Version history — Lamar, Colorado
This is PermitBase’s own verified record for Lamar, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Lamar’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-20Current record
- 2026-08-14Superseded
- Lamar, Colorado — Sign Permit record added
- Lamar, Colorado — Fire Sprinkler / Fire Alarm System Permit record added
- Lamar, Colorado — Change of Use / Change of Occupancy record added
- 2026-07-20Superseded
- Lamar, Colorado — Rooftop Solar / Photovoltaic Permit fee record added: Alternate energy equipment permit fee ($150.00 maximum)
- Lamar, Colorado — Rooftop Solar / Photovoltaic Permit fee record removed: Alternate energy equipment permit fee (state cap)
- Lamar, Colorado — EV Charger / EVSE Permit record added
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Lamar began