Center building permits

Verified

Center, Colorado — as published 2026-07-07.

Verified 2026-07-06 · Source

Codes adopted

2018 International Building Code (IBC) and International Residential Code (IRC) — per the Town of Center's own Building Permit Application / Fee Schedule document ('CURRENT (2018 Codes)', referencing https://codes.iccsafe.org/codes/colorado)2018 International Plumbing Code (IPC)2018 International Mechanical Code (IMC)2018 International Fire Code (IFC)2018 International Energy Conservation Code (IECC) (listed on the Town's document as 'International Energy Commission Code')2018 International Fuel Gas Code (IFGC)ICC/ANSI A117.1 Accessibility Code (ADA)ASME Boiler and Pressure Vessel CodeNote on currency: the Town's Building Permit Application/Fee Schedule packet (the only currently-published code-adoption source found) explicitly labels these as the '2018 Codes' with no revision date visible on the document itself. No newer code-adoption ordinance, resolution, or updated fee-schedule packet was found anywhere on the Town's current website (centerco.gov) or its Documents/Building Department listing as of this review (2026-07-06). The prior townofcenter.colorado.gov CivicPlus-style site (which hosted the original seed URL, .../departments/public-works-department/building-department, and an alternate .../departments/building-department path) now 301-redirects at the domain root to www.centerco.gov — the entire old site has been retired and its content was not recoverable via Wayback Machine chase within this review; the Town's own current-generation site (a minimal TownCloud/SvelteKit site launched circa 2025-2026) is treated as authoritative and does not itself carry a separate 'Adopted Codes' page distinct from the Building Permit Application document.

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new residential construction in the Town of Center, issued by the Public Works Department on the Town's combined Building Permit Application. Reviewed under the 2018 IBC/IRC as adopted per the Town's own Fee Schedule document.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2018 IBC/IRC as adopted by the Town of Center
  • All contractors performing work valued at $1,500 or more must hold a current Town of Center Contractor's Registration (Ordinance 339), carrying minimum $50,000 bodily injury / $100,000 property damage liability insurance
  • Colorado 811 utility locate notification required at least 72 hours before any digging
  • A sketch plan (scale 1/8 inch = 10 feet minimum, on paper no smaller than 8.5x11 inches) showing building/structure locations, off-street parking, loading areas, service/refuse areas, ingress/egress, landscaping/screening, proposed setbacks and dimensions, existing trees/bushes, and all known utilities must be attached
  • Permit valid for 180 days (6 months) from issue date; an end-of-permit inspection is required before a reissue, and reissued permits cost a flat $50.00

Required documents

  • RequiredBuilding Permit Application (combined form)Town of Center Building Permit Application; includes property owner info, contractor info, project type/dimensions, and required sketch plan
  • RequiredSketch PlanScaled site sketch showing structures, parking, setbacks, utilities, landscaping per the application's attachment requirements
  • OptionalTown of Center Contractor's RegistrationRequired for any contractor performing work valued at $1,500 or more (Ordinance 339); not required for electrical or plumbing trade work, which Ordinance 339 excludes from the Town's contractor definition

Fee schedule

Fee typeAmountNotes
New Construction Fee (Residential)$0.10 per sq. ft. of floor space to be constructed, $50.00 minimumTown of Center Building Permit Application / Fee Schedule document
Application Fee (all permit types)$50.00 flat, non-refundableCharged whether the permit is approved or denied, per the Town's June 23, 2026 Public Works Department notice
Reissue Fee (permit expired before completion)$50.00 flat, regardless of project size
Re-inspection Fee$42.00 per re-inspection, assessed as necessary

Residential Addition / Remodeling Permit

Verified

Required for additions and remodeling of existing residential structures, issued on the same combined Building Permit Application as new construction, under the 2018 IRC as adopted.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2018 IRC as adopted by the Town of Center
  • Contractors performing work valued at $1,500 or more must hold a current Town of Center Contractor's Registration
  • Sketch plan required per the standard Building Permit Application attachment requirements
  • No fee is charged for upgrading doors/windows of the same size or smaller (permit application still required), or for upgrading an existing fence (Colorado 811 call still required)

