Plumbing Permit in Lamar, Colorado
The City of Lamar Building Department issues its own Plumbing Permits (issuance, supplemental permits, building sewer, water line, backflow devices, etc., per the 2026 Rate and Fee Schedule Plumbing Fees table) governed by the 2018 International Plumbing Code as adopted. Interior plumbing and gas-line INSPECTIONS are conducted by the Colorado DORA State Plumbing Board, not City staff — a split arrangement distinct from the fully state-administered electrical permit type. RESOLVED 2026-07-23: the City's own codified local amendment to IPC Section 101.2 (Scope), LMC Sec. 6-128(a)(2), reads in full: 'All water, gas and sewer lines running from the service line to any building will be inspected before being covered' — this is the specific ordinance basis for the City-inspected/City-fee-scheduled scope (building sewer, new sewer line, new domestic water line, backflow devices, lawn sprinkler systems, etc., all itemized on the 2026 Rate and Fee Schedule). Interior plumbing and gas piping work INSIDE the building envelope remains DORA State Plumbing Board jurisdiction under C.R.S. 12-155-120(1)(a), which vests inspection authority in a state plumbing inspector except where 'the local entity ... conducts inspections and issues plumbing permits' — Lamar's own ordinance and fee schedule show the City has only taken over the exterior service-line-to-building scope, not full local certification, consistent with the City's own webpage statement that DORA (not the City) inspects interior plumbing and gas lines.
Verified 2026-07-23 · Source
When you need this permit
- Building Permit Application (2026 form), Plumbing Permit section, filed with the City of Lamar Building Department
- Governed by the 2018 IPC as adopted by the City, with local amendments codified at LMC Sec. 6-126 through 6-128
- LMC Sec. 6-128(a)(2) (local amendment to IPC Section 101.2, Scope): 'All water, gas and sewer lines running from the service line to any building will be inspected before being covered' — this is the City-inspected scope corresponding to the City's own Plumbing Fees table
- Interior plumbing and gas-line inspections (inside the building envelope) are conducted by the Colorado DORA State Plumbing Board (dora.colorado.gov/professions/plumbing) under C.R.S. 12-155-120, NOT City of Lamar Building Department inspectors, per the Building Department's own 'Related Agency Links' and 'Inspections' sections
- The City's own Building Permit Application form separately instructs: 'to apply for a plumbing permit, access the website at www.dora.colorado.gov/professions/plumbing' for the interior/gas-piping scope; the exterior service-line scope itemized on the City's own fee schedule is filed and inspected by the City directly per LMC Sec. 6-128(a)(2)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Interior Plumbing / Gas Line Inspection
Conducted by the Colorado DORA State Plumbing Board, not City of Lamar Building Department staff
See the full Lamar inspection guide — scheduling & re-inspection fees →
Tips
- Lamar's plumbing arrangement is a split model: the City itself issues and fee-schedules plumbing permits (sewer connections, water lines, backflow devices, etc.), but interior plumbing and gas-line INSPECTIONS are conducted by the Colorado DORA State Plumbing Board — confirm with the Building Department (719-336-2085) which inspections apply to your specific scope of work.
- Plumbing contractors need a City of Lamar Contractor's License (quarterly-tiered fee) in addition to any state DORA plumbing licensure. Contractor
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lamar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lamar
Plumbing Permit in other cities
Compare plumbing permit fees across Colorado →
Look up this fee in a different city →