec. 11-6-5(d) is.
See fee schedule
Unincorporated Washington County's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Unincorporated Washington County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Unincorporated Washington County lands. Privacy.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-07)
- 0units
0 buildings · $0 valuation
- Trailing 12 months
- 1units
12 of 12 months reported · #77 in Colorado coverage by units
- Year to date (2026 YTD through 2026-07)
- 1units
1 buildings · $275,014 valuation
- Full year 2025
- 3units
3 buildings · $825,042 valuation
County-wide figures: Unincorporated remainder of Washington County, Colorado (county FIPS 121, full code 08-121). BPS county-level totals include incorporated Akron; no distinct unincorporated-only BPS row exists.
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity
Tips & gotchas
- Washington County's Land Use Office is a real, active permitting authority for the unincorporated area — it issues Building, Foundation, and Mobile/Manufactured Home permits, and reviews land-use applications like Subdivision Exemptions and Use by Special Review.
- No model building code (IBC/IRC/NEC) turned up in the County's application forms or its online Ordinances page — general construction review reads as zoning and placement compliance (setbacks, legal description, foundation type) rather than a technical code-based plan review. That said, the County does maintain a separate Zoning Resolution that isn't published online, so it's worth asking the Land Use Office directly whether any building-code standard applies to your specific project before you assume there's none.
- Manufactured and mobile home installation follows Colorado Division of Housing state standards, not a county-written code. Budget for three separate charges: a $100 county permit fee, a $435 state inspection/insignia fee, and a 1.5% use tax on the home's declared value — plus a separate $100 foundation permit if the home sits on a permanent foundation or basement.
- Well and septic permits are handled by a separate agency, the Northeast Colorado Health Department (NCHD) — not the County. NCHD's Washington County office: 482 Adams Ave., Akron, CO 80720, (970) 345-6562. Start that application in parallel, since the County requires evidence of it before issuing a building or mobile-home permit.
- There's no published turnaround time for permit review, and the general Building Permit fee is calculated from your declared project value rather than a posted rate table — call the Land Use Office, (970) 345-2701 ext. 234, for a fee estimate or timeline before you apply.