Residential Building Permit (New Construction) in Lamar, Colorado

Required for new construction of single-family homes and other residential structures within Lamar city limits and the 3-mile water/wastewater-connection radius. Reviewed under the 2018 IBC/IRC as adopted, plus the City's published Climatic and Geographic Design Criteria (30 psf ground snow load, 110 mph wind speed, 36-inch frost depth). Issued by the City of Lamar Building Department using the City's own Building Permit Application form; electrical and plumbing work under the same project are permitted separately and directly through the State of Colorado DORA boards, not through this application.

Verified 2026-07-06 · Source

When you need this permit

  • Building Permit Application (2026 form) completed by the property owner, licensed contractor, or an authorized representative, describing project information, applicant, property owner, and contractor(s) Contractor
  • Plans/work must comply with the 2018 IBC/IRC as adopted and the City's Climatic and Geographic Design Criteria: 30 psf ground snow load, 110 mph wind speed, Seismic Design Category B, 36-inch minimum frost depth, ice barrier underlayment required
  • Asbestos certification section on the permit application must be completed per C.R.S. 25-7 et seq.
  • Electrical and plumbing/gas-line permits and inspections are NOT part of this application — apply directly through Colorado DORA (State Electrical Board and State Plumbing Board)
  • Properties on US Hwy 287 (Main Street) or US Hwy 50 (East Olive/Main) require a separate CDOT State Access Permit for new construction
  • All contractors performing the work must hold a current City of Lamar Contractor's License (liability insurance $100,000 minimum, workers' compensation or Opt-Out documentation, paid license fee, paid Business/Sales Tax license) Contractor
  • Permit expires if work has not begun within 90 days of issuance (LMC Sec. 6-5(a)), or if work has not been substantially completed within two years of issuance (LMC Sec. 6-5(b))
  • Owner responsible for 3% use tax on construction materials at project completion, per the City's Building Permit Application

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation $1-$5002026 Rate and Fee Schedule, authorized by Ordinance #1052
$33.00
Building Permit Fee — valuation $501-$2,000
$33.00 plus $5.00 per additional $100 increment
Building Permit Fee — valuation $2,001-$25,000
Base fee plus $20.00 per additional $1,000 increment
Building Permit Fee — valuation $25,001-$50,000
Base fee plus $15.00 per additional $1,000 increment
Building Permit Fee — valuation $50,001-$100,000
Base fee plus $10.00 per additional $1,000 increment
Building Permit Fee — valuation $100,001-$500,000
Base fee plus $8.00 per additional $1,000 increment
Building Permit Fee — valuation $500,001-$1,000,000
Base fee plus $7.00 per additional $1,000 increment
Building Permit Fee — valuation $1,000,001 and up
Base fee plus $7.00 per additional $1,000 increment
Plan Review FeeCharged in addition to the building permit fee when submittal documents are required under (IBC) Section 106
65% of the total Building Permit Fee
Use TaxPer the City's Building Permit Application; owed by the project owner upon completion of construction
3% of construction materials value not already subject to sales tax collection
Commencing work without a valid permit (penalty)
2x the cost of the Building Permit that would have been required

Review timeline

Plan review
Not published — contact the department

How long did your Residential Building Permit (New Construction) permit actually take in Lamar?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Before concrete pour, per 36-inch minimum frost depth; scheduled 24 hours in advance, Monday-Friday 9:00 AM-3:00 PM

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Final Inspection (Building)

    All Building Department-inspected work complete per approved plans and adopted codes. Electrical, interior plumbing, and gas-line inspections are separately conducted by Colorado DORA, not the City.

See the full Lamar inspection guide — scheduling & re-inspection fees →

Tips

  • Electrical and plumbing work on a new home is NOT inspected by the City of Lamar — apply for those permits and inspections directly through the Colorado DORA State Electrical Board and State Plumbing Board websites, separate from the City's Building Permit Application.
  • Lamar's Climatic and Geographic Design Criteria (30 psf ground snow load, 110 mph wind speed, 36-inch frost depth, Seismic Design Category B, ice barrier underlayment required) should be confirmed with your design professional before finalizing structural plans.
  • Budget for the 3% use tax on construction materials, due at project completion, separate from the building permit and plan review fees.
  • Contractors need a current City of Lamar Contractor's License (annual, tiered quarterly fee schedule) in addition to any state trade licensing required for electrical/plumbing work performed under DORA. Contractor

Frequently asked questions

Lamar requires a residential building permit (new construction) for: Building Permit Application (2026 form) completed by the property owner, licensed contractor, or an authorized representative, describing project information, applicant, property owner, and contractor(s); Plans/work must comply with the 2018 IBC/IRC as adopted and the City's Climatic and Geographic Design Criteria: 30 psf ground snow load, 110 mph wind speed, Seismic Design Category B, 36-inch minimum frost depth, ice barrier underlayment required; Asbestos certification section on the permit application must be completed per C.R.S. 25-7 et seq.; Electrical and plumbing/gas-line permits and inspections are NOT part of this application — apply directly through Colorado DORA (State Electrical Board and State Plumbing Board); Properties on US Hwy 287 (Main Street) or US Hwy 50 (East Olive/Main) require a separate CDOT State Access Permit for new construction; All contractors performing the work must hold a current City of Lamar Contractor's License (liability insurance $100,000 minimum, workers' compensation or Opt-Out documentation, paid license fee, paid Business/Sales Tax license); Permit expires if work has not begun within 90 days of issuance (LMC Sec. 6-5(a)), or if work has not been substantially completed within two years of issuance (LMC Sec. 6-5(b)); Owner responsible for 3% use tax on construction materials at project completion, per the City's Building Permit Application. If your project isn't listed, confirm with City of Lamar Building Department at 719-336-2085 before starting work.

