Electric Vehicle (EV) Charging Station / EVSE Permit in Unincorporated Washington County, Colorado
Unincorporated Washington County has no dedicated EV charger/EVSE permit application, fee, or process. Like the county's small solar (SECS) permit, an EV charging station installation would be handled through the county's single general Building Permit Application (Rev. 06-14), the same declared-value-based form used for all other construction and electrical work here, since the Land Use Office does not maintain a separate trade-specific electrical permit or in-house electrical inspector distinct from the general building permit. Because Washington County has not retained its own local electrical inspection program, the electrical/EVSE-circuit component of an EV charger installation instead falls under the Colorado State Electrical Board (DORA/DPO)'s statewide permit and fee schedule, per DORA's own published jurisdictional framework for unincorporated areas without a local electrical program. Washington County's population (approximately 4,700) is well below the 20,000-person threshold that triggers 'covered county' status under Colorado's HB24-1173 (Electric Vehicle Charging System Permits Act, effective 8/7/2024), so the statute's model-code/objective-standards adoption mandate and 3-business-day decision-notification requirement do not apply to this jurisdiction.
Verified 2026-07-20 · Source
When you need this permit
- No standalone EV charger/EVSE permit application exists; use the county's general Building Permit Application (Rev. 06-14), the same form used for other construction and electrical work
- Total declared value of the work is used by County staff to calculate the permit fee at approval, per the same mechanism used for all other Washington County building permits
- Colorado's HB24-1173 (EV Charging System Permits Act) does not apply to Washington County as a mandatory 'covered county,' since its population (~4,700) falls well below the statute's 20,000-person county threshold
- Property owner and Commissioner Chairman signatures required, per the standard Building Permit Application process
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Commissioner Chairman Review & Approval
Same general approval step used for other Building Permit Applications; the county's forms do not describe a separate multi-stage field-inspection sequence specific to electrical or EV charger work
Tips
- There is no dedicated EV charger permit category or application in Washington County -- use the same general Building Permit Application used for a small solar system or any other construction/electrical work.
- Washington County's small population keeps it outside Colorado HB24-1173's mandatory EV-permitting-standards requirement (20,000+ population threshold for counties), unlike larger Front Range counties.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Washington County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Washington County
Electric Vehicle (EV) Charging Station / EVSE Permit in other cities
Compare electric vehicle (ev) charging station / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Washington County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Washington County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →