Plumbing Permit (State-Administered) in Springfield, Colorado

Plumbing work within Springfield town limits is inspected by Colorado state plumbing inspectors rather than the Town itself. The Town's Building Permit Application lists 'State plumbing' as an inspection to be conducted, and the Town's now-repealed Sec. 18-3(10) (Ordinance No. 355) explicitly stated that plumbing issues are governed by 'the electrical and plumbing codes required by the State of Colorado' with 'Colorado State Electrical and Plumbing inspectors' used for those inspections — a policy the Town's current permit form confirms is still followed in practice even though that specific code section was later repealed along with the rest of Chapter 18.

Verified 2026-07-06 · Source

When you need this permit

  • Plumbing work is inspected by Colorado state plumbing inspectors, not Town of Springfield staff
  • Water and sewer service type/size must be documented on the Town's Building Permit Application (officer-initialed field)
  • No standalone Town of Springfield plumbing permit fee is published in the Master Fee Schedule

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

No standalone Town plumbing permit fee publishedChecked the Town's full Master Fee Schedule (Resolution 25-07) directly; no separate plumbing line-item fee exists.
Not applicable — see Building Permit Application Fee ($50.00) and Building Cost Fee ($1.00/$1,000, max $2,000.00)

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit (State-Administered) permit actually take in Springfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Plumbing Inspection

    Performed by a Colorado state plumbing inspector rather than a Town of Springfield building official

See the full Springfield inspection guide — scheduling & re-inspection fees →

Tips

  • As with electrical work, plumbing inspections in Springfield are a Colorado state function, not a Town one — confirm your plumber holds a current Colorado DORA plumbing license.

Frequently asked questions

Springfield requires a plumbing permit (state-administered) for: Plumbing work is inspected by Colorado state plumbing inspectors, not Town of Springfield staff; Water and sewer service type/size must be documented on the Town's Building Permit Application (officer-initialed field); No standalone Town of Springfield plumbing permit fee is published in the Master Fee Schedule. If your project isn't listed, confirm with Town of Springfield (Town Clerk / Town Manager's Office) at 719-523-4528 before starting work.

In Springfield, the published No standalone Town plumbing permit fee published is: Not applicable — see Building Permit Application Fee ($50.00) and Building Cost Fee ($1.00/$1,000, max $2,000.00). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Springfield does not publish a plan-review timeline for this permit. Contact Town of Springfield (Town Clerk / Town Manager's Office) at 719-523-4528 for current turnaround.

You'll need: Building Permit Application (Town of Springfield) — Water/Sewer Service section. See the required-documents checklist on this page for details on each.

Springfield requires 1 inspection(s) for a plumbing permit (state-administered), in order: State Plumbing Inspection. Schedule each through Town of Springfield (Town Clerk / Town Manager's Office) (719-523-4528).

Apply through Town of Springfield (Town Clerk / Town Manager's Office) at 748 Main Street, PO Box 4, Springfield, CO 81073. Phone: 719-523-4528, email: mmcginnis@springfieldco.gov. Office hours: Town Hall main line (719) 523-4528; fax (719) 523-6956 (also seen as 523-6945 on a separate form). Springfield is a statutory town (not home-rule) and does not maintain a standalone 'Building Department' — building permit intake, zoning review, and issuance are handled directly by Town Hall staff (Town Clerk / Town Manager) with Board of Trustees oversight, per Springfield Municipal Code Chapter 16 (Zoning) and the Town's Master Fee Schedule.. Official information: https://www.springfieldco.gov/.

Springfield, Colorado has adopted: NONE CURRENTLY ADOPTED — verified by ordinance history, not assumed. The Town of Springfield originally adopted the International Building Code, 2006 edition, on July 10, 2008. Ordinance No. 355 (introduced Feb. 9, 2023; passed second reading March 9, 2023) repealed and re-adopted Sec. 18-1 of the Municipal Code, re-confirming the 2006 IBC with Town-specific geographic limits (Sec. 18-3). HOWEVER, Ordinance No. 356 (introduced June 8, 2023; passed and published July 13, 2023) subsequently REPEALED Chapter 18, Article I, Sec. 18-1 through 18-3 IN THEIR ENTIRETY, including the 2006 IBC adoption itself and all the geographic-limits provisions (frost depth, wind load, snow load, seismic category, etc.). No later ordinance (reviewed the Town's full ordinance archive through Ordinance No. 365, current as of this review) re-adopts any building code edition. As of 2026-07-06, Springfield therefore has NO adopted building code (no IBC/IRC/IMC/IPC/IECC edition) on its books.; Despite the repealed building code, the Town continues to operate an active Building Permit process governed by Springfield Municipal Code Chapter 16 (Zoning) rather than Chapter 18 (Building Code) — the current Building Permit Application form (dated 03.25.2025) explicitly states the applicant 'agrees to comply with Springfield Municipal Code, Chapter 16 by which this permit is granted' and cites 'MUNICODE CHAPTER 16-ZONING' as the governing authority for the permit's underlying agreement. This is a zoning/land-use permit and property/setback review, not a code-compliance plan review against a specific model code edition.; Electrical and plumbing work is NOT reviewed or inspected by the Town at all — Ordinance No. 355 (Sec. 13-158, as re-adopted, still in force) defines the 'electrical inspector' as 'the Colorado State Electrical Inspector assigned by the State of Colorado to perform electrical inspections for the Town of Springfield,' and the same ordinance's Sec. 18-3(10) (since repealed along with the rest of Sec. 18-3, but consistent with current practice) stated that electrical and plumbing issues are governed by 'the electrical and plumbing codes required by the State of Colorado.' The current Building Permit Application form itself lists only 'State electrical' and 'State plumbing' under its Inspections checklist — confirming Springfield defers both trades entirely to Colorado DORA/state inspection programs rather than running its own trade-permit or trade-inspection process.. Local amendments apply — see the Springfield overview page for the full list.

No. The Town's Building Permit Application lists 'State plumbing' as the applicable inspection, and Town practice (consistent with the now-repealed Sec. 18-3(10) of Ordinance No. 355) is to rely on Colorado state plumbing inspectors rather than a Town building official.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Springfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.