Electric Vehicle Charger Permit in Wheat Ridge, Colorado

Required for installation of electric vehicle charging equipment in Wheat Ridge. Residential EV charging is billed at a flat rate (including plan check) distinct from the general valuation-based Fee Schedule; commercial EV charging is billed on the standard valuation-based table.

Verified 2026-07-20 · Source

When you need this permit

  • EV charger installation requires a permit application through the City's OpenGov portal (or Form Center for legacy trade-specific forms)
  • Residential Electric Vehicle Charging permit fee includes plan check as part of the flat rate
  • Commercial Electric Vehicle Charging is billed on the standard valuation-based Building Permit Fee Schedule rather than a flat rate
  • As of January 1, 2026, all new permit applications, including EV charger installs, must comply with the 2024 I-Codes and current NEC edition adopted by the Colorado State Electrical Board
  • A licensed electrical contractor registered with the City (State of Colorado Master Electrician / Electrical Contractor license) must be signed onto the permit Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electric Vehicle Charging — Residential (flat rate, includes plan check)City of Wheat Ridge Permit Valuation & Fees page, 2026 Budget flat-rate trade permit list — verified directly against the page's raw fee table
$170
Electric Vehicle Charging — CommercialCity of Wheat Ridge Permit Valuation & Fees page — billed on the standard valuation-based Building Permit Fee Schedule rather than a flat rate
Based on valuation

Review timeline

Plan review
Not published — contact the department

How long did your Electric Vehicle Charger Permit permit actually take in Wheat Ridge?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before cover

  2. 2

    Final Inspection

    Charging equipment installed and energized, circuit/receptacle verified per NEC

See the full Wheat Ridge inspection guide — scheduling & re-inspection fees →

Tips

  • Residential EV charger installs in Wheat Ridge are a clean, published flat fee of $170 that already includes plan check — no separate plan review line to budget for, unlike most other permit types.
  • Commercial EV charger installs do NOT get the flat rate — they're billed on the standard valuation-based fee schedule, so budget accordingly for larger commercial charging installations.

Frequently asked questions

Wheat Ridge requires an electric vehicle charger permit for: EV charger installation requires a permit application through the City's OpenGov portal (or Form Center for legacy trade-specific forms); Residential Electric Vehicle Charging permit fee includes plan check as part of the flat rate; Commercial Electric Vehicle Charging is billed on the standard valuation-based Building Permit Fee Schedule rather than a flat rate; As of January 1, 2026, all new permit applications, including EV charger installs, must comply with the 2024 I-Codes and current NEC edition adopted by the Colorado State Electrical Board; A licensed electrical contractor registered with the City (State of Colorado Master Electrician / Electrical Contractor license) must be signed onto the permit. If your project isn't listed, confirm with City of Wheat Ridge Building Division (Community Development Department) at 303-235-2855 (Option 1: Building Permits & Contractor Licensing; Option 2: Inspections; Option 4: Plan Review); General City phone 303-234-5900 before starting work.

A flat $170, which includes plan check, per the City of Wheat Ridge's Permit Valuation & Fees page.

Wheat Ridge does not publish a plan-review timeline for this permit. Contact City of Wheat Ridge Building Division (Community Development Department) at 303-235-2855 (Option 1: Building Permits & Contractor Licensing; Option 2: Inspections; Option 4: Plan Review); General City phone 303-234-5900 for current turnaround.

You'll need: Electric Vehicle Charging Permit Application (OpenGov Portal); Electrical Load Calculations / One-Line Diagram. See the required-documents checklist on this page for details on each.

Wheat Ridge requires 2 inspection(s) for an electric vehicle charger permit, in order: Rough Electrical, Final Inspection. Schedule each through City of Wheat Ridge Building Division (Community Development Department) (303-235-2855 (Option 1: Building Permits & Contractor Licensing; Option 2: Inspections; Option 4: Plan Review); General City phone 303-234-5900).

Apply through City of Wheat Ridge Building Division (Community Development Department) at 7500 W. 29th Ave., 2nd Floor, Wheat Ridge, CO 80033. Phone: 303-235-2855 (Option 1: Building Permits & Contractor Licensing; Option 2: Inspections; Option 4: Plan Review); General City phone 303-234-5900, email: buildingpermits@ci.wheatridge.co.us (Permits); planreview@ci.wheatridge.co.us (Plan Review); buildinginspections@ci.wheatridge.co.us (Inspections); contractorlicensing@ci.wheatridge.co.us (Contractor Licensing). Office hours: Walk-in hours Monday-Friday, 9:00 a.m.-3:30 p.m.; service also available by appointment or phone/email starting at 7:30 a.m. Inspection request windows: AM inspections typically 8 a.m.-noon, PM typically noon-3 p.m., with a 2-hour window given on inspection day.. Official information: https://www.ci.wheatridge.co.us/278/Building-Division.

Wheat Ridge, Colorado has adopted: As of January 1, 2026: 2024 International Building Code (IBC), excluding Chapter 1 — City of Wheat Ridge Adopted Codes & Amendments page; 2024 International Residential Code (IRC), excluding Chapter 1, including local Appendices BB, BE, BF, BO, CA, CB, CC, CE, CF, CH; 2024 International Fuel Gas Code (IFGC), excluding Chapter 1, retaining Section 102; 2024 International Mechanical Code (IMC), excluding Chapter 1, retaining Section 102; 2024 International Plumbing Code (IPC), excluding Chapters 1 and 14, retaining Section 102; 2024 International Energy Conservation Code (IECC), excluding Chapter 1, retaining specified sections; 2024 International Existing Building Code (IEBC), excluding Chapter 1; 2024 International Swimming Pool and Spa Code (ISPSC), excluding Chapter 1, retaining Sections 102 and 111; 2024 International Private Sewage Disposal Code (IPSDC), excluding Chapter 1; International Property Maintenance Code (IPMC), excluding Chapter 1, retaining Section 102; 2024 International Fire Code (IFC), excluding Chapter 1, retaining Section 105, adopting Appendices B, C, D, F, H, O; National Electrical Code — latest edition adopted by the Colorado State Electrical Board (2023 NEC as of this review); ICC/ANSI A117.1 — Accessible and Usable Buildings and Facilities; Colorado Model Electric Ready and Solar Ready Code; Colorado Model Low Energy and Carbon Code, excluding Chapter 1, retaining specified sections; Adopted by Ordinance 1883; local amendments consolidated in Chapter 5 of the Wheat Ridge Municipal Code, which reorganizes permit/enforcement/appeals administrative provisions into a single article. Source: City of Wheat Ridge Adopted Codes & Amendments page, https://www.ci.wheatridge.co.us/280/Adopted-Codes-Amendments; TRANSITION PERIOD: through December 31, 2025, permit applicants may elect to use either the prior 2018 International Codes (adopted by City Council January 13, 2020, effective July 1, 2020) or the new 2024 codes; all new permit applications submitted on or after January 1, 2026 must comply with the 2024 I-Codes. Source: Adopted Codes & Amendments page; Forward-looking provision: beginning January 1, 2027, residential fire sprinklers will be required for new townhomes; single-unit detached homes and duplexes remain exempt. Source: Adopted Codes & Amendments page. Local amendments apply — see the Wheat Ridge overview page for the full list.

No. Commercial Electric Vehicle Charging permits are billed on the standard valuation-based Building Permit Fee Schedule, while residential EV charging has its own flat $170 rate that includes plan check.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wheat Ridge building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.