Demolition Permit in Lamar, Colorado

Required for demolition or removal of structures in Lamar. Uses a dedicated valuation-based fee schedule set by Resolution 16-10-03, distinct from the general Building Permit valuation table.

Verified 2026-07-06 · Source

When you need this permit

  • Building Permit Application (2026 form), Demolition scope, filed with the City of Lamar Building Department
  • Fee schedule set by Resolution 16-10-03, based on demolition/removal valuation tiers
  • If the City Administrator determines an engineering study must be performed before or during demolition to preserve public safety, the cost of that study is charged in addition to the demolition permit fee
  • Asbestos certification (per C.R.S. 25-7 et seq.) on the Building Permit Application applies to demolition scope as well, and the City's webpage separately flags that CDPHE may require an asbestos inspection before renovation or demolition of a building of any age

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition/Removal $1-$500Resolution 16-10-03, 2026 Rate and Fee Schedule
$33.00 per permit
Demolition/Removal $501-$2,000
Base fee plus $5.00 per $1,000 increment
Demolition/Removal $2,001-$25,000
Base fee plus $20.00 per $1,000 increment
Demolition/Removal $25,001-$50,000
Base fee plus $15.00 per $1,000 increment
Demolition/Removal $50,001-$100,000
Base fee plus $10.00 per $1,000 increment
Demolition/Removal $100,001-$500,000
Base fee plus $8.00 per $1,000 increment
Demolition/Removal $500,001-$1,000,000
Base fee plus $7.00 per $1,000 increment
Engineering study (if required by City Administrator)
Cost of study, in addition to demolition permit fee

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Lamar?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (demolition complete)

    Site cleared and safe per approved demolition permit

See the full Lamar inspection guide — scheduling & re-inspection fees →

Tips

  • Demolition permits in Lamar use their own dedicated fee table (Resolution 16-10-03) — do not assume the general Building Permit valuation table applies.
  • Buildings of any age can contain asbestos-containing materials per CDPHE guidance the City links to directly — factor in an asbestos inspection timeline before scheduling demolition.

Frequently asked questions

Lamar requires a demolition permit for: Building Permit Application (2026 form), Demolition scope, filed with the City of Lamar Building Department; Fee schedule set by Resolution 16-10-03, based on demolition/removal valuation tiers; If the City Administrator determines an engineering study must be performed before or during demolition to preserve public safety, the cost of that study is charged in addition to the demolition permit fee; Asbestos certification (per C.R.S. 25-7 et seq.) on the Building Permit Application applies to demolition scope as well, and the City's webpage separately flags that CDPHE may require an asbestos inspection before renovation or demolition of a building of any age. If your project isn't listed, confirm with City of Lamar Building Department at 719-336-2085 before starting work.

Yes. Demolition permit fees in Lamar are set by Resolution 16-10-03 and use their own valuation-tiered table, distinct from the general Building Permit Fee schedule used for new construction and additions.

Lamar does not publish a plan-review timeline for this permit. Contact City of Lamar Building Department at 719-336-2085 for current turnaround.

You'll need: Building Permit Application (2026) — Demolition scope. See the required-documents checklist on this page for details on each.

Lamar requires 1 inspection(s) for a demolition permit, in order: Final Inspection (demolition complete). Schedule each through City of Lamar Building Department (719-336-2085).

Apply through City of Lamar Building Department at Lamar Community Resource & Senior Center, 405/407 E. Olive, Lamar, CO (mailing: 102 E Parmenter St, Lamar, CO 81052). Phone: 719-336-2085, email: buildingcodes@ci.lamar.co.us. Office hours: Monday-Friday, 8:00 AM - 4:00 PM. Inspections conducted Monday-Friday between 9:00 AM and 3:00 PM; 24 hours advance notice required by calling 719-336-2085. Staff: Tony Gratta (Building Inspector) and Joy Dashner (Assistant Building Inspector), both reachable at 719-336-2085 / buildingcodes@ci.lamar.co.us.. Official information: https://ci.lamar.co.us/building-department.

Lamar, Colorado has adopted: 2018 International Building Code (IBC); 2018 International Residential Code (IRC); 2018 International Mechanical Code (IMC) (listed on the City's page as '2018 Mechanical Code'); 2018 International Plumbing Code (IPC); 2018 International Fire Code (IFC); 2018 International Fuel Gas Code (IFGC); 2018 International Existing Building Code (IEBC); 2018 International Energy Conservation Code (IECC) (listed on the City's page as '2018 International Energy Code'); 2015 International Energy Conservation Code (listed separately on the City's page as '2015 Energy Conservation Code' alongside the 2018 IECC entry — the page lists both without clarifying which governs; treated here as a verbatim-as-published discrepancy rather than resolved by assumption); 2015 International Swimming Pool and Spa Code (ISPSC); 2010 Americans with Disabilities Act (ADA) standards; 2006 International Property Maintenance Code (IPMC); Codes are enforced within Lamar city limits AND for any properties connected/connecting to City water/wastewater within a 3-mile radius of the City limits, per the Building Department's own scoping statement.; HB22-1362 (Colorado Building Greenhouse Gas Emissions Act) compliance note: Lamar's own Building Department webpage lists the 2018 IECC (plus a separately-listed 2015 Energy Conservation Code entry) as the currently enforced energy code, which pre-dates the 2021 IECC-family editions that HB22-1362 nominally directs Colorado jurisdictions to adopt on a phased statewide timeline. HB22-1362's own statutory carve-out mechanism is a 'rural county' exemption (grant-application-contingent, allowing continued use of one of the 3 most recent IECC editions in lieu of the model low-energy/electric-ready codes) that applies at the COUNTY level, not a flat municipal population threshold — Prowers County (est. population ~11,900-12,300) would plausibly qualify as rural under this mechanism, but the City's own webpage does not cite HB22-1362, a grant application, or any rural-county determination as the basis for its 2018 IECC adoption. This is reported as an honest as-published discrepancy, not resolved by assumption; confidence on code-currency is 'partial' for this reason alone (the codes-adopted list itself, as literally published by the City, is verified).. Local amendments apply — see the Lamar overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lamar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.