Inspection sequence, scheduling, and re-inspection fees for building permits in Springfield, Colorado.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
748 Main Street, PO Box 4, Springfield, CO 81073
Phone
719-523-4528
Office hours
Town Hall main line (719) 523-4528; fax (719) 523-6956 (also seen as 523-6945 on a separate form). Springfield is a statutory town (not home-rule) and does not maintain a standalone 'Building Department' — building permit intake, zoning review, and issuance are handled directly by Town Hall staff (Town Clerk / Town Manager) with Board of Trustees oversight, per Springfield Municipal Code Chapter 16 (Zoning) and the Town's Master Fee Schedule.

Published scheduling rules

  • The Town does not inspect electrical or plumbing work itself — both trades are inspected by Colorado State Electrical and Plumbing Inspectors. Coordinate state inspection scheduling directly rather than expecting a Town building inspector to show up. (Building Permit)

Inspection sequence

Applies to: Building Permit

  1. 1

    Town zoning/setback review

    Conducted by Town Hall staff as part of permit issuance; checks zoning district compliance, variance, or special use permit status

  2. 2

    State Electrical Inspection

    Performed by the Colorado State Electrical Inspector, not Town staff, per Ordinance No. 355 Sec. 13-158 and the permit application's own Inspections checklist

  3. 3

    State Plumbing Inspection

    Performed by Colorado state plumbing inspectors, not Town staff, per the permit application's Inspections checklist

Applies to: Electric Vehicle (EV) Charging Station Permit

  1. 1

    Town Building Inspection (if applicable)

    Structural/foundation compliance for a charging pedestal, canopy, or similar structure, if the installation triggers a Town Building Permit

  2. 2

    State Electrical Inspection

    Conducted by the Colorado State Electrical Inspector per Springfield Ordinance No. 355 (Sec. 13-158), not a Town employee

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Town Building Inspection

    Structural/roof-mount or ground-mount foundation compliance

  2. 2

    State Electrical Inspection

    Conducted by the Colorado State Electrical Inspector per Springfield Ordinance No. 355 (Sec. 13-158), not a Town employee

Springfield building permits

Get alerts for Springfield

We'll email you when Springfield's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.