This is PermitBase’s published record for Burlington as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Burlington building permits
Burlington, Colorado — as published 2026-07-06.
Reviewed 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Addition)
VerifiedRequired for new construction or additions to residential (and other) structures within Burlington city limits. Issued through City Hall on a single combined 'Building Permit Application / Zoning Compliance Application' form. Because Burlington has not adopted a local building code, the applicant is contractually bound (via the permit application itself) to follow applicable State of Colorado building-code guidance and any Colorado Department of Local Affairs/Division of Housing requirements rather than a codified local building code.
Verified 2026-07-06 · Source
Requirements
- Complete Part A (New Building, Addition, Garage, Fence, or Other) and Part C (Utility Taps) of the combined Building Permit/Zoning Compliance Application
- Attach a scale drawing of the tract and the building to be built, repaired, or altered, with utilities and sidewalks and all dimensions clearly indicated
- Attach a Title 17.12.030(B)-compliant zoning plat: scaled drawing showing exact lot shape/dimensions, exact size/location of existing and proposed buildings/structures and driveways, present and proposed use of the property, and location of all utility/service connections and drainage courses, plus relevant conditions within 15 feet of the lot perimeter
- Complete and return a separate Building Permit Locate Form: call 811 or 800-922-1987 for a utility line locate before construction begins (approximately 3-day turnaround, ticket valid 30 days, no charge unless lines must be moved); certify the structure is not built over a gas line or any utility line
- Sign the applicant certification acknowledging Burlington has not adopted a building code and that state building-code guidelines, local requirements, and DOLA/Division of Housing inspection requirements govern
- Employ only duly licensed plumbers and electricians for any plumbing/electrical work (Colorado state licensure, per State Plumbing Board/State Electrical Board)
- Disclose where construction materials will be purchased and pay the 2% city use tax on any materials purchased outside the city (Burlington Municipal Code Chapter 3.08), either by estimate at permit issuance or via affidavit if purchasing from an in-city licensed retailer
Required documents
- RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Combined form covering new construction, additions, garages, fences, change-of-use/annexation, and utility taps; available at burlingtoncolo.com/DocumentCenter/View/187
- RequiredBuilding Permit Locate FormUtility line-locate certification (811/800-922-1987), returned to City Hall with the Building Permit Application
- RequiredScaled Site Plat (Title 17.12.030(B))Scaled drawing of lot, buildings, driveways, utility connections, and drainage, attached to the Zoning Compliance Certificate
- OptionalSales Tax Computation FormIncluded with the application; used to compute the 2% city use tax on materials purchased outside city limits
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1 to $500 | $25 | — |
| Building Permit Fee — valuation $501 to $2,000 | $25 for the first $500 plus $3.00 for each additional $100, or fraction thereof, to and including $2,000 | — |
| Building Permit Fee — valuation $2,001 to $40,000 | $70 for the first $2,000 plus $10.00 for each additional $1,000, or fraction thereof, to and including $40,000 | — |
| Building Permit Fee — valuation $40,001 to $100,000 | $450 for the first $40,000 plus $8.00 for each additional $1,000, or fraction thereof, to and including $100,000 | — |
| Building Permit Fee — valuation $100,000 to $500,000 | $930 for the first $100,000 plus $6.00 for each additional $1,000, or fraction thereof, to and including $500,000 | — |
| Building Permit Fee — valuation $500,000 to $1,000,000 | $1,170 for the first $500,000 plus $5.00 for each additional $1,000, or fraction thereof, to and including $1,000,000 | — |
| Building Permit Fee — valuation $1,000,000 to $5,000,000 | $3,670 for the first $1,000,000 plus $3.00 for each additional $1,000, or fraction thereof, to and including $5,000,000 | — |
| Building Permit Fee — valuation $5,000,000 and up | $15,670 for the first $5,000,000 plus $1.00 for each additional $1,000, or fraction thereof | — |
| Construction/Building Materials Use Tax | 2% of the deemed sale value of construction/building materials (50% of current replacement cost of the project) if materials are purchased outside city limits | Burlington Municipal Code 3.08.080; may instead be handled via affidavit if all materials are purchased from a licensed retailer within the city |
| Administrative Fee | Amount not published; a line item exists on the permit form ('Administrative Fee') but no schedule or amount is disclosed anywhere in available City materials | Confirm exact amount directly with City Hall (719-346-8652) at time of application |
Residential Addition / Remodel Permit
VerifiedAdditions are covered by the same combined Building Permit/Zoning Compliance Application as new construction (Part A, 'Addition' checkbox). Interior remodels that do not change the building footprint, use, or zoning compliance still require checking with City Hall, per the Building Permits page's instruction to 'check with City Hall staff prior to any construction, remodeling, or other changes.'