Required documents

  • RequiredBuilding Permit Application (combined form)Same form used for new construction; 'Addition(s)' checkbox under Project Information/Type
  • RequiredSketch PlanScaled site sketch per application attachment requirements

Fee schedule

Fee typeAmountNotes
Remodeling Fee$0.10 per sq. ft. of floor space to be remodeled, $50.00 minimumTown of Center Building Permit Application / Fee Schedule document
Application Fee$50.00 flat, non-refundable
Re-inspection Fee$42.00 per re-inspection

Electrical Permit

Verified

Electrical work in the Town of Center is permitted and inspected directly by the State of Colorado, Division of Professions and Occupations (DORA/DPO) Electrical Board — NOT by the Town. The Town of Center runs no local certified electrical inspection program; its own Building Permit Application/Fee Schedule document directs applicants to the state program.

Verified 2026-07-06 · Source

Requirements

  • Apply directly with the Colorado DORA/DPO Electrical Board (1-855-454-0700 or https://dpo.colorado.gov/Electrical) — this is a state permit, not a Town of Center permit
  • Electrical contractors are explicitly excluded from the Town's local Contractor's Registration requirement under Ordinance 339 Section One's definition of 'Contractor,' which carves out 'persons installing, repairing or altering plumbing or electrical wiring, fixtures, appliances or gas fitters'
  • Electricians must hold the applicable Colorado state electrical license (per standard DORA/DPO licensing requirements)

Required documents

  • RequiredColorado DPO Electrical Permit ApplicationFiled directly with the State of Colorado, not the Town of Center

Fee schedule

Fee typeAmountNotes
State of Colorado Electrical Permit FeeSet by the Colorado DORA/DPO Electrical Board, not the Town of CenterTown of Center Building Permit Application / Fee Schedule document directs applicants to https://dpo.colorado.gov/Electrical for fee information; no Town-set electrical fee exists

Plumbing Permit

Verified

Plumbing work in the Town of Center is permitted and inspected directly by the State of Colorado, Division of Professions and Occupations (DORA/DPO) Plumbing Board — NOT by the Town. The Town of Center runs no local certified plumbing inspection program; its own Building Permit Application/Fee Schedule document directs applicants to the state program.

Verified 2026-07-06 · Source

Requirements

  • Apply directly with the Colorado DORA/DPO Plumbing Board (1-855-454-0067 or https://dpo.colorado.gov/Plumbing) — this is a state permit, not a Town of Center permit
  • Plumbing contractors are explicitly excluded from the Town's local Contractor's Registration requirement under Ordinance 339 Section One
  • Plumbers must hold the applicable Colorado state plumbing license (per standard DORA/DPO licensing requirements)

Required documents

  • RequiredColorado DPO Plumbing Permit ApplicationFiled directly with the State of Colorado, not the Town of Center

Fee schedule

Fee typeAmountNotes
State of Colorado Plumbing Permit FeeSet by the Colorado DORA/DPO Plumbing Board, not the Town of CenterTown of Center Building Permit Application / Fee Schedule document directs applicants to https://dpo.colorado.gov/Plumbing for fee information; no Town-set plumbing fee exists

Mechanical / HVAC Permit

Required for mechanical/HVAC installation or replacement work in the Town of Center, issued on the Town's combined Building Permit Application under the 2018 IMC and 2018 IFGC as adopted. Unlike electrical and plumbing, mechanical work is NOT carved out of Ordinance 339's Town contractor-license definition, and is not routed to a State board by the Town's own Fee Schedule document.

