Lamar building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Lamar, Colorado.

Last verified 2026-07-23 · Source · Embed this page’s badge · Version history

Building department

Address
Lamar Community Resource & Senior Center, 405/407 E. Olive, Lamar, CO (mailing: 102 E Parmenter St, Lamar, CO 81052)
Phone
719-336-2085
Office hours
Monday-Friday, 8:00 AM - 4:00 PM. Inspections conducted Monday-Friday between 9:00 AM and 3:00 PM; 24 hours advance notice required by calling 719-336-2085. Staff: Tony Gratta (Building Inspector) and Joy Dashner (Assistant Building Inspector), both reachable at 719-336-2085 / buildingcodes@ci.lamar.co.us.

Inspection guide

See how inspections work in Lamar — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC)
  • 2018 International Residential Code (IRC)
  • 2018 International Mechanical Code (IMC) (listed on the City's page as '2018 Mechanical Code')
  • 2018 International Plumbing Code (IPC)
  • 2018 International Fire Code (IFC)
  • 2018 International Fuel Gas Code (IFGC)
  • 2018 International Existing Building Code (IEBC)
  • 2018 International Energy Conservation Code (IECC) (listed on the City's page as '2018 International Energy Code')
  • 2015 International Energy Conservation Code (listed separately on the City's page as '2015 Energy Conservation Code' alongside the 2018 IECC entry — the page lists both without clarifying which governs; treated here as a verbatim-as-published discrepancy rather than resolved by assumption)
  • 2015 International Swimming Pool and Spa Code (ISPSC)
  • 2010 Americans with Disabilities Act (ADA) standards
  • 2006 International Property Maintenance Code (IPMC)
  • Codes are enforced within Lamar city limits AND for any properties connected/connecting to City water/wastewater within a 3-mile radius of the City limits, per the Building Department's own scoping statement.
  • HB22-1362 (Colorado Building Greenhouse Gas Emissions Act) compliance note: Lamar's own Building Department webpage lists the 2018 IECC (plus a separately-listed 2015 Energy Conservation Code entry) as the currently enforced energy code, which pre-dates the 2021 IECC-family editions that HB22-1362 nominally directs Colorado jurisdictions to adopt on a phased statewide timeline. HB22-1362's own statutory carve-out mechanism is a 'rural county' exemption (grant-application-contingent, allowing continued use of one of the 3 most recent IECC editions in lieu of the model low-energy/electric-ready codes) that applies at the COUNTY level, not a flat municipal population threshold — Prowers County (est. population ~11,900-12,300) would plausibly qualify as rural under this mechanism, but the City's own webpage does not cite HB22-1362, a grant application, or any rural-county determination as the basis for its 2018 IECC adoption. This is reported as an honest as-published discrepancy, not resolved by assumption; confidence on code-currency is 'partial' for this reason alone (the codes-adopted list itself, as literally published by the City, is verified).

