Wellington building permits
Wellington, Colorado — as published 2026-07-07.
Reviewed 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family homes, duplexes, and townhomes in the Town of Wellington. Reviewed by SAFEbuilt, the Town's contracted building-department partner, under the 2024 IRC/IBC as locally amended (Ordinance No. 15-2025), effective January 1, 2026, plus the 2025 Colorado Wildfire Resiliency Code and the Colorado Model Electric and Solar Ready Code.
Verified 2026-07-23 · Source
Requirements
- 'New Buildings' are explicitly listed as a permit-requiring project type on the Town's 'Do I Need a Permit?' guide
- Plans reviewed under the 2024 IRC/IBC as locally amended by Ordinance No. 15-2025 (effective 1/1/2026), the 2025 Colorado Wildfire Resiliency Code, and the Colorado Model Electric and Solar Ready Code
- Foundations must be designed and construction drawings stamped by a Colorado-registered design professional, based on an engineer's soils report — CONFIRMED 2026-07-23 directly against the live codified text of IRC Section R401.2 as amended by Ordinance No. 15-2025 § 2 (adopted November 12, 2025, effective January 1, 2026), retrieved via the Browser pane against Municode Library (library.municode.com/co/wellington, version 'JUL 10, 2026 (CURRENT)'), which now renders full readable text (the prior 'un-fetchable JS SPA' limitation applied only to bare curl/automated fetch, not to a live browser session). Verbatim amendment text: 'All for new Group R, one and two family dwellings, and townhomes shall be designed and the construction drawings stamped by a Colorado registered design professional. The foundation design must be based on an engineer's soils report. The drawings must be noted with the engineering firm's name, specific location for design and soils report number. A site certification prepared by State of Colorado registered design professional is required for setback verification on all new Group R Division 3 occupancies.' (Ord. No. 15-2025, § 2, 11-12-25, eff. 1-1-26)
- All contractors and subcontractors must hold a current Town of Wellington Contractor License in addition to any required Colorado state trade license
- Application, plan submittal, and payment are all conducted through the Community Core/Connect online portal — mailed paper applications are not accepted
Required documents
- RequiredBuilding Permit ApplicationSubmitted online via Community Core/Connect
- RequiredConstruction DrawingsStamped by a Colorado-registered design professional; foundation design based on an engineer's soils report
- RequiredTown of Wellington Contractor LicenseRequired for all contractors/subcontractors; not required for an owner acting as their own general contractor on their own dwelling
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Issuance | $25 flat | Fee Schedule effective 2026-04-01, Res. No. 38-2025 / Ord. No. 01-2026 |
| Building Permit Fee — valuation $1 to $1,000 | $75 | — |
| Building Permit Fee — valuation $1,001 to $25,000 | $75 plus $14.00 for each additional $1,000 or fraction thereof over $1,000 | — |
| Building Permit Fee — valuation $25,001 to $50,000 | $391.25 plus $10.10 for each additional $1,000 or fraction thereof over $1,000 | — |
| Building Permit Fee — valuation $50,001 to $100,000 | $643.75 plus $7.00 for each additional $1,000 or fraction thereof over $1,000 | — |
| Building Permit Fee — valuation $100,001 to $500,000 | $993.75 plus $5.60 for each additional $1,000 or fraction thereof over $1,000 | — |
| Building Permit Fee — valuation $500,000 to $1,000,000 | $3,233.75 plus $4.75 for each additional $1,000 or fraction thereof over $1,000 | — |
| Building Permit Fee — valuation $1,000,000 or greater | $5,608.75 plus $3.15 for each additional $1,000 or fraction thereof | — |
| Building Plan Review Fee (Townhomes, Single- and Two-Unit Residential) | 30% of Building Fee | — |
| Town Administrative Fee | 10% of Building Fee | — |
| Electrical Fee | From State Electrical Fee Schedule (CRS 12-23-117); no separate Town valuation table | — |
Residential Addition / Remodel Permit
VerifiedRequired for additions, basement finishes, and remodels to existing residential structures in Wellington. Falls under the Town's 'Permits With Plan Review' track and 'Residential Alterations' permit-naming category, reviewed by SAFEbuilt under the 2024 IRC as locally amended.
