EV Charger / EVSE Permit in Lamar, Colorado
Electric vehicle charging equipment (EVSE) installation in the City of Lamar is an electrical installation, and the City of Lamar does NOT issue electrical permits or conduct electrical inspections itself — per the City's own Building Department webpage and its 2026 Building Permit Application form, electrical permits must be obtained directly from the State of Colorado Department of Regulatory Agencies (DORA), State Electrical Board, the same routing documented on this file's general Electrical Permit entry. The City's 2026 Rate and Fee Schedule (amended 1/12/2026), reviewed page-by-page in full, contains no electrical permit fee line item at all (consistent with the City not administering this permit type) and no distinct EV-charger/EVSE line item of any kind.
Verified 2026-07-20 · Source
When you need this permit
- Apply directly through the Colorado DORA State Electrical Board at dora.colorado.gov/professions/electrical — NOT through the City of Lamar Building Department
- The City's 2026 Building Permit Application form itself instructs applicants: 'To apply for an electrical permit, access the website at www.dora.colorado.gov/professions/electrical'
- Electrical inspections are conducted by DORA's State Electrical Board, not City of Lamar Building Department staff
- If the EVSE installation is paired with a City-permitted mounting/structural scope (e.g., a carport or accessory structure housing the charger), that scope would separately require a City Building Permit Application, but the electrical/EVSE circuit itself remains DORA's jurisdiction
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection
EVSE circuit and NEC Article 625 compliance verified by the Colorado DORA State Electrical Board, not the City of Lamar Building Department
See the full Lamar inspection guide — scheduling & re-inspection fees →
Tips
- Do not attempt to apply for an EV charger/electrical permit through the City of Lamar Building Department — it will direct you to the Colorado DORA State Electrical Board (dora.colorado.gov/professions/electrical), the same as any other electrical work in Lamar.
- Unlike the City's Alternate Energy (solar) permit, which has its own $150 state-capped City fee line for the structural/mounting scope, EV chargers have no analogous City fee line at all — the entire EVSE scope routes to DORA.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lamar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lamar
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →