Small Solar Energy Conversion System (SECS) Permit — Rooftop/Accessory Solar — Unincorporated Washington County, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://web.archive.org/web/20250821171659/https://washingtoncounty.colorado.gov/sites/washingtoncounty/files/documents/Solar%20Regs%20-%20080725%20Clean%20.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Small Solar Energy Conversion System (SECS) Permit — Rooftop/Accessory Solar in Unincorporated Washington County, Colorado
Washington County's Solar Power Production Facilities Zoning Regulations define a 'Small Solar Energy Conversion System' (small SECS) as a solar energy conversion system occupying less than 7 acres of total land that is an accessory use (i.e., primarily energy production by the property owner where it is sited) — this covers ordinary residential rooftop and small ground-mount solar. Per the regulations: 'All small SECS require a building permit from the County' and small SECS are explicitly EXEMPT from the county's Solar Power Production Facility (SPPF) regulations, which instead require a Use by Special Review plus a building permit for larger, non-accessory, or 7+ acre commercial solar farms. A small SECS therefore uses the same general Building Permit Application as other construction (see residential-building-permit) — there is no dedicated solar application form or published flat fee, but Colorado's statewide fee cap on active solar energy system permits applies regardless of any locally calculated valuation-based fee.
Verified 2026-07-20 · Source
When you need this permit
- A 'small SECS' (solar energy conversion system under 7 acres of total land, accessory to the principal use/structure on the same lot, primarily for the property owner's own energy production) is exempt from the county's SPPF (Solar Power Production Facility) zoning regulations and Use by Special Review process — see Washington County Solar Power Production Facilities Zoning Regulations, Sections 2.C and 4 (definitions)
- A small SECS still requires a building permit from the County, per the regulations' definition of 'Small Solar Energy Conversion System': 'All small SECS require a building permit from the County'
- Use the same general Building Permit Application (Rev. 06-14) used for other construction/additions/accessory structures — no separate solar-specific application form was found published
- Colorado's statewide fee cap (C.R.S. § 24-48.5-113, enacted by HB21-1284) limits the aggregate of all fees a Colorado local government may charge to install an active solar energy system to the lesser of actual permit-issuance/review costs or $500.00 for a residential permit / $1,000.00 for a nonresidential (commercial) permit — this cap applies to Washington County's building permit fee for a small SECS regardless of the county's own declared-value-based fee calculation
- A larger installation (7+ acres, or not accessory to the property owner's own use — an SPPF) instead requires a Use by Special Review application plus a building permit, under the full Solar Power Production Facilities Zoning Regulations — out of scope for a typical residential/rooftop system
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Commissioner Chairman Review & Approval
Same general approval step used for other Building Permit Applications; the county's forms do not describe a separate multi-stage field-inspection sequence for a small SECS
Tips
- Do not confuse a small residential/rooftop system with a Solar Power Production Facility (SPPF) — an SPPF is 7+ acres or not accessory to the owner's own use, and requires a Use by Special Review in addition to a building permit; a small SECS (under 7 acres, accessory, owner's own energy production) is explicitly exempted from that heavier process.
- Even though Washington County has no published solar-specific fee, Colorado's statewide HB21-1284 fee cap ($500 residential / $1,000 nonresidential, or actual cost if lower) legally limits what the county can charge for a small SECS building permit — cite this if the county's declared-value-based fee calculation would otherwise exceed the cap.
- As with all electrical work referenced elsewhere in this file, confirm with the Land Use Office whether the PV interconnection itself is inspected by the county's designated inspector or routed through a state program — this file did not find a dedicated county electrical-permit process distinct from the general Building Permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Washington County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Washington County
Small Solar Energy Conversion System (SECS) Permit — Rooftop/Accessory Solar in other cities
Look up this fee in a different city →
Now live
Build your Unincorporated Washington County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Washington County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →