Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-08-20.

Lamar building permits

Verified

Lamar, Colorado — as published 2026-08-20.

Verified 2026-07-23 · Source

Codes adopted

2018 International Building Code (IBC)2018 International Residential Code (IRC)2018 International Mechanical Code (IMC) (listed on the City's page as '2018 Mechanical Code')2018 International Plumbing Code (IPC)2018 International Fire Code (IFC)2018 International Fuel Gas Code (IFGC)2018 International Existing Building Code (IEBC)2018 International Energy Conservation Code (IECC) (listed on the City's page as '2018 International Energy Code')2015 International Energy Conservation Code (listed separately on the City's page as '2015 Energy Conservation Code' alongside the 2018 IECC entry — the page lists both without clarifying which governs; treated here as a verbatim-as-published discrepancy rather than resolved by assumption)2015 International Swimming Pool and Spa Code (ISPSC)2010 Americans with Disabilities Act (ADA) standards2006 International Property Maintenance Code (IPMC)Codes are enforced within Lamar city limits AND for any properties connected/connecting to City water/wastewater within a 3-mile radius of the City limits, per the Building Department's own scoping statement.HB22-1362 (Colorado Building Greenhouse Gas Emissions Act) compliance note: Lamar's own Building Department webpage lists the 2018 IECC (plus a separately-listed 2015 Energy Conservation Code entry) as the currently enforced energy code, which pre-dates the 2021 IECC-family editions that HB22-1362 nominally directs Colorado jurisdictions to adopt on a phased statewide timeline. HB22-1362's own statutory carve-out mechanism is a 'rural county' exemption (grant-application-contingent, allowing continued use of one of the 3 most recent IECC editions in lieu of the model low-energy/electric-ready codes) that applies at the COUNTY level, not a flat municipal population threshold — Prowers County (est. population ~11,900-12,300) would plausibly qualify as rural under this mechanism, but the City's own webpage does not cite HB22-1362, a grant application, or any rural-county determination as the basis for its 2018 IECC adoption. This is reported as an honest as-published discrepancy, not resolved by assumption; confidence on code-currency is 'partial' for this reason alone (the codes-adopted list itself, as literally published by the City, is verified).

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new construction of single-family homes and other residential structures within Lamar city limits and the 3-mile water/wastewater-connection radius. Reviewed under the 2018 IBC/IRC as adopted, plus the City's published Climatic and Geographic Design Criteria (30 psf ground snow load, 110 mph wind speed, 36-inch frost depth). Issued by the City of Lamar Building Department using the City's own Building Permit Application form; electrical and plumbing work under the same project are permitted separately and directly through the State of Colorado DORA boards, not through this application.

Verified 2026-07-06 · Source

Requirements

  • Building Permit Application (2026 form) completed by the property owner, licensed contractor, or an authorized representative, describing project information, applicant, property owner, and contractor(s)
  • Plans/work must comply with the 2018 IBC/IRC as adopted and the City's Climatic and Geographic Design Criteria: 30 psf ground snow load, 110 mph wind speed, Seismic Design Category B, 36-inch minimum frost depth, ice barrier underlayment required
  • Asbestos certification section on the permit application must be completed per C.R.S. 25-7 et seq.
  • Electrical and plumbing/gas-line permits and inspections are NOT part of this application — apply directly through Colorado DORA (State Electrical Board and State Plumbing Board)
  • Properties on US Hwy 287 (Main Street) or US Hwy 50 (East Olive/Main) require a separate CDOT State Access Permit for new construction
  • All contractors performing the work must hold a current City of Lamar Contractor's License (liability insurance $100,000 minimum, workers' compensation or Opt-Out documentation, paid license fee, paid Business/Sales Tax license)
  • Permit expires if work has not begun within 90 days of issuance (LMC Sec. 6-5(a)), or if work has not been substantially completed within two years of issuance (LMC Sec. 6-5(b))
  • Owner responsible for 3% use tax on construction materials at project completion, per the City's Building Permit Application

Required documents

  • RequiredBuilding Permit Application (2026)City of Lamar Building Department form; captures project info, applicant, owner, contractor(s), estimated valuation, asbestos certification, and fee breakdown (Building/Plumbing/Mechanical/Asbestos/Plan Review/Signage/Other)
  • OptionalPlan Review Application (for commercial properties and developments)Separate form required when the project is a commercial property or development subject to plan review under Section 106
  • RequiredCity of Lamar Contractor's LicenseRequired for all contractors performing the work; new or renewal application, proof of liability insurance and workers' compensation, paid annual fee

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1-$500$33.002026 Rate and Fee Schedule, authorized by Ordinance #1052
Building Permit Fee — valuation $501-$2,000$33.00 plus $5.00 per additional $100 increment2026 Rate and Fee Schedule (PDF), Building Permits table: base fee from Valuation $1-$500 tier ($33.00) plus $5.00 per $100 increment for Valuation $501-$2,000 tier
Building Permit Fee — valuation $2,001-$25,000Base fee plus $20.00 per additional $1,000 increment2026 Rate and Fee Schedule (PDF), Building Permits table, Valuation $2,001-$25,000 tier
Building Permit Fee — valuation $25,001-$50,000Base fee plus $15.00 per additional $1,000 increment2026 Rate and Fee Schedule (PDF), Building Permits table, Valuation $25,001-$50,000 tier
Building Permit Fee — valuation $50,001-$100,000Base fee plus $10.00 per additional $1,000 increment2026 Rate and Fee Schedule (PDF), Building Permits table, Valuation $50,001-$100,000 tier
Building Permit Fee — valuation $100,001-$500,000Base fee plus $8.00 per additional $1,000 increment2026 Rate and Fee Schedule (PDF), Building Permits table, Valuation $100,001-$500,000 tier
Building Permit Fee — valuation $500,001-$1,000,000Base fee plus $7.00 per additional $1,000 increment2026 Rate and Fee Schedule (PDF), Building Permits table, Valuation $500,001-$1,000,000 tier
Building Permit Fee — valuation $1,000,001 and upBase fee plus $7.00 per additional $1,000 increment2026 Rate and Fee Schedule (PDF), Building Permits table, Valuation $1,000,001 and up tier
Plan Review Fee65% of the total Building Permit FeeCharged in addition to the building permit fee when submittal documents are required under (IBC) Section 106
Use Tax3% of construction materials value not already subject to sales tax collectionPer the City's Building Permit Application; owed by the project owner upon completion of construction
Commencing work without a valid permit (penalty)2x the cost of the Building Permit that would have been required2026 Rate and Fee Schedule (PDF), Building Permits section, "Commencing work without a valid permit" clause

Residential Addition / Remodel Permit

Verified

Required for additions and remodels to existing residential structures in Lamar. Uses the same Building Permit Application and valuation-based fee schedule as new construction; scope-specific submittal detail (e.g., structural changes, wall removal) is determined by the Building Department at application, since the City does not publish a separate addition/remodel submittal matrix distinct from its general Building Permit Application.

Verified 2026-07-06 · Source

Requirements

  • Building Permit Application (2026 form) required for any addition, structural alteration, or remodel per LMC Sec. 6-2 ('No building or other structure shall be erected, moved, added to, or structurally altered without a permit')
  • Aesthetic-only work (e.g., painting, changing carpet) does not require a permit, per the Building Department's stated permit-requirement scope
  • Plan Review Application required if the project is commercial/development in nature and submittal documents are required under Section 106
  • Electrical and plumbing work is permitted separately and directly through Colorado DORA, not this application
  • City of Lamar Contractor's License required for all contractors performing the work

Required documents

  • RequiredBuilding Permit Application (2026)Same form used for new construction; description of work section captures addition/remodel scope
  • RequiredCity of Lamar Contractor's LicenseRequired for all contractors

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule as new construction)$33.00 minimum, scaling per the valuation tiers in the 2026 Rate and Fee Schedule2026 Rate and Fee Schedule, Ordinance #1052
Plan Review Fee65% of Building Permit FeeOnly when submittal documents are required under Section 106
Use Tax3% of construction materials value not already subject to sales tax collection2026 New Building Permit Application (PDF), use-tax notice on the application form

Electrical Permit (State-Administered)

Verified

The City of Lamar does not issue electrical permits or perform electrical inspections. Per the City's Building Department page and its 2026 Building Permit Application, obtain electrical permits directly from the State of Colorado Department of Regulatory Agencies (DORA), State Electrical Board.

Verified 2026-07-06 · Source

Requirements

  • Apply directly through the Colorado DORA State Electrical Board at dora.colorado.gov/professions/electrical — NOT through the City of Lamar Building Department
  • The City's 2026 Building Permit Application form itself instructs applicants: 'To apply for an electrical permit, access the website at www.dora.colorado.gov/professions/electrical'
  • Electrical inspections are conducted by DORA's State Electrical Board, not City of Lamar Building Department staff, per the Building Department's 'Related Agency Links' and 'Inspections' sections

Required documents

  • RequiredColorado State Electrical Board Permit ApplicationFiled directly with DORA, not with the City of Lamar

Fee schedule

Fee typeAmountNotes
State Electrical Permit and Inspection FeesSet by the Colorado Department of Regulatory Agencies (DORA), State Electrical Board — not published in the City of Lamar's fee scheduleThe City of Lamar's 2026 Rate and Fee Schedule contains no electrical permit fee line item, consistent with the City not administering this permit type

Plumbing Permit

Verified

The City of Lamar Building Department issues its own Plumbing Permits (issuance, supplemental permits, building sewer, water line, backflow devices, etc., per the 2026 Rate and Fee Schedule Plumbing Fees table) governed by the 2018 International Plumbing Code as adopted. Interior plumbing and gas-line INSPECTIONS are conducted by the Colorado DORA State Plumbing Board, not City staff — a split arrangement distinct from the fully state-administered electrical permit type. The City's own codified local amendment to IPC Section 101.2 (Scope), LMC Sec. 6-128(a)(2), reads in full: 'All water, gas and sewer lines running from the service line to any building will be inspected before being covered' — this is the specific ordinance basis for the City-inspected/City-fee-scheduled scope (building sewer, new sewer line, new domestic water line, backflow devices, lawn sprinkler systems, etc., all itemized on the 2026 Rate and Fee Schedule). Interior plumbing and gas piping work INSIDE the building envelope remains DORA State Plumbing Board jurisdiction under C.R.S. 12-155-120(1)(a), which vests inspection authority in a state plumbing inspector except where 'the local entity... conducts inspections and issues plumbing permits' — Lamar's own ordinance and fee schedule show the City has only taken over the exterior service-line-to-building scope, not full local certification, consistent with the City's own webpage statement that DORA (not the City) inspects interior plumbing and gas lines.

Verified 2026-07-23 · Source

Requirements

  • Building Permit Application (2026 form), Plumbing Permit section, filed with the City of Lamar Building Department
  • Governed by the 2018 IPC as adopted by the City, with local amendments codified at LMC Sec. 6-126 through 6-128
  • LMC Sec. 6-128(a)(2) (local amendment to IPC Section 101.2, Scope): 'All water, gas and sewer lines running from the service line to any building will be inspected before being covered' — this is the City-inspected scope corresponding to the City's own Plumbing Fees table
  • Interior plumbing and gas-line inspections (inside the building envelope) are conducted by the Colorado DORA State Plumbing Board (dora.colorado.gov/professions/plumbing) under C.R.S. 12-155-120, NOT City of Lamar Building Department inspectors, per the Building Department's own 'Related Agency Links' and 'Inspections' sections
  • The City's own Building Permit Application form separately instructs: 'to apply for a plumbing permit, access the website at www.dora.colorado.gov/professions/plumbing' for the interior/gas-piping scope; the exterior service-line scope itemized on the City's own fee schedule is filed and inspected by the City directly per LMC Sec. 6-128(a)(2)

Required documents

  • RequiredBuilding Permit Application (2026) — Plumbing sectionFiled with the City of Lamar Building Department for City-fee-schedule plumbing work
  • RequiredColorado DORA State Plumbing Board filingRequired for interior plumbing and gas-line work inspection, per DORA (dora.colorado.gov/professions/plumbing)

Fee schedule

Fee typeAmountNotes
Plumbing Permit — Issuance of each permit$31.002026 Rate and Fee Schedule
Plumbing Permit — Supplemental permits$16.002026 Rate and Fee Schedule (PDF), Plumbing Fees table
Building Sewer or Trailer Park Sewer$24.00 per item2026 Rate and Fee Schedule (PDF), Plumbing Fees table
Rainwater System$12.00 per drain2026 Rate and Fee Schedule (PDF), Plumbing Fees table
Cesspool$39.00 per item2026 Rate and Fee Schedule (PDF), Plumbing Fees table
New Sewer Line$62.002026 Rate and Fee Schedule (PDF), Plumbing Fees table
Private Sewage Disposal System$62.00 per item2026 Rate and Fee Schedule (PDF), Plumbing Fees table
Water Heater or Vent$12.00 per item2026 Rate and Fee Schedule (PDF), Plumbing Fees table
New Domestic Water Line$12.002026 Rate and Fee Schedule (PDF), Plumbing Fees table
Installation, Alteration or Repair of Water Pipe$12.00 per item2026 Rate and Fee Schedule (PDF), Plumbing Fees table
Repair or Alteration of Drainage or Vent Piping$12.00 per item2026 Rate and Fee Schedule (PDF), Plumbing Fees table
Lawn Sprinkler System$12.00 per meter2026 Rate and Fee Schedule (PDF), Plumbing Fees table
Backflow protective device (not atmospheric) — 2" diameter or smaller$12.00 per item2026 Rate and Fee Schedule (PDF), Plumbing Fees table
Backflow protective device (not atmospheric) — over 2" diameter$24.00 per item2026 Rate and Fee Schedule (PDF), Plumbing Fees table
Graywater System$62.00 per item2026 Rate and Fee Schedule (PDF), Plumbing Fees table
Plumbing Contractor's License (City of Lamar)New: $15.00-$75.00 (quarterly-tiered) / Renewal: $75.002026 Rate and Fee Schedule, License Fees table

Mechanical / HVAC Permit

Verified

Required for heating, cooling, ventilation, and fuel-gas equipment installation or replacement in Lamar. Issued by the City of Lamar Building Department under the 2018 International Mechanical Code and 2018 International Fuel Gas Code as adopted, with a detailed itemized fee schedule (furnaces, air conditioning units, boilers/compressors, airhandlers, evaporative coolers, ventilation/exhaust, incinerators).

Verified 2026-07-06 · Source

Requirements

  • Building Permit Application (2026 form), Mechanical section, filed with the City of Lamar Building Department
  • Governed by the 2018 IMC and 2018 IFGC as adopted
  • City of Lamar Contractor's License required for all contractors performing mechanical work
  • Alternate energy equipment (state-regulated cap): permit fee for alternate energy equipment may not exceed $150.00 per state regulation, per the 2026 Rate and Fee Schedule

Required documents

  • RequiredBuilding Permit Application (2026) — Mechanical sectionFiled with the City of Lamar Building Department
  • RequiredCity of Lamar Contractor's LicenseRequired for all contractors performing mechanical work

Fee schedule

Fee typeAmountNotes
Issuance of Permit$31.002026 Rate and Fee Schedule, Mechanical Permits table
Supplemental Permits$11.002026 Rate and Fee Schedule (PDF), Mechanical Permits table
Furnace — up to 100,000 BTU$21.002026 Rate and Fee Schedule (PDF), Mechanical Permits table, Furnaces subsection
Furnace — over 100,000 BTU$26.002026 Rate and Fee Schedule (PDF), Mechanical Permits table, Furnaces subsection
Floor Furnace / Relocation of heaters$21.00 each2026 Rate and Fee Schedule (PDF), Mechanical Permits table, Furnaces subsection: Floor Furnace ($21.00) and Relocation of heaters ($21.00) listed as separate line items, both at this amount
Air Conditioning Unit — 1-3 Ton$15.002026 Rate and Fee Schedule (PDF), Mechanical Permits table, Air Conditioning Units subsection
Air Conditioning Unit — 4 Ton and up$25.002026 Rate and Fee Schedule (PDF), Mechanical Permits table, Air Conditioning Units subsection
Appliance Vents (installation, relocation)$11.00 per item2026 Rate and Fee Schedule (PDF), Mechanical Permits table
Repairs or Additions$20.00 per item2026 Rate and Fee Schedule (PDF), Mechanical Permits table, "Repairs or Additions by this code" line
Boilers/Compressors/Absorption Systems — up to 100,000 BTU, 3 HP$21.002026 Rate and Fee Schedule (PDF), Mechanical Permits table, Boilers/Compressors/Absorption Systems subsection, first tier
Boilers/Compressors/Absorption Systems — over 1,750,000 BTU, 50 HP$122.00Full graduated table: $21/$38/$52/$77/$122 across five BTU/HP tiers
Airhandlers — up to 10,000 CFM$15.002026 Rate and Fee Schedule (PDF), Mechanical Permits table, Airhandlers subsection
Airhandlers — over 10,000 CFM$25.002026 Rate and Fee Schedule (PDF), Mechanical Permits table, Airhandlers subsection
Evaporative Coolers (non-portable)$15.002026 Rate and Fee Schedule (PDF), Mechanical Permits table
Ventilation/Exhaust (fan, system, hood)$11.00-$15.00 depending on type2026 Rate and Fee Schedule (PDF), Mechanical Permits table, Ventilation and Exhaust subsection: fan connected to single duct $11.00, system not part of permit $15.00, hood served by mechanical exhaust $15.00
Incinerator (domestic)$26.002026 Rate and Fee Schedule (PDF), Mechanical Permits table, Incinerator subsection
Incinerator (commercial/industrial)$88.002026 Rate and Fee Schedule (PDF), Mechanical Permits table, Incinerator subsection
Alternate energy equipment permit fee (state cap)$150.00 maximumPer state regulation, cited on the 2026 Rate and Fee Schedule

Re-Roof Permit

Verified

Re-roofing work in Lamar requires a Building Permit under the general Building Permit Application (there is no separate re-roof-specific application or fee line item published by the City); reviewed under the 2018 IBC/IRC as adopted, subject to the City's Climatic and Geographic Design Criteria, including required ice barrier underlayment.

Verified 2026-07-23 · Source

Requirements

  • Building Permit Application (2026 form) required per LMC Sec. 6-2, since re-roofing is a structural alteration
  • Ice barrier underlayment required, per the City's Climatic and Geographic Design Criteria
  • City of Lamar Contractor's License required for the roofing contractor performing the work

Required documents

  • RequiredBuilding Permit Application (2026) — Building/Residential scopeSame general-purpose form used for all building permit types; no distinct re-roof form is published

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same schedule as new construction)$33.00 minimum, scaling per the valuation tiers in the 2026 Rate and Fee Schedule
No separate flat re-roof fee is published; Show full citation

No separate flat re-roof fee is published; billed under the general valuation-based Building Permit Fee schedule. the general Type-of-Permit selector on the application form (Building/Mechanical/Demolition/Signage/Plumbing) has no roofing-specific category either, confirming re-roofs are billed as a standard Building Permit.

Use Tax3% of materials value not already subject to sales tax collection2026 New Building Permit Application (PDF), use-tax notice on the application form. The 2026 Rate and Fee Schedule does not state this figure; it appears on the permit application itself.

Rooftop Solar / Photovoltaic Permit

Verified

Solar photovoltaic and other alternate energy equipment installations in Lamar are permitted under the general Building/Mechanical Permit Application, with a state-regulated fee cap. Electrical interconnection work is subject to the standard Colorado DORA State Electrical Board permit/inspection routing, not the City.

Verified 2026-07-20 · Source

Requirements

  • Building Permit Application (2026 form) required for the mounting/structural and mechanical scope of the installation
  • Electrical interconnection work permitted and inspected separately and directly through Colorado DORA State Electrical Board (dora.colorado.gov/professions/electrical), not the City of Lamar
  • State regulation caps the City's permit fee for alternate energy equipment at $150.00, per the 2026 Rate and Fee Schedule
  • City of Lamar Contractor's License required for the installing contractor

Required documents

  • RequiredBuilding Permit Application (2026) — alternate energy/solar scopeFiled with the City of Lamar Building Department for the structural/mounting portion
  • RequiredColorado DORA State Electrical Board PermitRequired separately for the electrical interconnection work

Fee schedule

Fee typeAmountNotes
Alternate energy equipment permit fee$150.00 maximum
2026 Rate and Fee Schedule: 'State regulations require that permit fees for alternate energy equipment be no more than $150.00' — re-confirmed 2026-07-20 by downloading the live 2026 Rate and Fee… Show full citation

2026 Rate and Fee Schedule: 'State regulations require that permit fees for alternate energy equipment be no more than $150.00' — re-confirmed 2026-07-20 by downloading the live 2026 Rate and Fee Schedule PDF directly and visually reading page 8 (Mechanical Permits section), which states this exact figure verbatim under a '2026 Fee' column. Note on the City's own characterization: Colorado's actual statewide statutory ceiling for solar/alternate-energy permit fees (C.R.S. 24-48.5-113, extended through 12-31-2029 by HB21-1284) is $500 residential / $1,000 nonresidential under 2MW, not $150 — Lamar's own $150 figure is the City's own current locally-set rate (below the statutory ceiling; the statute only lets a jurisdiction raise a below-cap fee by up to 5%/year toward the $500 cap), not itself a state-mandated number, despite how the City's own document phrases it. The $150 dollar figure charged is accurate and current regardless of that phrasing.

EV Charger / EVSE Permit

Verified

Electric vehicle charging equipment (EVSE) installation in the City of Lamar is an electrical installation, and the City of Lamar does NOT issue electrical permits or conduct electrical inspections itself — per the City's own Building Department webpage and its 2026 Building Permit Application form, electrical permits must be obtained directly from the State of Colorado Department of Regulatory Agencies (DORA), State Electrical Board, the same routing documented on the general Electrical Permit entry. The City's 2026 Rate and Fee Schedule (amended 1/12/2026), reviewed page-by-page in full, contains no electrical permit fee line item at all (consistent with the City not administering this permit type) and no distinct EV-charger/EVSE line item of any kind.

Verified 2026-07-20 · Source

Requirements

  • Apply directly through the Colorado DORA State Electrical Board at dora.colorado.gov/professions/electrical — NOT through the City of Lamar Building Department
  • The City's 2026 Building Permit Application form itself instructs applicants: 'To apply for an electrical permit, access the website at www.dora.colorado.gov/professions/electrical'
  • Electrical inspections are conducted by DORA's State Electrical Board, not City of Lamar Building Department staff
  • If the EVSE installation is paired with a City-permitted mounting/structural scope (e.g., a carport or accessory structure housing the charger), that scope would separately require a City Building Permit Application, but the electrical/EVSE circuit itself remains DORA's jurisdiction

Required documents

  • RequiredColorado State Electrical Board Permit ApplicationFiled directly with DORA, not with the City of Lamar

Fee schedule

Fee typeAmountNotes
State Electrical Permit and Inspection FeesSet by the Colorado Department of Regulatory Agencies (DORA), State Electrical Board — not published in the City of Lamar's fee scheduleThe City of Lamar's 2026 Rate and Fee Schedule (amended 1/12/2026) contains no electrical permit fee line item and no EV-charger/EVSE line item, consistent with the City not administering either permit type

Demolition Permit

Verified

Required for demolition or removal of structures in Lamar. Uses a dedicated valuation-based fee schedule set by Resolution 16-10-03, distinct from the general Building Permit valuation table.

Verified 2026-07-06 · Source

Requirements

  • Building Permit Application (2026 form), Demolition scope, filed with the City of Lamar Building Department
  • Fee schedule set by Resolution 16-10-03, based on demolition/removal valuation tiers
  • If the City Administrator determines an engineering study must be performed before or during demolition to preserve public safety, the cost of that study is charged in addition to the demolition permit fee
  • Asbestos certification (per C.R.S. 25-7 et seq.) on the Building Permit Application applies to demolition scope as well, and the City's webpage separately flags that CDPHE may require an asbestos inspection before renovation or demolition of a building of any age

Required documents

  • RequiredBuilding Permit Application (2026) — Demolition scopeFiled with the City of Lamar Building Department