Verified 2026-07-06 · Source
Requirements
- Reviewed under the 'Permits With Plan Review' track — requires the SAFEbuilt Building Guide packet and matching Wellington Project Checklist for the specific project type (Residential Addition, Basement Finish, or Residential Remodel)
- Structural modifications require an engineered letter
- Engineered plans by a Colorado-licensed engineer or architect may be required depending on project scope — reference the applicable Building Guide packet
- All contractors/subcontractors must hold a current Town of Wellington Contractor License
Required documents
- RequiredBuilding Permit ApplicationSubmitted online via Community Core/Connect; permit category selected per the Town's Permit Naming Categories chart (e.g. 'Residential Addition' or 'Residential Remodel')
- RequiredSAFEbuilt Building Guide Packet — Residential AdditionMinimum submittal requirements for addition projects
- RequiredWellington Project Checklist — Residential Addition/RemodelTown-specific checklist supplementing the SAFEbuilt guide
- OptionalEngineered LetterRequired if the project includes structural modifications
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Issuance | $25 flat | — |
| Building Permit Fee (same valuation-based schedule as new construction) | $75 minimum, scaling per the tiers in the Fee Schedule effective 2026-04-01 | — |
| Building Plan Review Fee (Single- and Two-Unit Residential) | 30% of Building Fee | — |
| Town Administrative Fee | 10% of Building Fee | — |
Electrical Permit
Required for electrical installation, alteration, or repair in Wellington. Governed by the 2026 NEC as locally adopted (effective January 1, 2026). Wellington does NOT run its own local electrical contractor licensing/certification program — it defers to Colorado State Electrical Board (DORA) licensing, with SAFEbuilt performing contemporaneous state-license verification at permit issuance per SB19-156.
Reviewed 2026-07-06 · Source
Requirements
- Governed by the 2026 NEC as adopted by the Town, effective January 1, 2026
- Contractors must hold a current Colorado State Electrical Board (DORA) Master Electrician license — Wellington does not issue its own separate electrical trade license; a Town of Wellington general Contractor License is still required in addition to the state trade license
- SAFEbuilt conducts contemporaneous state-license verification at permit issuance per SB19-156, requiring photocopies of the Colorado driver's license, Colorado Master's license (wallet card acceptable), and Colorado Contractor license (wallet card acceptable)
- Fee set by the Colorado state-mandated electrical fee schedule (CRS 12-23-117), not a Town-specific valuation table; the Town may add a local surcharge of up to 15% above the state base rate per statute
Required documents
- RequiredElectrical Permit Application (or Electrical Service Charge / Electrical Only category)Submitted via Community Core/Connect under the 'One Stop Permits' track for standalone electrical work, or as part of a larger plan-review permit for new construction/additions
- RequiredTown of Wellington Contractor LicenseRequired for all contractors performing electrical work
- RequiredColorado State Electrical Board (DORA) License copiesDriver's license, Master's license, and Contractor license photocopies for contemporaneous SAFEbuilt verification
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Fee | Set by the Colorado state-mandated electrical fee schedule per CRS 12-23-117, with Town surcharge of up to 15% above the state base rate permitted by statute | The Town's current (effective 2026-04-01) Master Fee Schedule (Res. No. 38-2025 / Ord. No. 01-2026) lists this line item as 'From State Electrical Fee Schedule' without a locally tabulated dollar figure. A Town-published 'Electrical Permit Fees' document shows the historical calculation method (Residential: banded by square footage; All Other: banded by installation valuation) but its dollar amounts are dated 'as of July 1, 2019' and are NOT current — omitted here rather than presented as today's rate. RE-CHASED 2026-07-23 with genuinely new avenues, still unrecoverable as a citable current figure: (1) dpo.colorado.gov (State Electrical Board) still returns a hard WAF 'Access denied' to both browser-header curl AND a live Browser-pane session; (2) the live (non-blocked) DPO 'Electrical and Plumbing Permits Homepage' (dpo.colorado.gov/EandP/Permits) confirms structurally why no static fee table is published: fees are generated dynamically inside a credit-card-gated online permit portal keyed to project-specific data, not published as a document — the DPO Permit and Inspection Forms page (checked live and via a Feb-14-2026 Wayback snapshot) lists only applications/guidelines, no fee schedule PDF; (3) that same DPO portal page confirms Larimer County itself has run its OWN local electrical inspection program since July 1, 2020 (the State Electrical Board does not inspect there), so a Wellington permit would never route through DPO's schedule directly in the first place; (4) Larimer County's own building-fees page (larimer.gov/building/fees), fetched live 2026-07-23, states '2026 Fee Schedule Coming Soon!' — even the county has not yet published a current table, and its closest Wayback snapshot (2025-03-07) is no fresher; (5) the Douglas County 'electrical-permit-app-2025.pdf' URL was re-checked on the theory its filename implied a 2025 refresh — the PDF itself is still internally dated 01/12/2023, not a new figure; (6) a City of Rifle, CO 'Effective August 2, 2024' electrical fee schedule was located but is Rifle's own home-rule locally-set valuation fee, not the CRS-anchored state schedule Wellington's ordinance references — not substitutable without misattributing a different jurisdiction's mechanism; (7) the current State Electrical Board rule text, 3 CCR 710-1 (fetched fresh via the Jan-28-2026 rule-revision version from sos.state.co.us), confirms fees are set by the Board under statute but does not embed a dollar table in the rule text itself. This is a confirmed structural non-publication (the current figure exists only inside DORA's interactive, credit-card-gated system), not a search shortfall. |
| Permit Issuance | $25 flat | — |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair in Wellington. Governed by the 2024 IPC as locally adopted (effective January 1, 2026). Wellington does NOT run its own local plumbing contractor licensing program — it defers to Colorado State Plumbing Board (DORA) licensing, with SAFEbuilt performing contemporaneous state-license verification per HB19-1086.
Verified 2026-07-06 · Source
Requirements
- Governed by the 2024 IPC as adopted by the Town, effective January 1, 2026
- Contractors must hold a current Colorado State Plumbing Board (DORA) Master Plumber license — Wellington does not issue its own separate plumbing trade license; a Town of Wellington general Contractor License is still required in addition
- SAFEbuilt conducts contemporaneous state-license verification at permit issuance per HB19-1086, requiring photocopies of the Colorado driver's license, Colorado Master's license, and Colorado Contractor license
Required documents
- RequiredPlumbing Permit Application (or Misc. Mechanical/Plumbing/Electrical category)Submitted via Community Core/Connect; standalone plumbing work uses the 'One Stop Permits' track
- RequiredTown of Wellington Contractor LicenseRequired in addition to Colorado DORA Plumbing license
- RequiredColorado State Plumbing Board (DORA) License copiesDriver's license, Master's license, and Contractor license photocopies for contemporaneous SAFEbuilt verification per HB19-1086
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Fee (same valuation-based schedule as Building/Mechanical) | $75 minimum, scaling per the tiers in the Fee Schedule effective 2026-04-01 | No separate plumbing-specific valuation table is published; billed under the general Building Permit Fee schedule |
| Permit Issuance | $25 flat | — |
| Building Plan Review Fee (Single- and Two-Unit Residential) | 30% of Permit Fee | — |
Mechanical / HVAC Permit
VerifiedRequired for heating, cooling, and ventilation equipment installation or replacement in Wellington. Governed by the 2024 IMC as locally adopted (effective January 1, 2026). Furnace, AC, and AC/Furnace Combo replacements are processed under the Town's 'One Stop Permits — No Plan Review' track at a flat fee.
Verified 2026-07-06 · Source
Requirements
- Governed by the 2024 IMC as adopted by the Town, effective January 1, 2026
- Furnace/AC/AC-Furnace-Combo replacement processed as a 'One Stop Permit' (no plan review) at a flat $75 fee
- New mechanical installation as part of new construction or an addition is reviewed as part of the combined project plan review
- All contractors must hold a current Town of Wellington Contractor License
Required documents
- RequiredPermit Application — Furnace/AC/Combo Replacement or new MechanicalSubmitted via Community Core/Connect under the applicable permit-naming category
- RequiredTown of Wellington Contractor LicenseRequired for all contractors performing mechanical work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Furnace or AC Replacement | $75 flat | Fee Schedule effective 2026-04-01 |
| New Mechanical Installation (new construction/addition) | Billed under the general valuation-based Building Permit Fee schedule ($75 minimum) rather than the flat replacement fee | — |
| Permit Issuance | $25 flat | — |
Roofing Permit (Re-Roof)
VerifiedRequired for residential re-roofing in Wellington. Processed under the Town's 'One Stop Permits — No Plan Review' track at a flat $75 fee. Commercial re-roofing (painting a metal roof excepted) also requires a permit.
