Inspection sequence, scheduling, and re-inspection fees for building permits in Wheat Ridge, Colorado.

Verified 2026-07-05 · Source

How to schedule

Inspections are requested through the building department below.

Address
7500 W. 29th Ave., 2nd Floor, Wheat Ridge, CO 80033
Phone
303-235-2855 (Option 1: Building Permits & Contractor Licensing; Option 2: Inspections; Option 4: Plan Review); General City phone 303-234-5900
Office hours
Walk-in hours Monday-Friday, 9:00 a.m.-3:30 p.m.; service also available by appointment or phone/email starting at 7:30 a.m. Inspection request windows: AM inspections typically 8 a.m.-noon, PM typically noon-3 p.m., with a 2-hour window given on inspection day.

Published scheduling rules

  • Same-day inspections are available (11 a.m. cutoff, $170 fee); routine building inspections need only next-day notice (by 4 p.m.), but zoning/engineering inspections require up to a week's advance notice — plan trade-specific inspection requests accordingly. (General)

Inspection sequence

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Foundation

    Before concrete pour, for new ADU construction

  2. 2

    Framing

    Framing complete; fire separation/fire-rated wall verified for attached ADUs where required

  3. 3

    Rough Electrical/Plumbing/Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete, fire-access/sprinkler and occupancy compliance confirmed

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation (if new footings)

    Before concrete pour, for new footings/foundations

  2. 2

    Framing

    Framing and connection to existing structure before cover

  3. 3

    Rough Electrical/Plumbing/Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans

Applies to: Residential Building Permit (New Construction)

  1. 1

    Footing/Foundation

    Before concrete pour

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical/Plumbing/Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans and applicable code

Applies to: Electric Vehicle Charger Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before cover

  2. 2

    Final Inspection

    Charging equipment installed and energized, circuit/receptacle verified per NEC

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel installed, before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized and verified

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork and equipment installed before concealment

  2. 2

    Final Inspection

    Equipment operational; combustion air and venting verified

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe installation before concealment

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

Applies to: Solar PV Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before cover

  2. 2

    Final Inspection

    Racking, roof penetrations, and electrical connections verified

Re-inspection fees

Electrical PermitRe-inspection Fee
$85/hour, minimum 1 hour (City's Permit Valuation & Fees page); a separate $60 late-cancellation re-inspection fee is cited on the City's FAQ/Inspections page for day-of cancellations after 8 a.m.
Roofing Permit (Reroof)Re-inspection Fee
$85/hour, minimum 1 hour

Sources & verification

Verified against official sources. Last reviewed 2026-07-05.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wheat Ridge building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Wheat Ridge building permits

Get alerts for Wheat Ridge

We'll email you when Wheat Ridge's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.