Fee schedule

Fee typeAmountNotes
Demolition/Removal $1-$500$33.00 per permitResolution 16-10-03, 2026 Rate and Fee Schedule
Demolition/Removal $501-$2,000Base fee plus $5.00 per $1,000 increment2026 Rate and Fee Schedule (PDF), Demolition Permits table
Demolition/Removal $2,001-$25,000Base fee plus $20.00 per $1,000 increment2026 Rate and Fee Schedule (PDF), Demolition Permits table
Demolition/Removal $25,001-$50,000Base fee plus $15.00 per $1,000 increment2026 Rate and Fee Schedule (PDF), Demolition Permits table
Demolition/Removal $50,001-$100,000Base fee plus $10.00 per $1,000 increment2026 Rate and Fee Schedule (PDF), Demolition Permits table
Demolition/Removal $100,001-$500,000Base fee plus $8.00 per $1,000 increment2026 Rate and Fee Schedule (PDF), Demolition Permits table
Demolition/Removal $500,001-$1,000,000Base fee plus $7.00 per $1,000 increment2026 Rate and Fee Schedule (PDF), Demolition Permits table
Engineering study (if required by City Administrator)Cost of study, in addition to demolition permit fee2026 Rate and Fee Schedule (PDF), Demolition Permits section, engineering-study clause

Commercial Tenant Improvement / Plan Review

Verified

Commercial properties and developments in Lamar requiring plan review use a dedicated Plan Review Application, separate from the general Building Permit Application, with a plan review fee of 65% of the total building permit fee when submittal documents are required under (IBC) Section 106.

Verified 2026-07-06 · Source

Requirements

  • Plan Review Application (separate from the standard Building Permit Application) required for commercial properties and developments
  • Building Permit Application also required for the underlying construction work
  • Plan review fee (65% of building permit fee) applies when submittal documents are required under Section 106
  • City of Lamar Contractor's License required for all contractors performing the work
  • Asbestos certification per C.R.S. 25-7 et seq. required on the Building Permit Application

Required documents

  • RequiredPlan Review ApplicationCity of Lamar Community Development Department form for commercial properties and developments
  • RequiredBuilding Permit Application (2026)Required in addition to the Plan Review Application for the construction work itself

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule)$33.00 minimum, scaling per the valuation tiers in the 2026 Rate and Fee Schedule2026 Rate and Fee Schedule, Ordinance #1052
Plan Review Fee65% of the total Building Permit FeeCharged when submittal documents are required under (IBC) Section 106
Additional plan review (changes/additions/revisions)$65.00 per hour2026 Rate and Fee Schedule (PDF), Building Permits section, "Additional plan review required by changes, additions or revisions to plans" line
Use of Outside Consultants for InspectionCost + 10%2026 Rate and Fee Schedule (PDF), Building Permits section, "Use of Outside Consultants for Inspection" line

Deck / Covered Patio Permit

Verified

Decks and covered patios are structural additions requiring a Building Permit in Lamar under LMC Sec. 6-2; there is no separate deck-specific fee line item published, so these are billed under the general valuation-based Building Permit Fee schedule, alongside related accessory-structure fee items the City does publish separately (free-standing carports, pre-fab sheds, temporary construction sheds).

Verified 2026-07-23 · Source

Requirements

  • Building Permit Application (2026 form) required per LMC Sec. 6-2 for any structure erected or added to a property
  • Must comply with the City's Climatic and Geographic Design Criteria (30 psf ground snow load, 110 mph wind speed, 36-inch frost depth) for structural design
  • City of Lamar Contractor's License required if performed by a contractor rather than the owner

Required documents

  • RequiredBuilding Permit Application (2026) — deck/patio/accessory structure scopeSame general-purpose form used for all building permit types

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same schedule as new construction)$33.00 minimum, scaling per the valuation tiers in the 2026 Rate and Fee ScheduleNo separate flat deck/patio fee is published; billed under the general valuation-based Building Permit Fee schedule.
Free Standing Carport — 12'x20' or smaller$53.00Related accessory-structure fee explicitly published; included for cross-reference, not a deck fee itself
Free Standing Carport — larger than 12'x20'$131.002026 Rate and Fee Schedule (PDF), Miscellaneous Fees section, Free Standing Carports subsection
Pre Fab Sheds$53.002026 Rate and Fee Schedule (PDF), Miscellaneous Fees section
Temporary Construction Sheds$53.002026 Rate and Fee Schedule (PDF), Miscellaneous Fees section

Sign Permit

No dedicated sign-permit page, standalone application, or sign-specific fee schedule was located on the City of Lamar Building Department's page as of the last verification. The Building Department's page confirms a building permit is required 'except when the type of work is considered to be aesthetic (e.g. painting, changing carpet)' — a sign installation is not explicitly addressed by that carve-out, suggesting it likely falls under the general Building Permit process, but this was not independently confirmed.

