This is PermitBase’s published record for Burlington as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Burlington building permits

Burlington, Colorado — as published 2026-07-07.

Reviewed 2026-07-13 · Source

Codes adopted

NONE LOCALLY ADOPTED — verified directly from the City's own Building Permit Application form (DocumentCenter/View/187), which the applicant must sign: 'I hereby agree and understand that City of Burlington has not adopted a building code and it is my responsibility to follow all state guidelines regarding state building codes, local building codes and all inspections the State of Colorado, City of Burlington and the Colorado Department of Local Affairs and Housing may require.'The City's own Building Codes webpage (burlingtoncolo.com/96/Building-Codes) independently corroborates this: it states the City 'requires all buildings to meet the compliance standards of the State of Colorado's building codes' and links to the Colorado Office of the State Architect (OSA) building-codes page (osa.colorado.gov/state-buildings/building-codes) — but that OSA page was checked directly and its adopted-code list applies ONLY to state-owned/state-lease-purchased construction and specific state-assisted categories (K-12 schools, health facilities), NOT to private construction in municipalities. Burlington's own reference to it therefore does not establish any specific IBC/IRC/IECC/NEC edition as locally adopted or locally enforced for private building permits — it is effectively a pointer to a source that does not govern ordinary residential/commercial permits in Burlington.Net effect: Burlington has NO locally adopted model code edition (no IBC, IRC, IMC, IPC, IFGC, IECC, IFC, IEBC, or NEC edition/year is specified anywhere in the City's own building-permit materials). Applicants are directed to follow 'state guidelines' generally and Colorado Department of Local Affairs (DOLA)/Division of Housing requirements where applicable, rather than a codified local building code. This is a genuinely verified absence, not an omission — confirmed by the primary-source application form language plus the City's own Building Codes page, and consistent with Burlington's Municode-hosted Code of Ordinances not surfacing any building-code-adoption ordinance in available search results (Municode's Burlington library page is a JavaScript-rendered single-page app that could not be crawled for full-text search during this research; the City's own Ordinances & Resolutions page listing recent ordinance numbers did not show a building-code-adoption ordinance among currently listed items).

Permit types & fees

Residential Building Permit (New Construction / Addition)

Verified

Required for new construction or additions to residential (and other) structures within Burlington city limits. Issued through City Hall on a single combined 'Building Permit Application / Zoning Compliance Application' form. Because Burlington has not adopted a local building code, the applicant is contractually bound (via the permit application itself) to follow applicable State of Colorado building-code guidance and any Colorado Department of Local Affairs/Division of Housing requirements rather than a codified local building code.

Verified 2026-07-06 · Source

Requirements

  • Complete Part A (New Building, Addition, Garage, Fence, or Other) and Part C (Utility Taps) of the combined Building Permit/Zoning Compliance Application
  • Attach a scale drawing of the tract and the building to be built, repaired, or altered, with utilities and sidewalks and all dimensions clearly indicated
  • Attach a Title 17.12.030(B)-compliant zoning plat: scaled drawing showing exact lot shape/dimensions, exact size/location of existing and proposed buildings/structures and driveways, present and proposed use of the property, and location of all utility/service connections and drainage courses, plus relevant conditions within 15 feet of the lot perimeter
  • Complete and return a separate Building Permit Locate Form: call 811 or 800-922-1987 for a utility line locate before construction begins (approximately 3-day turnaround, ticket valid 30 days, no charge unless lines must be moved); certify the structure is not built over a gas line or any utility line
  • Sign the applicant certification acknowledging Burlington has not adopted a building code and that state building-code guidelines, local requirements, and DOLA/Division of Housing inspection requirements govern
  • Employ only duly licensed plumbers and electricians for any plumbing/electrical work (Colorado state licensure, per State Plumbing Board/State Electrical Board)
  • Disclose where construction materials will be purchased and pay the 2% city use tax on any materials purchased outside the city (Burlington Municipal Code Chapter 3.08), either by estimate at permit issuance or via affidavit if purchasing from an in-city licensed retailer

