Version history — Edgewater, Colorado
This is PermitBase’s own verified record for Edgewater, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Edgewater’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- Edgewater, Colorado — Residential Building Permit (New Construction) fee record added: Building Permit Fee — valuation $1,000.01 to $1,500.00 ($70.00)
- 2026-08-20Superseded
- 2026-08-13Superseded
- Edgewater, Colorado — Sign Permit (Permanent and Temporary) record added
- Edgewater, Colorado — Fire Sprinkler and Fire Alarm System Permit record added
- Edgewater, Colorado — Change of Use / Change of Occupancy Permit record added
- 2026-07-20Superseded
- Edgewater, Colorado — EV Charger / EVSE Permit (Billed as General Electrical Work) record added
- Edgewater, Colorado — Rooftop Solar / Photovoltaic Permit fee record added: Statewide aggregate fee cap on active solar energy system installs (CURRENTLY IN EFFECT, distinct from the City's own expired local cap above) ($500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284))
- 2026-07-13Superseded
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Edgewater began