Reviewed 2026-08-14 · Source

Requirements

  • No dedicated sign-permit page, standalone application, or fee schedule was located on the City's Building Department page as of the last verification
  • The City's general building-permit exemption covers only 'aesthetic' work (e.g., painting, changing carpet) — a sign installation is not listed among that carve-out
  • Contact the City of Lamar Building Department (719-336-2085, buildingcodes@ci.lamar.co.us) to confirm whether a sign permit is required for a specific sign and what standards apply

Required documents

  • RequiredSign Permit / Building Permit ApplicationContact the Building Department to confirm the current application form and requirements

Fee schedule

Fee typeAmountNotes
Sign Permit FeeNot published as a numeric figure on the City's websiteThe Building Department page references a 'Rates and Fee Schedule' without listing amounts inline. Contact the Building Department (719-336-2085) for a current fee quote.

Fire Sprinkler / Fire Alarm System Permit

Fire protection for Lamar is provided by the City's own Lamar Fire Department (719-336-4321), which per its own page 'conducts an average of 450 public occupancy inspections annually' as part of its fire prevention program. No dedicated fire-sprinkler/alarm permit application, fee schedule, or review-timeline figure distinct from the general Building Department permit process was located on the City's website as of the last verification.

Reviewed 2026-08-14 · Source

Requirements

  • Fire protection and fire prevention inspections for Lamar are provided by the City's own Lamar Fire Department, which conducts an average of 450 public occupancy inspections annually
  • No dedicated fire-sprinkler/alarm permit application, fee schedule, or review-timeline figure was located on the City's website as of the last verification
  • Contact the Lamar Fire Department (719-336-4321) or the Building Department (719-336-2085) to confirm current fire-protection-system permitting procedures for a specific project

Required documents

  • RequiredFire Sprinkler/Alarm System PlansContact the Lamar Fire Department or Building Department to confirm current submittal requirements

Fee schedule

Fee typeAmountNotes
Fire Sprinkler/Alarm Plan Review & Permit FeeNot published on the City's website as of the last verificationContact the Lamar Fire Department (719-336-4321) or Building Department (719-336-2085) for a current fee quote

Change of Use / Change of Occupancy

Verified

No standalone 'Change of Use' or 'Change of Occupancy' permit application distinct from the general building-permit process was located on the City of Lamar Building Department's page as of the last verification. Notably, for properties located on US Highway 287 or US Highway 50, the Building Department page confirms a separate State Access Permit through the Colorado Department of Transportation (CDOT) is required for new construction OR a change in occupancy/use — a real, directly-quoted requirement distinct from the general City building-permit process.

Verified 2026-08-14 · Source

Requirements

  • No standalone change-of-use or change-of-occupancy application distinct from the general City Building Permit process was found published on the City's website as of the last verification
  • CONFIRMED via the Building Department's own page: properties on US Highway 287 or US Highway 50 require a separate State Access Permit through CDOT for new construction or a change in occupancy/use
  • Processed, if at all, through the City's general Building Permit process; contact the Building Department (719-336-2085) to confirm requirements for a specific change-of-use project

Required documents

  • RequiredBuilding Permit ApplicationStandard City building permit application; contact the Building Department to confirm current requirements for a change-of-use project
  • OptionalCDOT State Access PermitRequired in addition to any City permit for properties located on US Highway 287 or US Highway 50, for new construction or a change in occupancy/use

Fee schedule

Fee typeAmountNotes
Building Permit Fee (if construction accompanies the change)Not published as a standalone change-of-use fee lineThe Building Department page references a 'Rates and Fee Schedule' without listing amounts inline. Contact the Building Department (719-336-2085) for a current fee quote.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lamar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-08-14)View current record →All versions →

Permalink: /colorado/prowers-county/lamar/as-of/2026-08-20/

Snapshot date: 2026-08-20

Commit: 4e9b2b0

Reproducible from PermitBase’s version-controlled dataset, commit 4e9b2b0.