Verified 2026-07-06 · Source
Requirements
- Residential Re-roof is a 'One Stop Permit' (no plan review) at a flat $75 fee
- Commercial re-roofing requires a permit; painting a metal roof specifically does NOT require a permit, per the Town's 'Do I Need a Permit?' guide
- SAFEbuilt Building Guide Re-Roof packet and the Wellington Project Checklist Roof Replacement document define minimum submittal/material requirements
- All contractors must hold a current Town of Wellington Contractor License
Required documents
- RequiredPermit Application — Residential Roof (Asphalt or Other)Submitted via Community Core/Connect under the applicable 'Residential Roof' permit-naming category
- RequiredWellington Project Checklist — Roof ReplacementTown-specific checklist supplementing the SAFEbuilt Re-Roof guide
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Roof/Re-roof | $75 flat | Fee Schedule effective 2026-04-01 |
| Permit Issuance | $25 flat | — |
Solar Photovoltaic (PV) System Permit
Required for rooftop and ground-mount photovoltaic solar installations in Wellington. Falls under the Town's 'Permits With Plan Review' track ('Residential Alteration' category), reviewed alongside the Colorado Model Electric and Solar Ready Code adopted with the 2024 I-Codes.
Reviewed 2026-07-20 · Source
Requirements
- Reviewed under the 'Permits With Plan Review' track, using the SAFEbuilt PV System Building Guide and the Wellington Project Checklist PV System document
- Interacts with the Colorado Model Electric and Solar Ready Code, adopted alongside the 2024 I-Codes effective January 1, 2026, and HB22-1362's statewide solar/EV-readiness floor
- Electrical scope of the installation billed under the state-mandated electrical fee schedule (CRS 12-23-117), not the Town's building valuation table
- All contractors must hold a current Town of Wellington Contractor License plus applicable Colorado state electrical trade license
Required documents
- RequiredPermit Application — PV SystemSubmitted via Community Core/Connect under the 'PV System' permit-naming category
- RequiredWellington Project Checklist — PV SystemTown-specific checklist supplementing the SAFEbuilt PV System guide
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Fee (PV/solar electrical scope) | From State Electrical Fee Schedule (CRS 12-23-117), plus Town surcharge up to 15% above state base rate | — |
| Permit Issuance | $25 flat | — |
Demolition Permit
VerifiedRequired for demolition of structures in Wellington. Listed as a distinct permit-requiring project type on the Town's 'Do I Need a Permit?' guide and processed under the 'One Stop Permits — No Plan Review' track.
Verified 2026-07-06 · Source
Requirements
- Demolition is explicitly listed as a permit-requiring project type on the Town's 'Do I Need a Permit?' guide and as a distinct 'One Stop Permit' category on the Permit Naming Categories chart
- All contractors must hold a current Town of Wellington Contractor License
Required documents
- RequiredPermit Application — DemolitionSubmitted via Community Core/Connect under the 'Demolition' permit-naming category; requires the address where work is to be performed and contractor information
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition / Mitigation | $50 flat | Fee Schedule effective 2026-04-01 |
| Permit Issuance | $25 flat | — |
Deck / Patio Cover / Pergola Permit
VerifiedRequired for uncovered decks, patio covers, pergolas, gazebos, and carports in Wellington. Falls under the 'Permits With Plan Review' track ('Residential Alteration' category).
Verified 2026-07-06 · Source
Requirements
- Reviewed under the 'Permits With Plan Review' track using the applicable SAFEbuilt Building Guide (Uncovered Decks & Porches, or Patio Covers & Carports) and matching Wellington Project Checklist
- All contractors must hold a current Town of Wellington Contractor License; homeowners acting as their own general contractor on their own dwelling do not need one
Required documents
- RequiredPermit Application — Deck, Carport/Patio Cover/PergolaSubmitted via Community Core/Connect under the applicable permit-naming category
- RequiredWellington Project Checklist — Uncovered Deck & Porches, or Patio Covers/Pergolas/GazebosTown-specific checklist matching project scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based, general schedule) | $75 minimum, scaling per the tiers in the Fee Schedule effective 2026-04-01 | No separate flat deck/patio fee is published; billed under the general valuation-based Building Permit Fee schedule |
| Permit Issuance | $25 flat | — |
| Building Plan Review Fee (Single- and Two-Unit Residential) | 30% of Building Fee | — |
Water Heater Replacement Permit
VerifiedRequired for water heater installation/replacement in Wellington. Processed under the 'One Stop Permits — No Plan Review' track at a flat $75 fee, distinct from the combined 'furnace-water-heater-replacement' bundling seen in some other Colorado jurisdictions — Wellington bills Water Heater Replacement and Furnace/AC Replacement as separate but identically priced flat-fee line items.
