Version history — Center, Colorado
This is PermitBase’s own verified record for Center, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Center’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-21Superseded
- 2026-08-20Superseded
- 2026-08-13Superseded
- Center, Colorado — Sign Permit record added
- Center, Colorado — Fire Sprinkler and Fire Alarm System Permit record added
- Center, Colorado — Change of Use / Change of Occupancy Permit record added
- 2026-07-20Superseded
- Center, Colorado — Rooftop Solar PV Permit fee record added: Town Building Permit Fee (structural/roof-mount, filed under 'Other' on the combined Building Permit Application) ($0.10 per sq. ft. of floor space/area affected, $50.00 minimum, plus a $50.00 flat non-refundable Application Fee)
- Center, Colorado — Rooftop Solar PV Permit fee record added: State of Colorado Electrical Permit Fee (interconnection/wiring) (Set by the Colorado DORA/DPO Electrical Board, not the Town of Center)
- Center, Colorado — Rooftop Solar PV Permit fee record added: Statewide aggregate fee cap on active solar energy system installs ($500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284))
- Center, Colorado — EV Charger / EVSE Permit record added
- Center, Colorado — EV Charger / EVSE Permit fee record added: State of Colorado Electrical Permit Fee -- Commercial and Other Installations (Chart B), contract cost up to $2,000 ($100)
- Center, Colorado — EV Charger / EVSE Permit fee record added: State of Colorado Electrical Permit Fee -- Commercial and Other Installations (Chart B), contract cost $2,001 and above ($100 base plus $10 per each additional $1,000 (rounded up))
- Center, Colorado — EV Charger / EVSE Permit fee record removed: State of Colorado Electrical Permit Fee (EV charger circuit)
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Center began