Skip to main content
PermitBase

Version history — Edgewater, Colorado

This is PermitBase’s own verified record for Edgewater, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Edgewater’s actual law was at that time.

Permanent link to today’s record

/colorado/jefferson-county/edgewater/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
    • Edgewater, Colorado — Residential Building Permit (New Construction) fee record added: Building Permit Fee — valuation $1,000.01 to $1,500.00 ($70.00)
  • 2026-08-20Superseded
  • 2026-08-13Superseded
    • Edgewater, Colorado — Sign Permit (Permanent and Temporary) record added
    • Edgewater, Colorado — Fire Sprinkler and Fire Alarm System Permit record added
    • Edgewater, Colorado — Change of Use / Change of Occupancy Permit record added
  • 2026-07-20Superseded
    • Edgewater, Colorado — EV Charger / EVSE Permit (Billed as General Electrical Work) record added
    • Edgewater, Colorado — Rooftop Solar / Photovoltaic Permit fee record added: Statewide aggregate fee cap on active solar energy system installs (CURRENTLY IN EFFECT, distinct from the City's own expired local cap above) ($500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284))
  • 2026-07-13Superseded
  • 2026-07-07Superseded
  • 2026-07-06Initial record — coverage of Edgewater began