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
0units

0 buildings · $0 valuation

Trailing 12 months
1units

12 of 12 months reported · #61 in Colorado coverage by units

Year to date (2026 YTD through 2026-05)
0units

0 buildings · $0 valuation

5 month(s) reported to Census

Full year 2025
3units

3 buildings · $706,178 valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Electrical permits in Lamar are handled ENTIRELY by the State of Colorado DORA State Electrical Board (dora.colorado.gov/professions/electrical) — the City of Lamar Building Department does not issue electrical permits or conduct electrical inspections at all. This is stated directly on the Building Department's webpage and printed on the City's own 2026 Building Permit Application form.
  • Plumbing is a split arrangement: the City of Lamar Building Department itself issues plumbing permits and publishes a detailed plumbing fee table (sewer connections, water lines, backflow devices, etc.), but interior plumbing and gas-line INSPECTIONS are conducted by the Colorado DORA State Plumbing Board, not City staff. RESOLVED 2026-07-23: the ordinance basis for this split is LMC Sec. 6-128(a)(2), a local amendment to IPC Section 101.2 (Scope) reading 'All water, gas and sewer lines running from the service line to any building will be inspected before being covered' — the City retains and fee-schedules that exterior service-line-to-building scope, while DORA's State Plumbing Board retains interior plumbing/gas-piping inspection authority under C.R.S. 12-155-120. Confirm with the Building Department (719-336-2085) for edge cases, but the general boundary is now sourced rather than inferred.
  • Lamar's Building Department enforces its adopted codes not just within city limits but also for any properties connected/connecting to City water or wastewater within a 3-mile radius of the city limits — a broader-than-typical scoping statement worth checking for near-boundary parcels.
  • The City's own Building Codes Enforced list shows both a '2018 International Energy Code' entry AND a separately listed '2015 Energy Conservation Code' entry without clarifying which supersedes the other — this file reports both verbatim as an honest as-published discrepancy rather than resolving it by assumption. Neither matches the 2021-IECC-family editions that HB22-1362 nominally directs Colorado jurisdictions toward on a phased statewide timeline; HB22-1362's actual statutory carve-out (a grant-contingent 'rural county' exemption) operates at the county level, not via a flat municipal population threshold, and the City's own materials do not cite this exemption as their basis for using the 2018/2015 IECC editions.
  • Lamar's population (approximately 7,600-7,700 per recent Census estimates) is well above any typical small-municipality carve-out threshold discussed in Colorado energy-code commentary — this is a genuinely developed, dedicated Building Department program (two named building inspectors, itemized mechanical/plumbing/demolition fee tables), not a minimal-capacity small-town office, consistent with Lamar's role as the largest city and regional hub on Colorado's Eastern Plains covered in this batch.
  • Commencing work without a valid permit carries a penalty of 2x the building permit fee that would have been required — confirmed directly on the 2026 Rate and Fee Schedule.
  • Alternate energy equipment (e.g., rooftop solar) permit fees are capped at $150.00 by state regulation, per the City's own fee schedule — do not accept a higher fee calculated under the general mechanical or building valuation tables for this equipment category.
  • Owners are responsible for a 3% use tax on construction materials not already subject to sales tax collection, due upon completion of construction — stated directly on the City's 2026 Building Permit Application, separate from the building permit fee itself.
  • Commercial properties and developments require a separate Plan Review Application in addition to the standard Building Permit Application, and trigger a 65% plan-review fee surcharge (of the building permit fee) when Section 106 submittal documents are required.
  • Properties on US Hwy 287 (Main Street) or US Hwy 50 (East Olive/Main) require a separate CDOT State Access Permit for new construction or a change in occupancy/use — this is a state permit, not issued by the City.
  • The City of Lamar does not publish a numeric plan-review or permit-issuance turnaround anywhere on its Building Department webpage, its 2026 Building Permit Application, its Plan Review Application, or its 2026 Rate and Fee Schedule — checked all four directly. Colorado is home-rule with no statewide review-time clock; every permitType in this file is honestly null/unverified with a documented chase trail rather than an invented figure.
  • The Lamar Municipal Code is hosted on Municode Library, but the platform serves the code via a JavaScript single-page application that returned no static text to either a standard fetch or a full-browser-header curl retrieval (only the ~6KB Angular app shell was returned). LMC Sec. 6-2 and Sec. 6-5 citations in this file come from the City's own Building Department webpage, which quotes them directly, not from Municode itself — a genuine access limitation on the ordinance's full text, disclosed rather than papered over.
  • Contractors need a City of Lamar Contractor's License (quarterly-tiered annual fee by trade class: Minor Sub-contractor, Major Sub-contractor, General Contractor Builder, Electrical, Plumbing) in addition to any state DORA trade licensure required for electrical/plumbing work — proof of $100,000 liability insurance (City of Lamar as Certificate Holder) and workers' compensation (or a filed Opt-Out) are required at application.

Comparable nearby cities

Center
11 shared permit typesBoth on the 2018 International Plumbing Code (IPC)
Compare fees →
Keenesburg
11 shared permit typesBoth on the 2018 International Residential Code (IRC)
Compare fees →
La Salle
10 shared permit typesBoth on the 2018 International Residential Code (IRC)
Compare fees →