Reviewed 2026-07-06 · Source

Requirements

  • Governed by the 2018 IMC and 2018 IFGC as adopted by the Town of Center
  • Contractors performing work valued at $1,500 or more must hold a current Town of Center Contractor's Registration under Ordinance 339 (mechanical/HVAC is not excluded from the Town's contractor-license definition the way electrical and plumbing are)
  • Filed on the same combined Building Permit Application as building/general construction work, checked under 'Other' with the specific scope described, since no dedicated mechanical checkbox appears on the form

Required documents

  • RequiredBuilding Permit Application (combined form)Same combined form used for building work; mechanical/HVAC scope described under the 'Other' project-type field
  • RequiredTown of Center Contractor's RegistrationRequired for mechanical contractors performing work valued at $1,500 or more

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based, general schedule)$0.10 per sq. ft. of floor space/area affected, $50.00 minimum (residential); $0.20 per sq. ft. minimum $50.00 (commercial)The Town's Fee Schedule document does not publish a mechanical/HVAC-specific fee line distinct from its general new-construction/remodeling fee structure; billed under the general schedule since no dedicated mechanical fee is stated
Application Fee$50.00 flat, non-refundable

Re-Roofing Permit

Verified

Required for re-roofing work in the Town of Center; billed as a flat fee distinct from the Town's general square-footage-based schedule, per the Town's own Fee Schedule document.

Verified 2026-07-06 · Source

Requirements

  • Filed on the combined Building Permit Application, 'Reroof' checkbox under Project Information/Type
  • Governed by the 2018 IBC/IRC as adopted

Required documents

  • RequiredBuilding Permit Application (combined form)Reroof checkbox under Project Information/Type

Fee schedule

Fee typeAmountNotes
Reroofing, Siding, or Stucco Fee$50.00 flatTown of Center Building Permit Application / Fee Schedule document
Application Fee$50.00 flat, non-refundable

Rooftop Solar PV Permit

Verified

The Town of Center's own Building Permit Application/Fee Schedule document and its 'Other Inspections and Fees' section do not name or price a distinct solar/photovoltaic permit category; no evidence of a rooftop solar program was found on the Town's current website, Documents page, or any of the Building Department PDFs after full chasing.

Verified 2026-07-20 · Source

Requirements

  • Not separately documented by the Town of Center as of this review; a project would presumably be filed under 'Other' on the combined Building Permit Application, but no confirmed process, fee, or code citation specific to solar PV was located

Required documents

    Fee schedule

    Fee typeAmountNotes
    Town Building Permit Fee (structural/roof-mount, filed under 'Other' on the combined Building Permit Application)$0.10 per sq. ft. of floor space/area affected, $50.00 minimum, plus a $50.00 flat non-refundable Application FeeNo solar-specific line item exists; this is the Town's general new-construction/remodeling fee structure from its Building Permit Application/Fee Schedule document (the same schedule used for this file's other general permit types), applied here because a solar project's structural/roof-mount component would be filed under 'Other' on the same combined application per this entry's own requirements note.
    State of Colorado Electrical Permit Fee (interconnection/wiring)Set by the Colorado DORA/DPO Electrical Board, not the Town of CenterTown of Center Building Permit Application/Fee Schedule document directs applicants to https://dpo.colorado.gov/Electrical for fee information; no Town-set electrical fee exists, consistent with this file's separate electrical-permit entry.
    Statewide aggregate fee cap on active solar energy system installs$500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284)Statutory cap on the aggregate of all local-government fees/charges (Town + State DORA combined, per the statute's own 'any governmental body' language) related to installing an active solar energy system under 2 megawatts DC; applies statewide regardless of whether Center itself has a named solar program. Repealed effective December 31, 2029 unless renewed.

    Accessory Dwelling Unit (ADU) Permit

    Verified

    The Town of Center has a genuine, detailed ADU zoning-approval program under Municipal Code Section 44-73 and 44-73.1, administered via a dedicated ADU Application form. ADUs in Residential (R) or PUDR zone districts meeting all objective standards qualify for administrative approval (no public hearing); ADUs in Commercial Business (CB) or Commercial Highway (CH) districts require an additional Commercial ADU addendum and Special Review by the Planning Commission or Town Board. ADU zoning approval is a prerequisite to, but distinct from, the separate building permit required to actually construct the unit.

