Demolition (via Building Permit) in Springfield, Colorado

The Town of Springfield does not publish a standalone demolition permit application or fee separate from its general Building Permit process. No distinct 'demolition permit' document, fee line, or ordinance provision appears in the Town's Master Fee Schedule, its ordinance archive, or the Building Permit Application.

Reviewed 2026-07-06 · Source

When you need this permit

  • No standalone demolition permit process or fee is published by the Town of Springfield as of the last verification — demolition work, if regulated at all, would presumably be handled through the general Building Permit Application process, but no explicit demolition-specific requirement, checklist, or fee was located

Required documents

Check off what you have — your progress is saved on this device.

    Fee schedule

    Filing fee
    Not published — contact the department

    Review timeline

    Plan review
    Not published — contact the department

    How long did your Demolition (via Building Permit) permit actually take in Springfield?

    Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

    Inspection process

      See the full Springfield inspection guide — scheduling & re-inspection fees →

      Tips

      • Do not assume Springfield has a standalone demolition permit fee or process distinct from its general Building Permit — none appears in the Town's document archive (Master Fee Schedule, all ordinances through No. 365, and 2023-2025 resolutions). Contact Town Hall (719-523-4528) to confirm current practice for any specific demolition project.
      • Because the Town's building code was repealed in full in 2023 and never re-adopted, there is no local IBC/IEBC demolition-specific chapter in force either — another reason no standalone demolition permit provision was found.

      Frequently asked questions

      Springfield requires a demolition (via building permit) for: No standalone demolition permit process or fee is published by the Town of Springfield as of the last verification — demolition work, if regulated at all, would presumably be handled through the general Building Permit Application process, but no explicit demolition-specific requirement, checklist, or fee was located. If your project isn't listed, confirm with Town of Springfield (Town Clerk / Town Manager's Office) at 719-523-4528 before starting work.

      Springfield does not publish a plan-review timeline for this permit. Contact Town of Springfield (Town Clerk / Town Manager's Office) at 719-523-4528 for current turnaround.

      Apply through Town of Springfield (Town Clerk / Town Manager's Office) at 748 Main Street, PO Box 4, Springfield, CO 81073. Phone: 719-523-4528, email: mmcginnis@springfieldco.gov. Office hours: Town Hall main line (719) 523-4528; fax (719) 523-6956 (also seen as 523-6945 on a separate form). Springfield is a statutory town (not home-rule) and does not maintain a standalone 'Building Department' — building permit intake, zoning review, and issuance are handled directly by Town Hall staff (Town Clerk / Town Manager) with Board of Trustees oversight, per Springfield Municipal Code Chapter 16 (Zoning) and the Town's Master Fee Schedule.. Official information: https://www.springfieldco.gov/.

      Springfield, Colorado has adopted: NONE CURRENTLY ADOPTED — verified by ordinance history, not assumed. The Town of Springfield originally adopted the International Building Code, 2006 edition, on July 10, 2008. Ordinance No. 355 (introduced Feb. 9, 2023; passed second reading March 9, 2023) repealed and re-adopted Sec. 18-1 of the Municipal Code, re-confirming the 2006 IBC with Town-specific geographic limits (Sec. 18-3). HOWEVER, Ordinance No. 356 (introduced June 8, 2023; passed and published July 13, 2023) subsequently REPEALED Chapter 18, Article I, Sec. 18-1 through 18-3 IN THEIR ENTIRETY, including the 2006 IBC adoption itself and all the geographic-limits provisions (frost depth, wind load, snow load, seismic category, etc.). No later ordinance (reviewed the Town's full ordinance archive through Ordinance No. 365, current as of the last verification) re-adopts any building code edition. As of 2026-07-06, Springfield therefore has NO adopted building code (no IBC/IRC/IMC/IPC/IECC edition) on its books.; Despite the repealed building code, the Town continues to operate an active Building Permit process governed by Springfield Municipal Code Chapter 16 (Zoning) rather than Chapter 18 (Building Code) — the current Building Permit Application form (dated 03.25.2025) explicitly states the applicant 'agrees to comply with Springfield Municipal Code, Chapter 16 by which this permit is granted' and cites 'MUNICODE CHAPTER 16-ZONING' as the governing authority for the permit's underlying agreement. This is a zoning/land-use permit and property/setback review, not a code-compliance plan review against a specific model code edition.; Electrical and plumbing work is NOT reviewed or inspected by the Town at all — Ordinance No. 355 (Sec. 13-158, as re-adopted, still in force) defines the 'electrical inspector' as 'the Colorado State Electrical Inspector assigned by the State of Colorado to perform electrical inspections for the Town of Springfield,' and the same ordinance's Sec. 18-3(10) (since repealed along with the rest of Sec. 18-3, but consistent with current practice) stated that electrical and plumbing issues are governed by 'the electrical and plumbing codes required by the State of Colorado.' The current Building Permit Application form itself lists only 'State electrical' and 'State plumbing' under its Inspections checklist — confirming Springfield defers both trades entirely to Colorado DORA/state inspection programs rather than running its own trade-permit or trade-inspection process.. Local amendments apply — see the Springfield overview page for the full list.

      Not as a separate permit. No standalone demolition permit application, fee, or ordinance provision appears in the Town's Master Fee Schedule, Building Permit Application, or ordinance and resolution archives. Demolition work most likely falls under the Town's general Building Permit Application, but the Town does not state so — confirm with Town Hall before relying on it.

      Sources & verification

      Key facts verified against official sources. Last reviewed 2026-07-06.

      Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Springfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

      Springfield's permit history isn't searchable here yet

      This page covers what the permit requires. What we don't have for Springfield yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

      Your email, and the place — never an address. We only use it to tell you when Springfield lands. Privacy.