In Lamar, the published Building Permit Fee — valuation $1-$500 is: $33.00. Additional published fees: Building Permit Fee — valuation $501-$2,000 — $33.00 plus $5.00 per additional $100 increment; Building Permit Fee — valuation $2,001-$25,000 — Base fee plus $20.00 per additional $1,000 increment; Building Permit Fee — valuation $25,001-$50,000 — Base fee plus $15.00 per additional $1,000 increment; Building Permit Fee — valuation $50,001-$100,000 — Base fee plus $10.00 per additional $1,000 increment; Building Permit Fee — valuation $100,001-$500,000 — Base fee plus $8.00 per additional $1,000 increment; Building Permit Fee — valuation $500,001-$1,000,000 — Base fee plus $7.00 per additional $1,000 increment; Building Permit Fee — valuation $1,000,001 and up — Base fee plus $7.00 per additional $1,000 increment; Plan Review Fee — 65% of the total Building Permit Fee; Use Tax — 3% of construction materials value not already subject to sales tax collection; Commencing work without a valid permit (penalty) — 2x the cost of the Building Permit that would have been required. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

The City of Lamar does not publish a specific numeric review-time commitment for building permits. Colorado is a home-rule state with no statewide review-time statute, and Lamar's Building Department webpage, permit application, and fee schedule do not state an SLA for this permit type.

You'll need: Building Permit Application (2026); City of Lamar Contractor's License. Depending on your project, Lamar may also ask for: Plan Review Application (for commercial properties and developments). See the required-documents checklist on this page for details on each.

Lamar requires 3 inspection(s) for a residential building permit (new construction), in order: Foundation, Framing, Final Inspection (Building). Schedule each through City of Lamar Building Department (719-336-2085).

Apply through City of Lamar Building Department at Lamar Community Resource & Senior Center, 405/407 E. Olive, Lamar, CO (mailing: 102 E Parmenter St, Lamar, CO 81052). Phone: 719-336-2085, email: buildingcodes@ci.lamar.co.us. Office hours: Monday-Friday, 8:00 AM - 4:00 PM. Inspections conducted Monday-Friday between 9:00 AM and 3:00 PM; 24 hours advance notice required by calling 719-336-2085. Staff: Tony Gratta (Building Inspector) and Joy Dashner (Assistant Building Inspector), both reachable at 719-336-2085 / buildingcodes@ci.lamar.co.us.. Official information: https://ci.lamar.co.us/building-department.

Lamar, Colorado has adopted: 2018 International Building Code (IBC); 2018 International Residential Code (IRC); 2018 International Mechanical Code (IMC) (listed on the City's page as '2018 Mechanical Code'); 2018 International Plumbing Code (IPC); 2018 International Fire Code (IFC); 2018 International Fuel Gas Code (IFGC); 2018 International Existing Building Code (IEBC); 2018 International Energy Conservation Code (IECC) (listed on the City's page as '2018 International Energy Code'); 2015 International Energy Conservation Code (listed separately on the City's page as '2015 Energy Conservation Code' alongside the 2018 IECC entry — the page lists both without clarifying which governs; treated here as a verbatim-as-published discrepancy rather than resolved by assumption); 2015 International Swimming Pool and Spa Code (ISPSC); 2010 Americans with Disabilities Act (ADA) standards; 2006 International Property Maintenance Code (IPMC); Codes are enforced within Lamar city limits AND for any properties connected/connecting to City water/wastewater within a 3-mile radius of the City limits, per the Building Department's own scoping statement.; HB22-1362 (Colorado Building Greenhouse Gas Emissions Act) compliance note: Lamar's own Building Department webpage lists the 2018 IECC (plus a separately-listed 2015 Energy Conservation Code entry) as the currently enforced energy code, which pre-dates the 2021 IECC-family editions that HB22-1362 nominally directs Colorado jurisdictions to adopt on a phased statewide timeline. HB22-1362's own statutory carve-out mechanism is a 'rural county' exemption (grant-application-contingent, allowing continued use of one of the 3 most recent IECC editions in lieu of the model low-energy/electric-ready codes) that applies at the COUNTY level, not a flat municipal population threshold — Prowers County (est. population ~11,900-12,300) would plausibly qualify as rural under this mechanism, but the City's own webpage does not cite HB22-1362, a grant application, or any rural-county determination as the basis for its 2018 IECC adoption. This is reported as an honest as-published discrepancy, not resolved by assumption; confidence on code-currency is 'partial' for this reason alone (the codes-adopted list itself, as literally published by the City, is verified).. Local amendments apply — see the Lamar overview page for the full list.

The City of Lamar Building Department (405/407 E. Olive, Lamar, CO; mailing address 102 E Parmenter St) issues building, mechanical, demolition, and plumbing-related permits within city limits and for properties connected to City water/wastewater within a 3-mile radius. Electrical and interior plumbing/gas-line permits and inspections are handled directly by the State of Colorado DORA boards, not the City.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lamar building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.