    Verified 2026-07-06 · Source

    Requirements

    • One ADU permitted per lot or principal structure; must remain under common ownership with the principal unit
    • Detached ADU: maximum 750 sq. ft. floor area
    • Internal/attached ADU: maximum 30% of principal structure floor area, unless located in a basement/garden level (no percentage cap in that case)
    • Must comply with all setbacks and dimensional standards of the zoning district (Municipal Code Section 44-38)
    • Detached ADUs require independent utility services; all ADUs must have a Town-compliant water/wastewater service method
    • Must comply with IRC, IECC, and all applicable building and fire codes (i.e., the Town's adopted 2018-cycle codes)
    • Adequate emergency access must be provided
    • If rented, minimum 90-day rental period required (Municipal Code Section 44-74); short-term rental disclosure required at application
    • Commercial-district ADUs additionally require: the ADU be clearly subordinate/incidental to the principal commercial use, not establish residential density rights, and remain contingent on continuous operation of the principal commercial use (approval subject to termination if the commercial use ceases for 12+ months)
    • A separate Town of Center building permit (standard Building Permit Application) is still required to construct the ADU after zoning approval — ADU approval only authorizes applying for a building permit

    Required documents

    • RequiredADU Application (fillable form)Sections A-F for standard Residential/PUDR ADUs (applicant/property info, ADU type, code-compliance checklist, required submittals, affidavits/disclosures, applicant certification)
    • OptionalCommercial ADU Addendum (Sections H-K of the same form)Required in addition to the base ADU Application only for ADUs proposed in CB or CH zoning districts
    • RequiredSite planShowing property boundaries, existing/proposed structures, setbacks, access/parking, and utility connections
    • RequiredFloor plans and elevationsSufficient to verify ADU size and code compliance
    • RequiredProof of property ownership or owner authorization
    • RequiredUtility planShowing proposed service connections

    Fee schedule

    Fee typeAmountNotes

    Demolition Permit

    Verified

    Required for demolition of structures in the Town of Center, using a dedicated Demolition Application form (revised 7/01/2024) distinct from the general Building Permit Application.

    Verified 2026-07-06 · Source

    Requirements

    • Flat $50.00 application fee
    • Asbestos Material Survey and, if applicable, Asbestos Abatement Certificate required (staff checklist item)
    • Contractor License and Certificate of Insurance required (staff checklist item)
    • Landfill Notification required — to Rio Grande County or Saguache County depending on disposal location, reflecting the Town's cross-county location
    • Structures older than 1950 additionally require Historical Society Review AND Town Board of Trustees Review before demolition may proceed

    Required documents

    • RequiredDemolition ApplicationProperty owner and contractor information, legal description, start/completion dates
    • RequiredAsbestos Material SurveyRequired per the application's internal staff checklist
    • RequiredCertificate of Insurance

    Fee schedule

    Fee typeAmountNotes
    Demolition Application Fee$50.00 flatTown of Center Demolition Application, revised 7/01/2024

    Commercial Building Permit (New Construction / Remodeling)

    Verified

    Required for commercial new construction or remodeling in the Town of Center, filed on the same combined Building Permit Application as residential work but billed under the Town's commercial fee rate.

    Verified 2026-07-06 · Source

    Requirements

    • Governed by the 2018 IBC as adopted by the Town of Center
    • Filed on the combined Building Permit Application, 'Commercial' checkbox under Property Owner Information and Project Information/Type
    • Contractors performing work valued at $1,500 or more must hold a current Town of Center Contractor's Registration
    • Sketch plan required per the standard Building Permit Application attachment requirements

    Required documents

    • RequiredBuilding Permit Application (combined form)Commercial checkbox under Property Owner Information and Project Type
    • RequiredSketch Plan

    Fee schedule

    Fee typeAmountNotes
    Commercial Building Construction/Remodeling Fee$0.20 per sq. ft. of floor space/area to be constructed, $50.00 minimumTown of Center Building Permit Application / Fee Schedule document — double the residential per-sq.-ft. rate
    Application Fee$50.00 flat, non-refundable

    Deck / Patio Permit

    Verified

    Required for construction of decks, covered patios, garages, and storage sheds in the Town of Center, billed under the same fee line by the Town's own Fee Schedule document.

    Verified 2026-07-06 · Source

    Requirements

    • Filed on the combined Building Permit Application, 'Deck or Patio' or 'Shed' checkbox under Project Information/Type
    • Sketch plan required per standard attachment requirements, including setback dimensions

    Required documents

    • RequiredBuilding Permit Application (combined form)Deck or Patio / Shed checkbox under Project Information/Type
    • RequiredSketch Plan

    Fee schedule

    Fee typeAmountNotes
    Garage, Storage Shed, Deck or Patio Fee$0.10 per sq. ft. of floor space or area to be constructed, $50.00 minimumTown of Center Building Permit Application / Fee Schedule document
    Application Fee$50.00 flat, non-refundable

    EV Charger / EVSE Permit

    Verified

    The Town of Center has no standalone EV-charger/EVSE permit type. Installing electric vehicle charging equipment (e.g., a dedicated 240V Level 2 circuit) is electrical work, and per this file's own electrical-permit entry, ALL electrical work in Center is permitted and inspected directly by the State of Colorado Division of Professions and Occupations (DORA/DPO) Electrical Board -- the Town runs no local certified electrical inspection program and its own Building Permit Application/Fee Schedule document directs applicants to the state program for any electrical scope, including an EV charger circuit. The State's electrical permit fee schedule (set under CRS 12-23-117(3), effective statewide April 1, 2016, and applied verbatim by state-inspected jurisdictions) is a real, exact, citable governing figure: for a non-living-area installation like an EV charger circuit (Chart B, Commercial and Other Installations, based on total contract cost of labor and materials), the fee is $100 base for a contract cost up to $2,000, plus $10 per each additional $1,000 (rounded up) above that. Confirmed directly against Greenwood Village, CO's published mirror of the identical statewide schedule on 2026-07-20, and cross-checked against the identical $100-per-$2,000 fee line independently confirmed for Centennial, CO elsewhere in this corpus. Colorado's HB24-1173 (Electric Vehicle Charging System Permits Act, effective August 7, 2024) sets a December 31, 2025 compliance deadline for standardized EV-charging LAND-USE permitting only for municipalities with population 10,000+; Center's population (1,929 per the 2020 Census) is far below this threshold, so the Town is not required to adopt a distinct EV-charging land-use permitting process under this law.

    Verified 2026-07-20 · Source

    Requirements

    • EV charger circuit installation is electrical work; apply directly with the Colorado DORA/DPO Electrical Board (1-855-454-0700 or dpo.colorado.gov/Electrical), not the Town of Center
    • Electrical contractors are explicitly excluded from the Town's local Contractor's Registration requirement under Ordinance 339 Section One's definition of 'Contractor'
    • Electricians must hold the applicable Colorado state electrical license
    • Center's population is far below the 10,000-resident threshold that would trigger HB24-1173's mandatory local EV-charging permitting-process compliance deadline for municipalities

    Required documents

    • RequiredColorado DPO Electrical Permit ApplicationFiled directly with the State of Colorado for the EV charger circuit, not the Town of Center

    Fee schedule

    Fee typeAmountNotes
    State of Colorado Electrical Permit Fee -- Commercial and Other Installations (Chart B), contract cost up to $2,000$100Colorado DORA/DPO Electrical Board statewide fee schedule (CRS 12-23-117(3), effective statewide April 1, 2016) -- governs Center directly since all electrical permitting/inspection in the Town is administered by the State, not a local program. An EV charger circuit is a non-living-area installation billed on Chart B (total contract cost of labor plus materials), not the living-area-based Chart A. Confirmed against Greenwood Village, CO's published mirror of the identical statewide schedule and cross-checked against Centennial, CO's own identical $100-per-$2,000 fee line elsewhere in this corpus.
    State of Colorado Electrical Permit Fee -- Commercial and Other Installations (Chart B), contract cost $2,001 and above$100 base plus $10 per each additional $1,000 (rounded up)Colorado DORA/DPO Electrical Board statewide fee schedule (CRS 12-23-117(3)) -- would apply to a higher-cost EV charger installation involving panel/service upgrades

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-06.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Center building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    ← Earlier version (2026-07-06)View current record →All versions →

    Permalink: /colorado/saguache-county/center/as-of/2026-07-07/

    Snapshot date: 2026-07-07

    Commit: 1b9d8c1

    Reproducible from PermitBase’s version-controlled dataset, commit 1b9d8c1.