Change of Use / Change of Occupancy in Lamar, Colorado

No standalone 'Change of Use' or 'Change of Occupancy' permit application distinct from the general building-permit process was located on the City of Lamar Building Department's page as of this review. Notably, for properties located on US Highway 287 or US Highway 50, the Building Department page confirms a separate State Access Permit through the Colorado Department of Transportation (CDOT) is required for new construction OR a change in occupancy/use — a real, directly-quoted requirement distinct from the general City building-permit process.

Verified 2026-08-14 · Source

When you need this permit

  • No standalone change-of-use or change-of-occupancy application distinct from the general City Building Permit process was found published on the City's website as of this review
  • CONFIRMED via the Building Department's own page: properties on US Highway 287 or US Highway 50 require a separate State Access Permit through CDOT for new construction or a change in occupancy/use
  • Processed, if at all, through the City's general Building Permit process; contact the Building Department (719-336-2085) to confirm requirements for a specific change-of-use project

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (if construction accompanies the change)The Building Department page references a 'Rates and Fee Schedule' without listing amounts inline. Contact the Building Department (719-336-2085) for a current fee quote.
Not published as a standalone change-of-use fee line

Review timeline

Plan review
Not published — contact the department

How long did your Change of Use / Change of Occupancy permit actually take in Lamar?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection / Occupancy

    Contact the Building Department to confirm inspection requirements for a change-of-use project

See the full Lamar inspection guide — scheduling & re-inspection fees →

Tips

  • If your property fronts US Highway 287 or US Highway 50, a change in occupancy/use triggers a separate CDOT State Access Permit in addition to whatever City process applies — this is a real, City-confirmed requirement, not a generic assumption.

Frequently asked questions

Lamar requires a change of use / change of occupancy permit for: No standalone change-of-use or change-of-occupancy application distinct from the general City Building Permit process was found published on the City's website as of this review; CONFIRMED via the Building Department's own page: properties on US Highway 287 or US Highway 50 require a separate State Access Permit through CDOT for new construction or a change in occupancy/use; Processed, if at all, through the City's general Building Permit process; contact the Building Department (719-336-2085) to confirm requirements for a specific change-of-use project. If your project isn't listed, confirm with City of Lamar Building Department at 719-336-2085 before starting work.

In Lamar, the published Building Permit Fee (if construction accompanies the change) is: Not published as a standalone change-of-use fee line. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Lamar does not publish a plan-review timeline for this permit. Contact City of Lamar Building Department at 719-336-2085 for current turnaround.

You'll need: Building Permit Application. Depending on your project, Lamar may also ask for: CDOT State Access Permit. See the required-documents checklist on this page for details on each.

Lamar requires 1 inspection(s) for a change of use / change of occupancy permit, in order: Final Inspection / Occupancy. Schedule each through City of Lamar Building Department (719-336-2085).

Apply through City of Lamar Building Department at Lamar Community Resource & Senior Center, 405/407 E. Olive, Lamar, CO (mailing: 102 E Parmenter St, Lamar, CO 81052). Phone: 719-336-2085, email: buildingcodes@ci.lamar.co.us. Office hours: Monday-Friday, 8:00 AM - 4:00 PM. Inspections conducted Monday-Friday between 9:00 AM and 3:00 PM; 24 hours advance notice required by calling 719-336-2085. Staff: Tony Gratta (Building Inspector) and Joy Dashner (Assistant Building Inspector), both reachable at 719-336-2085 / buildingcodes@ci.lamar.co.us.. Official information: https://ci.lamar.co.us/building-department.

Lamar, Colorado has adopted: 2018 International Building Code (IBC); 2018 International Residential Code (IRC); 2018 International Mechanical Code (IMC) (listed on the City's page as '2018 Mechanical Code'); 2018 International Plumbing Code (IPC); 2018 International Fire Code (IFC); 2018 International Fuel Gas Code (IFGC); 2018 International Existing Building Code (IEBC); 2018 International Energy Conservation Code (IECC) (listed on the City's page as '2018 International Energy Code'); 2015 International Energy Conservation Code (listed separately on the City's page as '2015 Energy Conservation Code' alongside the 2018 IECC entry — the page lists both without clarifying which governs; treated here as a verbatim-as-published discrepancy rather than resolved by assumption); 2015 International Swimming Pool and Spa Code (ISPSC); 2010 Americans with Disabilities Act (ADA) standards; 2006 International Property Maintenance Code (IPMC); Codes are enforced within Lamar city limits AND for any properties connected/connecting to City water/wastewater within a 3-mile radius of the City limits, per the Building Department's own scoping statement.; HB22-1362 (Colorado Building Greenhouse Gas Emissions Act) compliance note: Lamar's own Building Department webpage lists the 2018 IECC (plus a separately-listed 2015 Energy Conservation Code entry) as the currently enforced energy code, which pre-dates the 2021 IECC-family editions that HB22-1362 nominally directs Colorado jurisdictions to adopt on a phased statewide timeline. HB22-1362's own statutory carve-out mechanism is a 'rural county' exemption (grant-application-contingent, allowing continued use of one of the 3 most recent IECC editions in lieu of the model low-energy/electric-ready codes) that applies at the COUNTY level, not a flat municipal population threshold — Prowers County (est. population ~11,900-12,300) would plausibly qualify as rural under this mechanism, but the City's own webpage does not cite HB22-1362, a grant application, or any rural-county determination as the basis for its 2018 IECC adoption. This is reported as an honest as-published discrepancy, not resolved by assumption; confidence on code-currency is 'partial' for this reason alone (the codes-adopted list itself, as literally published by the City, is verified).. Local amendments apply — see the Lamar overview page for the full list.

No standalone change-of-use application distinct from the general Building Permit process was found published. However, properties on US Highway 287 or US Highway 50 require a separate CDOT State Access Permit for a change in occupancy/use. Contact the Building Department (719-336-2085) to confirm requirements for a specific project.

Sources & verification

Verified against official sources. Last reviewed 2026-08-14.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lamar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.