Required documents

  • RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Combined form covering new construction, additions, garages, fences, change-of-use/annexation, and utility taps; available at burlingtoncolo.com/DocumentCenter/View/187
  • RequiredBuilding Permit Locate FormUtility line-locate certification (811/800-922-1987), returned to City Hall with the Building Permit Application
  • RequiredScaled Site Plat (Title 17.12.030(B))Scaled drawing of lot, buildings, driveways, utility connections, and drainage, attached to the Zoning Compliance Certificate
  • OptionalSales Tax Computation FormIncluded with the application; used to compute the 2% city use tax on materials purchased outside city limits

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1 to $500$25
Building Permit Fee — valuation $501 to $2,000$25 for the first $500 plus $3.00 for each additional $100, or fraction thereof, to and including $2,000
Building Permit Fee — valuation $2,001 to $40,000$70 for the first $2,000 plus $10.00 for each additional $1,000, or fraction thereof, to and including $40,000
Building Permit Fee — valuation $40,001 to $100,000$450 for the first $40,000 plus $8.00 for each additional $1,000, or fraction thereof, to and including $100,000
Building Permit Fee — valuation $100,000 to $500,000$930 for the first $100,000 plus $6.00 for each additional $1,000, or fraction thereof, to and including $500,000
Building Permit Fee — valuation $500,000 to $1,000,000$1,170 for the first $500,000 plus $5.00 for each additional $1,000, or fraction thereof, to and including $1,000,000
Building Permit Fee — valuation $1,000,000 to $5,000,000$3,670 for the first $1,000,000 plus $3.00 for each additional $1,000, or fraction thereof, to and including $5,000,000
Building Permit Fee — valuation $5,000,000 and up$15,670 for the first $5,000,000 plus $1.00 for each additional $1,000, or fraction thereof
Construction/Building Materials Use Tax2% of the deemed sale value of construction/building materials (50% of current replacement cost of the project) if materials are purchased outside city limitsBurlington Municipal Code 3.08.080; may instead be handled via affidavit if all materials are purchased from a licensed retailer within the city
Administrative FeeAmount not published; a line item exists on the permit form ('Administrative Fee') but no schedule or amount is disclosed anywhere in available City materialsConfirm exact amount directly with City Hall (719-346-8652) at time of application

Residential Addition / Remodel Permit

Verified

Additions are covered by the same combined Building Permit/Zoning Compliance Application as new construction (Part A, 'Addition' checkbox). Interior remodels that do not change the building footprint, use, or zoning compliance still require checking with City Hall, per the Building Permits page's instruction to 'check with City Hall staff prior to any construction, remodeling, or other changes.'

Verified 2026-07-06 · Source

Requirements

  • Complete Part A of the Building Permit/Zoning Compliance Application, selecting 'Addition' (or 'Other' for remodel scope) and describing the work
  • Attach a scale drawing/site plat per Title 17.12.030(B) if the project affects the building footprint or site layout
  • Complete the Building Permit Locate Form if any excavation or ground-disturbing work is involved
  • Contact City Hall before starting any remodeling work to confirm whether a permit is required for the specific scope — the City's own guidance states some changes 'may require a building permit' and staff will advise per-project

Required documents

  • RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Same combined form used for new construction, with 'Addition' or 'Other' selected in Part A

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule as new construction)$25 minimum, scaling per the tiered valuation schedulePer the Building Permit Application fee table
Construction/Building Materials Use Tax2% of deemed sale value if materials purchased outside city limitsBurlington Municipal Code 3.08.080

Electrical Permit

Verified

Burlington's own Building Permit Application does not describe a City-run electrical permit or inspection process (it only requires that electrical work be performed by a duly licensed electrician). Directly confirmed 2026-07-13 via DORA's own current, publicly accessible jurisdiction page (dpo.colorado.gov/ElectricalPlumbingPermits, HTTP 200): Kit Carson County is NOT among the Colorado counties listed as having their own local Electrical Inspection Program (the page states 'The State does not inspect in local jurisdictions having its own Electrical Inspection Program... If the county where your job site is located is listed below, do not continue with the permit application process' and lists Adams, Arapahoe, Boulder, Broomfield, Chaffee, City of Pueblo/Town of Boone, Delta (City of Delta only), Denver, Douglas, Eagle, El Paso, Jefferson, Larimer, Mesa, Pitkin, Pueblo, San Miguel, Summit, Teller, and Weld — Kit Carson is absent). Combined with CRS 12-115-120's default-to-state-inspection rule for jurisdictions without their own certified program, electrical permitting/inspection in Burlington is confirmed to default to the Colorado State Electrical Board (DORA).

