Commercial properties and developments in Lamar requiring plan review use a dedicated Plan Review Application, separate from the general Building Permit Application, with a plan review fee of 65% of the total building permit fee when submittal documents are required under (IBC) Section 106.

Verified 2026-07-06 · Source

When you need this permit

  • Plan Review Application (separate from the standard Building Permit Application) required for commercial properties and developments
  • Building Permit Application also required for the underlying construction work
  • Plan review fee (65% of building permit fee) applies when submittal documents are required under Section 106
  • City of Lamar Contractor's License required for all contractors performing the work Contractor
  • Asbestos certification per C.R.S. 25-7 et seq. required on the Building Permit Application

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (same valuation-based schedule)2026 Rate and Fee Schedule, Ordinance #1052
$33.00 minimum, scaling per the valuation tiers in the 2026 Rate and Fee Schedule
Plan Review FeeCharged when submittal documents are required under (IBC) Section 106
65% of the total Building Permit Fee
Additional plan review (changes/additions/revisions)
$65.00 per hour
Use of Outside Consultants for Inspection
Cost + 10%

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Plan Review permit actually take in Lamar?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Inspections (per trade, as applicable)

    Building/mechanical rough-ins before concealment; electrical/interior plumbing inspected separately by Colorado DORA

  2. 2

    Final Inspection

    All City-inspected work complete per approved plans and adopted codes

See the full Lamar inspection guide — scheduling & re-inspection fees →

Tips

  • Commercial and development projects need BOTH a Plan Review Application and a Building Permit Application in Lamar — the Plan Review Application alone does not authorize construction.
  • Budget the 65% plan review fee surcharge into commercial project costs in addition to the base building permit fee.

Frequently asked questions

Lamar requires a commercial tenant improvement / plan review permit for: Plan Review Application (separate from the standard Building Permit Application) required for commercial properties and developments; Building Permit Application also required for the underlying construction work; Plan review fee (65% of building permit fee) applies when submittal documents are required under Section 106; City of Lamar Contractor's License required for all contractors performing the work; Asbestos certification per C.R.S. 25-7 et seq. required on the Building Permit Application. If your project isn't listed, confirm with City of Lamar Building Department at 719-336-2085 before starting work.

In Lamar, the published Building Permit Fee (same valuation-based schedule) is: $33.00 minimum, scaling per the valuation tiers in the 2026 Rate and Fee Schedule. Additional published fees: Plan Review Fee — 65% of the total Building Permit Fee; Additional plan review (changes/additions/revisions) — $65.00 per hour; Use of Outside Consultants for Inspection — Cost + 10%. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Lamar does not publish a plan-review timeline for this permit. Contact City of Lamar Building Department at 719-336-2085 for current turnaround.

You'll need: Plan Review Application; Building Permit Application (2026). See the required-documents checklist on this page for details on each.

Lamar requires 2 inspection(s) for a commercial tenant improvement / plan review permit, in order: Rough Inspections (per trade, as applicable), Final Inspection. Schedule each through City of Lamar Building Department (719-336-2085).

Apply through City of Lamar Building Department at Lamar Community Resource & Senior Center, 405/407 E. Olive, Lamar, CO (mailing: 102 E Parmenter St, Lamar, CO 81052). Phone: 719-336-2085, email: buildingcodes@ci.lamar.co.us. Office hours: Monday-Friday, 8:00 AM - 4:00 PM. Inspections conducted Monday-Friday between 9:00 AM and 3:00 PM; 24 hours advance notice required by calling 719-336-2085. Staff: Tony Gratta (Building Inspector) and Joy Dashner (Assistant Building Inspector), both reachable at 719-336-2085 / buildingcodes@ci.lamar.co.us.. Official information: https://ci.lamar.co.us/building-department.

Lamar, Colorado has adopted: 2018 International Building Code (IBC); 2018 International Residential Code (IRC); 2018 International Mechanical Code (IMC) (listed on the City's page as '2018 Mechanical Code'); 2018 International Plumbing Code (IPC); 2018 International Fire Code (IFC); 2018 International Fuel Gas Code (IFGC); 2018 International Existing Building Code (IEBC); 2018 International Energy Conservation Code (IECC) (listed on the City's page as '2018 International Energy Code'); 2015 International Energy Conservation Code (listed separately on the City's page as '2015 Energy Conservation Code' alongside the 2018 IECC entry — the page lists both without clarifying which governs; treated here as a verbatim-as-published discrepancy rather than resolved by assumption); 2015 International Swimming Pool and Spa Code (ISPSC); 2010 Americans with Disabilities Act (ADA) standards; 2006 International Property Maintenance Code (IPMC); Codes are enforced within Lamar city limits AND for any properties connected/connecting to City water/wastewater within a 3-mile radius of the City limits, per the Building Department's own scoping statement.; HB22-1362 (Colorado Building Greenhouse Gas Emissions Act) compliance note: Lamar's own Building Department webpage lists the 2018 IECC (plus a separately-listed 2015 Energy Conservation Code entry) as the currently enforced energy code, which pre-dates the 2021 IECC-family editions that HB22-1362 nominally directs Colorado jurisdictions to adopt on a phased statewide timeline. HB22-1362's own statutory carve-out mechanism is a 'rural county' exemption (grant-application-contingent, allowing continued use of one of the 3 most recent IECC editions in lieu of the model low-energy/electric-ready codes) that applies at the COUNTY level, not a flat municipal population threshold — Prowers County (est. population ~11,900-12,300) would plausibly qualify as rural under this mechanism, but the City's own webpage does not cite HB22-1362, a grant application, or any rural-county determination as the basis for its 2018 IECC adoption. This is reported as an honest as-published discrepancy, not resolved by assumption; confidence on code-currency is 'partial' for this reason alone (the codes-adopted list itself, as literally published by the City, is verified).. Local amendments apply — see the Lamar overview page for the full list.

Yes. Commercial properties and developments use a distinct Plan Review Application in addition to the standard Building Permit Application, and are subject to a plan review fee of 65% of the building permit fee when Section 106 submittal documents are required.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lamar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Lamar.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.