Verified 2026-07-06 · Source
Requirements
- Water Heater Replacement is its own 'One Stop Permit' (no plan review) line item, flat $75, separate from the Furnace/AC Replacement line item (also flat $75)
- All contractors must hold a current Town of Wellington Contractor License
Required documents
- RequiredPermit Application — Water HeaterSubmitted via Community Core/Connect under the 'Water Heater' permit-naming category
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Water Heater Replacement | $75 flat | Fee Schedule effective 2026-04-01; identical flat rate to Furnace/AC Replacement but a separate line item |
| Permit Issuance | $25 flat | — |
Electric Vehicle (EV) Charging Station / EVSE Permit
VerifiedWellington has two distinct layers relevant to EV charging: (1) A standard residential or single-unit EVSE circuit installation is not a separate permit type -- it is billed and processed through the Town's existing Electrical Permit (state-anchored CRS § 12-115-121 fee schedule (renumbered from the commonly-cited § 12-23-117 effective 10/1/2019), plus up to a 15% Town surcharge), the same 'One Stop Permits -- No Plan Review' track used for other standalone electrical work, since Wellington defers to Colorado State Electrical Board licensing and has no dedicated EV-charger fee line. (2) For EV charging SYSTEM/site installations (e.g., commercial or multi-stall charging stations), Wellington's Board of Trustees adopted Ordinance No. 15-2025 (enacted November 12, 2025) amending the Town's Land Use Code to comply with Colorado HB24-1173 (Electric Vehicle Charging System Permits Act) -- Wellington's 2020 Census population of 11,144 places it above the Act's 10,000-person 'covered municipality' threshold. Per the Town's own Planning Commission materials (September 8, 2025 meeting), staff recommended and the Town adopted the legislation's minimum Land Use Code amendment option (rather than the Colorado Energy Office's full model code, or an opt-out), establishing an administrative review process for EV charging infrastructure installations under 8 stalls.
Verified 2026-07-20 · Source
Requirements
- For a standard residential/single-unit EV charger circuit: no standalone EV-specific permit exists; apply for the Town's standard Electrical Permit through the Community Core/Connect 'One Stop Permits' track, the same as any other standalone electrical work
- Contractors must hold a current Colorado State Electrical Board (DORA) Master Electrician license, contemporaneously verified by SAFEbuilt at permit issuance per SB19-156, plus a Town of Wellington general Contractor License
- For an EV charging SYSTEM/site installation (commercial or multi-stall charging stations): subject to the administrative land-use review process established by Ordinance No. 15-2025 (enacted November 12, 2025), which amended the Town's Land Use Code to comply with Colorado HB24-1173 for installations under 8 stalls
- Wellington's 2020 Census population (11,144) exceeds the 10,000-person threshold making it a 'covered municipality' under HB24-1173, legally obligating the administrative-review/checklist and denial-appeal provisions the Act requires for covered jurisdictions that choose the custom-standards option
- Governed by the 2026 NEC as locally adopted (effective January 1, 2026), which includes Article 625 (Electric Vehicle Power Transfer System) provisions; the Town's own Building Department page separately notes 'improved energy efficiency and electrical readiness (solar, EV infrastructure)' as part of its 2024 I-Codes adoption
Required documents
- RequiredElectrical Permit Application (or Electrical Service Charge / Electrical Only category)Standard electrical permit application for a residential/single-unit EVSE circuit; submitted via Community Core/Connect under the One Stop Permits track
- OptionalLand Use Code Administrative Review Application (EV Charging System)Required only for EV charging SYSTEM/site installations (commercial/multi-stall) under the Ordinance No. 15-2025 HB24-1173 compliance amendments; not required for a single residential charger circuit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Fee (EV charger/EVSE circuit) | Colorado State Electrical Board schedule: $90 base fee for valuation up to $2,000, plus $8.00 per additional $1,000 of valuation (rounded up) -- per the Board's May 2019 published schedule (a 2024 legislative fiscal note, HB 24-1263, documents the base state inspection fee increasing from $88 to $92 effective FY2024-25, so the current figure may be modestly higher), with a Town surcharge of up to 15% above the state base rate permitted by CRS § 12-115-121 | Same fee mechanism used for the Town's general electrical-permit entry. Colorado Revised Statutes § 12-115-121 (renumbered from § 12-23-117 effective 10/1/2019). The Town's current Master Fee Schedule (effective 2026-04-01) lists the electrical line item as "From State Electrical Fee Schedule" without a locally tabulated amount -- re-chased 2026-07-20 and located the underlying State Electrical Board fee table (effective 5/15/2019, reproduced by the City of Sheridan, CO) to substantiate the actual dollar mechanism. |
| Permit Issuance | $25 flat | Same flat issuance fee applied to the general electrical-permit entry |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wellington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.