Verified 2026-07-13 · Source

Requirements

  • Electrical work must be performed by a duly licensed Colorado electrician (per the City's Building Permit Application certification requirement)
  • Absent a City-run electrical inspection program, apply for a Colorado State Electrical Permit through the DORA Division of Professions and Occupations online permitting system prior to installing electrical wiring
  • State Electrical Permits are valid for one year from the date of issuance

Required documents

  • RequiredColorado State Electrical Permit (DORA)Applied for online via the DPO Online Permitting System

Fee schedule

Fee typeAmountNotes
State Electrical Permit FeeSet by the Colorado State Electrical Board fee schedule (DORA), not the City of BurlingtonConfirm current state fee schedule at dpo.colorado.gov/Electrical; not itemized in any Burlington city document

Plumbing Permit

Verified

As with electrical work, Burlington's own Building Permit Application requires plumbing work be performed by a duly licensed plumber but describes no separate City-run plumbing permit or inspection process. Directly confirmed 2026-07-13 via DORA's own current, publicly accessible jurisdiction page (dpo.colorado.gov/ElectricalPlumbingPermits, HTTP 200): Kit Carson County is NOT among the counties listed as having their own local Plumbing Inspection Program (the page states 'The State does not inspect in local jurisdictions having its own Plumbing Inspection Program' and lists Adams, Arapahoe, Boulder, Broomfield, Chaffee, City of Pueblo/Town of Boone, Clear Creek, Denver, Douglas, Eagle, El Paso, Elbert, Garfield, Gilpin, Grand, Jackson, Jefferson, La Plata, Lake, Larimer, Mesa, Moffat, Pitkin, Prowers, Pueblo, Routt, Summit, Teller, and Weld — Kit Carson is absent). This is corroborated by 3 CCR 720-1 (State Plumbing Board Rules), Rule 7.1.1, which confirms permits/inspections run 'either through the Board or the Local Authority Having Jurisdiction' — Kit Carson County having no such local authority per the above list, plumbing permitting/inspection in Burlington is confirmed to default to the Colorado State Plumbing Board (DORA).

Verified 2026-07-13 · Source

Requirements

  • Plumbing work must be performed by a duly licensed Colorado plumber (per the City's Building Permit Application certification requirement)
  • Absent a City-run plumbing inspection program, apply for a Colorado State Plumbing Permit through the DORA Division of Professions and Occupations online permitting system prior to installing plumbing
  • State Plumbing Permits are valid for one year from the date of issuance

Required documents

  • RequiredColorado State Plumbing Permit (DORA)Applied for online via the DPO Online Permitting System

Fee schedule

Fee typeAmountNotes
State Plumbing Permit FeeSet by the Colorado State Plumbing Board fee schedule (DORA), not the City of BurlingtonConfirm current state fee schedule at dpo.colorado.gov; not itemized in any Burlington city document

Mechanical / HVAC Permit

Verified

Mechanical/HVAC work (furnace, ductwork, ventilation) in Burlington is covered under the general combined Building Permit/Zoning Compliance Application ('Other' scope in Part A) rather than a standalone mechanical permit form; no separate City mechanical code or inspection process is published.

Verified 2026-07-06 · Source

Requirements

  • Complete the combined Building Permit/Zoning Compliance Application, describing the mechanical scope of work under Part A ('Other')
  • Because no local building code (and therefore no locally adopted IMC/IFGC edition) exists, applicants should confirm with City Hall what state guidance applies to the specific mechanical installation

Required documents

  • RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Same combined form used for all other permit types

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule)$25 minimum, scaling per the tiered valuation scheduleNo separate mechanical-specific fee schedule is published; billed under the general Building Permit Fee table

Re-Roof Permit

Verified

Re-roofing is covered under the general Building Permit/Zoning Compliance Application ('Other' scope) rather than a distinct re-roof permit type; no re-roof-specific fee, document set, or timeline is separately published by the City.

