Center building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Center, Colorado.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
294 S. Worth Street, Center, CO 81125
Phone
(719) 754-3497
Office hours
Monday-Thursday 7:00 AM - 5:00 PM; Friday 8:00 AM - 1:00 PM; Saturday-Sunday Closed. Fax (719) 754-3379.

Inspection guide

See how inspections work in Center — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC) and International Residential Code (IRC) — per the Town of Center's own Building Permit Application / Fee Schedule document ('CURRENT (2018 Codes)', referencing https://codes.iccsafe.org/codes/colorado)
  • 2018 International Plumbing Code (IPC)
  • 2018 International Mechanical Code (IMC)
  • 2018 International Fire Code (IFC)
  • 2018 International Energy Conservation Code (IECC) (listed on the Town's document as 'International Energy Commission Code')
  • 2018 International Fuel Gas Code (IFGC)
  • ICC/ANSI A117.1 Accessibility Code (ADA)
  • ASME Boiler and Pressure Vessel Code
  • Note on currency: the Town's Building Permit Application/Fee Schedule packet (the only currently-published code-adoption source found) explicitly labels these as the '2018 Codes' with no revision date visible on the document itself. No newer code-adoption ordinance, resolution, or updated fee-schedule packet was found anywhere on the Town's current website (centerco.gov) or its Documents/Building Department listing as of this review (2026-07-06). The prior townofcenter.colorado.gov CivicPlus-style site (which hosted the original seed URL, .../departments/public-works-department/building-department, and an alternate .../departments/building-department path) now 301-redirects at the domain root to www.centerco.gov — the entire old site has been retired and its content was not recoverable via Wayback Machine chase within this review; the Town's own current-generation site (a minimal TownCloud/SvelteKit site launched circa 2025-2026) is treated as authoritative and does not itself carry a separate 'Adopted Codes' page distinct from the Building Permit Application document.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date (2026 YTD)
No data reported
Full year 2025
No data reported

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • The seed URL (townofcenter.colorado.gov/departments/public-works-department/building-department) and its sibling path (.../departments/building-department) both now 301-redirect at the domain root to a completely new Town website, www.centerco.gov — the entire prior CivicPlus-style site has been retired. The new site is a minimal TownCloud/SvelteKit build (Documents/News/Agendas only, no dedicated department subpages), so all permitting information in this file was sourced from the Town's Documents page (Building Department category) and a dated Public Works Department news notice, not from a page matching the seed URL's original structure.
  • The Town's Public Works Department (not a separately named 'Building Department' division) administers permitting directly — a June 23, 2026 dated public notice from the Town explicitly frames all building-permit requirements as Public Works Department functions.
  • A flat, non-refundable $50.00 application fee applies to every permit type in Center, in addition to any valuation-based permit fee — this doubles the effective minimum cost of a small project (e.g., a $50 minimum reroof fee plus the $50 application fee = $100 total).
  • Center's building permit fee structure is genuinely simple relative to many peer jurisdictions: flat per-square-foot rates (residential $0.10/sq ft, commercial $0.20/sq ft, mobile homes $0.20/sq ft) with a $50 minimum, rather than a tiered valuation table.
  • Electrical AND plumbing permits are NOT issued by the Town of Center at all — both are handled entirely by the State of Colorado DORA/DPO Electrical and Plumbing Boards, per the Town's own Fee Schedule document and corroborated by Ordinance 339's explicit exclusion of those trades from the Town's contractor-licensing definition. This is a materially different structure from jurisdictions that run their own certified electrical/plumbing inspection programs.
  • Any contractor (other than electrical/plumbing) working on a job valued at $1,500 or more must hold a Town of Center Contractor's Registration (Ordinance 339, $50/yr General or $25/one-time Limited, plus a one-time $10 background-check fee) — carrying minimum $50,000 bodily injury / $100,000 property damage liability insurance.
  • Building permits in Center are valid for only 180 days (6 months) — a materially shorter window than many jurisdictions' 1-year permit validity — and require an end-of-permit inspection before any reissue (flat $50 reissue fee regardless of project size).
  • Center genuinely has a real, actively-maintained ADU program (Municipal Code Section 44-73/44-73.1) with objective administrative-approval standards (750 sq ft detached cap, 30% attached cap, 90-day minimum rental period) — a materially more developed ADU framework than one might expect for a town of this size. ADU zoning approval is a prerequisite to, but distinct from, the building permit needed to actually construct it.
  • HB22-1362 (Colorado's building energy-code/GHG statute) requires municipalities that update their building code on or after July 1, 2026 to adopt an equivalent-or-better energy code (with a rural-county carve-out tied to a state grant application, and a full exclusion for municipalities with no building code at all) — there is NO population-based exemption in this statute. Center currently operates on the 2018 IECC per its own Fee Schedule document and no updated code-adoption action was found after full chasing of its current website; this file reports that gap honestly rather than asserting compliance or exemption in either direction.
  • The Town of Center straddles Saguache County (majority of the town and its population) and Rio Grande County; several Town forms (e.g., the Demolition Application's landfill-notification checklist) explicitly branch by county — always confirm which county applies to your specific parcel/disposal site.
  • No adopted Climatic and Geographic Design Criteria chart, no separate trade-specific (non-electrical/plumbing) permit applications, and no dedicated 'Adopted Codes' page were found on the Town's current website after full chasing — the single Building Permit Application/Fee Schedule PDF is the Town's most complete currently-published source for code editions and fees, and is treated as authoritative since it is dated (revised 09/2025) and issued directly by Public Works.

Comparable nearby cities

Keenesburg
11 shared permit typesBoth on the 2018 International Plumbing Code (IPC)
Compare fees →