Verified 2026-07-06 · Source
Requirements
- Complete Part A of the Building Permit/Zoning Compliance Application, selecting 'Addition' (or 'Other' for remodel scope) and describing the work
- Attach a scale drawing/site plat per Title 17.12.030(B) if the project affects the building footprint or site layout
- Complete the Building Permit Locate Form if any excavation or ground-disturbing work is involved
- Contact City Hall before starting any remodeling work to confirm whether a permit is required for the specific scope — the City's own guidance states some changes 'may require a building permit' and staff will advise per-project
Required documents
- RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Same combined form used for new construction, with 'Addition' or 'Other' selected in Part A
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule as new construction) | $25 minimum, scaling per the tiered valuation schedule | Per the Building Permit Application fee table |
| Construction/Building Materials Use Tax | 2% of deemed sale value if materials purchased outside city limits | Burlington Municipal Code 3.08.080 |
Electrical Permit
Burlington's own Building Permit Application does not describe a City-run electrical permit or inspection process (it only requires that electrical work be performed by a duly licensed electrician). Kit Carson County is not among the 16 Colorado counties confirmed by DORA's Division of Professions and Occupations to have their own state-exempt local electrical inspection program. Combined with CRS 12-115-120's default-to-state-inspection rule for jurisdictions without their own certified program, electrical permitting/inspection in Burlington is assessed as defaulting to the Colorado State Electrical Board (DORA).
Reviewed 2026-07-06 · Source
Requirements
- Electrical work must be performed by a duly licensed Colorado electrician (per the City's Building Permit Application certification requirement)
- Absent a City-run electrical inspection program, apply for a Colorado State Electrical Permit through the DORA Division of Professions and Occupations online permitting system prior to installing electrical wiring
- State Electrical Permits are valid for one year from the date of issuance
Required documents
- RequiredColorado State Electrical Permit (DORA)Applied for online via the DPO Online Permitting System
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State Electrical Permit Fee | Set by the Colorado State Electrical Board fee schedule (DORA), not the City of Burlington | Confirm current state fee schedule at dpo.colorado.gov/Electrical; not itemized in any Burlington city document |
Plumbing Permit
As with electrical work, Burlington's own Building Permit Application requires plumbing work be performed by a duly licensed plumber but describes no separate City-run plumbing permit or inspection process. The same jurisdictional analysis as the electrical permit applies: absent evidence of a City-run program, plumbing permitting/inspection is assessed as defaulting to the Colorado State Plumbing Board (DORA).
Reviewed 2026-07-06 · Source
Requirements
- Plumbing work must be performed by a duly licensed Colorado plumber (per the City's Building Permit Application certification requirement)
- Absent a City-run plumbing inspection program, apply for a Colorado State Plumbing Permit through the DORA Division of Professions and Occupations online permitting system prior to installing plumbing
- State Plumbing Permits are valid for one year from the date of issuance
Required documents
- RequiredColorado State Plumbing Permit (DORA)Applied for online via the DPO Online Permitting System
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State Plumbing Permit Fee | Set by the Colorado State Plumbing Board fee schedule (DORA), not the City of Burlington | Confirm current state fee schedule at dpo.colorado.gov; not itemized in any Burlington city document |
Mechanical / HVAC Permit
VerifiedMechanical/HVAC work (furnace, ductwork, ventilation) in Burlington is covered under the general combined Building Permit/Zoning Compliance Application ('Other' scope in Part A) rather than a standalone mechanical permit form; no separate City mechanical code or inspection process is published.
Verified 2026-07-06 · Source
Requirements
- Complete the combined Building Permit/Zoning Compliance Application, describing the mechanical scope of work under Part A ('Other')
- Because no local building code (and therefore no locally adopted IMC/IFGC edition) exists, applicants should confirm with City Hall what state guidance applies to the specific mechanical installation
Required documents
- RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Same combined form used for all other permit types
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule) | $25 minimum, scaling per the tiered valuation schedule | No separate mechanical-specific fee schedule is published; billed under the general Building Permit Fee table |
Re-Roof Permit
VerifiedRe-roofing is covered under the general Building Permit/Zoning Compliance Application ('Other' scope) rather than a distinct re-roof permit type; no re-roof-specific fee, document set, or timeline is separately published by the City.
Verified 2026-07-06 · Source
Requirements
- Contact City Hall to confirm whether a re-roof project requires a permit for the specific scope of work
- Complete the combined Building Permit/Zoning Compliance Application if a permit is required
Required documents
- RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Same combined form used for all other permit types
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule) | $25 minimum, scaling per the tiered valuation schedule | No separate re-roof fee is published |
Rooftop Solar PV Permit
No solar-specific permit type, expedited track, or fee schedule is published by the City of Burlington. A rooftop solar PV installation would be processed under the general combined Building Permit/Zoning Compliance Application, with the electrical portion of the work assessed to fall under the Colorado State Electrical Board permit system per this file's electrical-permit analysis.