Verified 2026-07-06 · Source

Requirements

  • Contact City Hall to confirm whether a re-roof project requires a permit for the specific scope of work
  • Complete the combined Building Permit/Zoning Compliance Application if a permit is required

Required documents

  • RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Same combined form used for all other permit types

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule)$25 minimum, scaling per the tiered valuation scheduleNo separate re-roof fee is published

Rooftop Solar PV Permit

Verified

No solar-specific permit type, expedited track, or fee schedule is published by the City of Burlington (re-confirmed 2026-07-13; no such program has appeared on the City's site or in DOLA/DORA materials). A rooftop solar PV installation would be processed under the general combined Building Permit/Zoning Compliance Application, with the electrical portion of the work falling under the Colorado State Electrical Board permit system — this is now a directly-confirmed determination (see this file's electrical-permit entry, upgraded to verified 2026-07-13 via DORA's own current jurisdiction page at dpo.colorado.gov/ElectricalPlumbingPermits showing Kit Carson County absent from the counties with their own local Electrical Inspection Program), not merely an inference.

Verified 2026-07-13 · Source

Requirements

  • Complete the combined Building Permit/Zoning Compliance Application for the structural/roof-mounting portion of the installation
  • Obtain a Colorado State Electrical Permit (DORA) for the electrical/interconnection portion of the installation, consistent with this file's assessment that Burlington defaults to state electrical permitting
  • Electrical work must be performed by a duly licensed Colorado electrician

Required documents

  • RequiredBuilding Permit Application / Zoning Compliance Application (PDF)For the structural/mounting scope of the installation
  • RequiredColorado State Electrical Permit (DORA)For the electrical/interconnection scope of the installation

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule)$25 minimum, scaling per the tiered valuation scheduleNo solar-specific fee is published by the City
State Electrical Permit FeeSet by the Colorado State Electrical Board fee schedule (DORA)Not itemized in any Burlington city document

Accessory Dwelling Unit (ADU) Permit

No distinct ADU ordinance, permit type, or zoning provision was located for Burlington, Colorado during this research (search results for Burlington ADU rules returned only Burlington, Washington and Burlington, Vermont municipal materials, not Burlington, CO). An ADU project in Burlington would be processed under the general 'New Building'/'Addition' permit type on the combined Building Permit/Zoning Compliance Application, subject to whatever zoning-district rules apply under Burlington Municipal Code Title 17 (not independently verified section-by-section — Burlington's Municode library remains a JavaScript-only single-page application that returns only a ~6KB Angular app shell to both WebFetch and curl-with-full-browser-headers, re-confirmed 2026-07-13). NEW FINDING (2026-07-13): Burlington is confirmed NOT a 'Subject Jurisdiction' under Colorado's statewide ADU mandate, HB24-1152 (C.R.S. 29-35-402 through 405). DOLA's own current, publicly accessible page (dlg.colorado.gov/accessory-dwelling-units) defines Subject Jurisdictions as Colorado home-rule/statutory/territorial-charter cities and towns that are within a federally designated Metropolitan Planning Organization (MPO) AND have a population of 1,000 or more, plus certain large-county census-designated places within an MPO — and publishes the full, explicit list of every Subject Jurisdiction (over 60 named municipalities plus unincorporated Highlands Ranch). Burlington does not appear on that list, consistent with Kit Carson County/the Eastern Plains falling outside any Colorado MPO boundary. This means Burlington is under no state-law obligation to allow ADUs by-right; whether Burlington's own Title 17 zoning code permits, conditions, or prohibits ADUs remains genuinely unverified and is the file's one remaining open gap for this permit type.

Reviewed 2026-07-13 · Source

Requirements

  • Complete the combined Building Permit/Zoning Compliance Application (Part A: New Building or Addition, as applicable)
  • Confirm zoning-district eligibility for a detached or attached accessory structure/dwelling with City Hall before applying, since no published ADU-specific ordinance was located
  • Attach the Title 17.12.030(B) scaled site plat showing the proposed structure's location relative to the principal dwelling and lot lines

Required documents

  • RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Same combined form used for all other permit types

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule)$25 minimum, scaling per the tiered valuation scheduleNo ADU-specific fee is published