Reviewed 2026-07-06 · Source
Requirements
- Complete the combined Building Permit/Zoning Compliance Application for the structural/roof-mounting portion of the installation
- Obtain a Colorado State Electrical Permit (DORA) for the electrical/interconnection portion of the installation, consistent with this file's assessment that Burlington defaults to state electrical permitting
- Electrical work must be performed by a duly licensed Colorado electrician
Required documents
- RequiredBuilding Permit Application / Zoning Compliance Application (PDF)For the structural/mounting scope of the installation
- RequiredColorado State Electrical Permit (DORA)For the electrical/interconnection scope of the installation
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule) | $25 minimum, scaling per the tiered valuation schedule | No solar-specific fee is published by the City |
| State Electrical Permit Fee | Set by the Colorado State Electrical Board fee schedule (DORA) | Not itemized in any Burlington city document |
Accessory Dwelling Unit (ADU) Permit
No distinct ADU ordinance, permit type, or zoning provision was located for Burlington, Colorado during this research (search results for Burlington ADU rules returned only Burlington, Washington and Burlington, Vermont municipal materials, not Burlington, CO). An ADU project in Burlington would be processed under the general 'New Building'/'Addition' permit type on the combined Building Permit/Zoning Compliance Application, subject to whatever zoning-district rules apply under Burlington Municipal Code Title 17 (not independently verified section-by-section in this research pass).
Reviewed 2026-07-06 · Source
Requirements
- Complete the combined Building Permit/Zoning Compliance Application (Part A: New Building or Addition, as applicable)
- Confirm zoning-district eligibility for a detached or attached accessory structure/dwelling with City Hall before applying, since no published ADU-specific ordinance was located
- Attach the Title 17.12.030(B) scaled site plat showing the proposed structure's location relative to the principal dwelling and lot lines
Required documents
- RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Same combined form used for all other permit types
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule) | $25 minimum, scaling per the tiered valuation schedule | No ADU-specific fee is published |
Demolition Permit
Demolition is one of the enumerated project types on the general Building Permit/Zoning Compliance Application intake (the City's Ordinances & Resolutions page also lists Ordinance No. 990, addressing abatement of dangerous buildings, indicating a distinct dangerous-building-abatement process may run alongside voluntary demolition permitting, though the ordinance's full text was not extractable from the Municode JavaScript-rendered library during this research).
Reviewed 2026-07-06 · Source
Requirements
- Complete the combined Building Permit/Zoning Compliance Application, describing the demolition scope under Part A
- Coordinate utility disconnection and the Building Permit Locate Form (811/800-922-1987) before demolition begins, consistent with the general new-construction requirements
- Where a structure is subject to a dangerous-building abatement action (Burlington Municipal Code, per Ordinance No. 990 and related provisions), a separate abatement process administered by the City may apply instead of or in addition to a standard voluntary demolition permit — not independently verified in full text during this research
Required documents
- RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Same combined form used for all other permit types
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule) | $25 minimum, scaling per the tiered valuation schedule | No separate demolition-specific fee is published |
Commercial Tenant Improvement / Change of Use Permit
VerifiedCommercial tenant improvements and changes of use are processed under Part B ('Change of Use') of the combined Building Permit/Zoning Compliance Application, which separately captures present use, proposed use, current zoning, and any annexation/petition status, alongside Part A for any physical construction scope.
Verified 2026-07-06 · Source
Requirements
- Complete Part B of the combined application: present use, proposed use, current zone, and annexation/petition status if applicable
- Complete Part A if the tenant improvement includes physical construction, addition, or alteration work
- Confirm zoning compliance for the proposed use with City Hall before applying
Required documents
- RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Part B covers Change of Use specifically
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule, if construction work is involved) | $25 minimum, scaling per the tiered valuation schedule | No separate change-of-use or commercial-TI-specific fee is published; a Change of Use with no construction scope may not trigger the valuation-based fee at all — confirm with City Hall |
Deck / Covered Patio Permit
VerifiedDecks and covered patios are processed under the general 'Addition' or 'Other' scope on the combined Building Permit/Zoning Compliance Application; no deck-specific fee, document set, or exemption threshold is separately published by the City.
Verified 2026-07-06 · Source
Requirements
- Complete the combined Building Permit/Zoning Compliance Application, describing the deck/patio scope, front/side/rear yard setbacks, and maximum height in Part A
- Attach the Title 17.12.030(B) scaled site plat showing the deck/patio's location relative to lot lines and the principal structure
Required documents
- RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Includes explicit fields for front/side/rear yard setback and maximum height, directly applicable to deck/patio projects
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule) | $25 minimum, scaling per the tiered valuation schedule | No deck-specific fee or exemption is published |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Burlington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.