Demolition Permit

Verified

Demolition is one of the enumerated project types on the general Building Permit/Zoning Compliance Application intake. A distinct, separate dangerous-building-abatement process also exists and was fully verified 2026-07-13: the City's own PDF of Ordinance No. 990 (burlingtoncolo.com/DocumentCenter/View/909) was retrieved and read in full (its filename retains the phrase 'proposed...DRAFT' from drafting, but the document's own text shows it was PASSED, ADOPTED and ORDERED PUBLISHED by the City Council on July 8, 2024, signed by Mayor Greg Swiatkowski, attested by City Clerk Georgia Gilley, with a Clerk's Certificate and a Certificate of Publication confirming publication in The Burlington Record on July 11, 2024 — i.e., it is the enacted, currently-effective ordinance despite the filename, not an unadopted draft). Ordinance No. 990 governs INVOLUNTARY code-enforcement demolition/abatement of buildings the City declares 'dangerous' (structural failure, fire/collapse hazard, uninhabitable, abandoned 6+ months, public nuisance, etc. — Section 2, items A-P) and is legally and procedurally distinct from a standard VOLUNTARY demolition permit processed on the combined Building Permit/Zoning Compliance Application.

Verified 2026-07-13 · Source

Requirements

  • Complete the combined Building Permit/Zoning Compliance Application, describing the demolition scope under Part A
  • Coordinate utility disconnection and the Building Permit Locate Form (811/800-922-1987) before demolition begins, consistent with the general new-construction requirements
  • Where a structure is instead the subject of a City-initiated dangerous-building declaration under Ordinance No. 990 (verified full text 2026-07-13), a distinct abatement process applies rather than a standard voluntary demolition permit: the City Administrator may declare a building 'dangerous' per the 16 criteria in Section 2 (structural failure/collapse risk, fire hazard, uninhabitability, 6+ months abandonment, public nuisance, etc.); the owner is served written notice (personal service or, if the owner cannot be located, posting plus certified mail to the address on the Kit Carson County tax rolls) with a default 90-day period to voluntarily abate (Section 7.C); if not voluntarily abated, the City may seek a judicial determination and abate the building itself, recovering costs from the owner as a property lien (Section 8) collected the same way as real estate taxes, plus a 5% inspection/incidental-cost assessment and a 10% collection-cost assessment on top of the abatement's actual cost; imminently dangerous buildings may be summarily (immediately) abated by the City Administrator without the notice-and-90-day process (Section 7.A-B)

Required documents

  • RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Same combined form used for all other permit types

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule)$25 minimum, scaling per the tiered valuation scheduleNo separate demolition-specific fee is published

Commercial Tenant Improvement / Change of Use Permit

Verified

Commercial tenant improvements and changes of use are processed under Part B ('Change of Use') of the combined Building Permit/Zoning Compliance Application, which separately captures present use, proposed use, current zoning, and any annexation/petition status, alongside Part A for any physical construction scope.

Verified 2026-07-06 · Source

Requirements

  • Complete Part B of the combined application: present use, proposed use, current zone, and annexation/petition status if applicable
  • Complete Part A if the tenant improvement includes physical construction, addition, or alteration work
  • Confirm zoning compliance for the proposed use with City Hall before applying

Required documents

  • RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Part B covers Change of Use specifically

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule, if construction work is involved)$25 minimum, scaling per the tiered valuation scheduleNo separate change-of-use or commercial-TI-specific fee is published; a Change of Use with no construction scope may not trigger the valuation-based fee at all — confirm with City Hall

Deck / Covered Patio Permit

Verified

Decks and covered patios are processed under the general 'Addition' or 'Other' scope on the combined Building Permit/Zoning Compliance Application; no deck-specific fee, document set, or exemption threshold is separately published by the City.

Verified 2026-07-06 · Source

Requirements

  • Complete the combined Building Permit/Zoning Compliance Application, describing the deck/patio scope, front/side/rear yard setbacks, and maximum height in Part A
  • Attach the Title 17.12.030(B) scaled site plat showing the deck/patio's location relative to lot lines and the principal structure

Required documents

  • RequiredBuilding Permit Application / Zoning Compliance Application (PDF)Includes explicit fields for front/side/rear yard setback and maximum height, directly applicable to deck/patio projects

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule)$25 minimum, scaling per the tiered valuation scheduleNo deck-specific fee or exemption is published

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Burlington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)Later version (2026-07-20) →View current record →All versions →

Permalink: /colorado/kit-carson-county/burlington/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: b4a28d8

Reproducible from PermitBase’s version-controlled dataset, commit b4a28d8.